Mesaba Energy project (MEP) is a new utility scale IGCC power plant using ConocoPhillips' E-Gas technology for Coal gasification. Excelsior Energy Incl. applied to the Minnesota Public Utilities Commission (MPUC) for site permission to construct and operate a 1,212 Megawatt Integrated Gasification Combined Cycle electric power generating station…
Download full paper
Polish This Essay
The Mesaba Energy Project
Read TextPreview

Extract of case study "The Mesaba Energy Project"

Download file "The Mesaba Energy Project" to see previous pages... The site should accommodate multiple generating units, covering more than 1,000 acres to provide buffer zone between the plant facilities and nearby communities. Preferred project location is West Range Plant Site, Greenfield which is designated for auxiliary mining purposes ("Area Definitions"). The main objective for this site is due to Iron range that is only about 70 miles northwest of Duluth near Taconite and Bovey.
Let us write or edit the essay on your topic "The Mesaba Energy Project" with a personal 20% discount.. Try it now
Other than this, natural gas pipelines, high voltage transmission line corridors and viable rail service are also the deciding factors. An alternate site is also under consideration, located in the east range plant site; which is closer to Hoyt Lake iron range, about 50 mile north of Duluth and has access to water as well as feed-stock transportation option ("Minnesota Hydrology Guide", 1992). An estimated total project costs approximately $1.97 Billion, Department of Energy share is $36 Million. It is expected to complete construction work by 2011 and after that within one year to start its operation. The main attributes to this project are, 2005 Energy Policy Act that provides loan guarantees, legislatively mandated PPA with Northern States Power (A3/BBB-), Regulatory incentives and exemption from certificate of need, Public support and large demand in market, and fuel flexibility or lowest-cost fuel ("Mesaba").

MEP: From Coal to Technology
Project is supposed to be designed with a thought as fuel efficient where primary material is coal; a small statistic outlines the fuel compositions which can be used interchangeably; 100% coal including Powder River Basin sub-bituminous and Illinois No. 6 bituminous coals, up to 1:1 ratio of coal and petroleum coke blend and petroleum coke. A group of MIT studied on role of coal to lessen its effect on global climate change. They came up with a result that carbon capture and sequestration (CCS) technology can reduce carbon dioxide emission to a significant amount without hampering its energy output requirement. According to Dr. Deutch:
As the world's leading energy user and greenhouse gas emitter, the U.S. must take the lead in showing the world CCS can work. Demonstration of technical, economic, and institutional features of CCS at commercial scale coal combustion and conversion plants will give policymakers and the public confidence that a practical carbon mitigation control option exists, will reduce cost of CCS should carbon emission controls be adopted, and will maintain the low-cost coal option in an environmentally acceptable manner.
Coal is a low cost and its usage is increasing day by day. So using coal directly without CCS will affect the climate directly leading to a global change. CCS enables coal to meet its energy criteria in future and in parallel saving the atmosphere from CO2 emissions as coal contains a high carbon percentage ("Future of Coal", 2007). Fuel gasification is done first which is a process of converting coal, petroleum coke etc into gaseous state from solid one. It is similar to natural gas and used for electric power generation. The gasification process that MEP will use is ConocoPhillips' E-Gas technology. Raw materials are first crushed and slurry is formed which is pumped ...Download file "The Mesaba Energy Project" to see next pagesRead More
Cite this document "The Mesaba Energy Project"
  • APA
  • MLA
  • CHICAGO
(“The Mesaba Energy Project Case Study Example | Topics and Well Written Essays - 1500 words”, n.d.)
The Mesaba Energy Project Case Study Example | Topics and Well Written Essays - 1500 words. Retrieved from https://studentshare.org/miscellaneous/1502819-the-mesaba-energy-project
(The Mesaba Energy Project Case Study Example | Topics and Well Written Essays - 1500 Words)
The Mesaba Energy Project Case Study Example | Topics and Well Written Essays - 1500 Words. https://studentshare.org/miscellaneous/1502819-the-mesaba-energy-project.
“The Mesaba Energy Project Case Study Example | Topics and Well Written Essays - 1500 Words”, n.d. https://studentshare.org/miscellaneous/1502819-the-mesaba-energy-project.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC "The Mesaba Energy Project"
External Analysis on Noble Energy INC
The internal business environment is inner to the organization and remains within the control of the firm. However, the external business environment remains beyond the control of the organization. As a result of that it is important to analyze the external business environment and accordingly develop strategies to cope up with the external threats and capitalize on the opportunities of the market.
14 Pages(3500 words)Case Study
Project management
ii. Effective Capacity Effective capacity is the actual outcome of plant operations. In the case study, effective capacity can equal or be slightly less than the designed capacity. The effective capacity will be 80% * 20,000 kg = 16,000 kg iii. Actual Output Output as measured which in this case is 60% * 20,000 kg = 12,000kg iv.
6 Pages(1500 words)Case Study
Project Management
The main focus in this is the reduction or crushing of the project activities found within the critical path while shortening the duration of the project (Martin & Karen 220). In the cost-time tradeoffs, the main issue to be considered is the overtime or change in the equipment so as to make the work proceed faster.
4 Pages(1000 words)Case Study
Scottish & Southern Energy plc
Through subsidiaries, such as Southern Electric, Scottish Hydro-Electric, SWALEC, and Atlantic Electric and Gas, the company is also involved in electrical and gas trading, utility tracking, energy trading, and telecommunications. The paper will conclude by considering the ways in which SSE views the future, through which an attempt will be made to assess whether the company can continue their current sustain of growth, and what factors need to be addressed in order to assure the continuation of their success.
6 Pages(1500 words)Case Study
Emerald Energy Plc
The financial performance of the Company during the year 2008 which enabled the Company to generate spectacular cash reserves was so impressive that it made a comparison of the performance of the during the previous year's interesting. The following sections of this paper present a detailed financial analysis of the company based on various key ratios worked out from the information available in the published financial statements.
11 Pages(2750 words)Case Study
Fuel and energy
UK being a significant player in the global arena is also going ahead with a number of pioneering efforts towards making the safety and security of the lives of its citizens. All such efforts require energy and fuels. But somewhere done the line, such rapid advancements are also leading to adverse side-effects.
4 Pages(1000 words)Case Study
The Mesaba Energy Project
There are many coal fired electricity generating plants in America but the Mesaba energy project is using an innovative low-cost
7 Pages(1750 words)Essay
Geothermal Energy
Geothermal grounds or geothermal reservoirs are such spots on the earth’s crust that allow the geothermal energy to be dispensed. A geothermal power plant
2 Pages(500 words)Case Study
Competition in Energy Drinks
Further, this growth would arise from the steady increase in consumers’ purchasing power, especially in developing countries. The changes in consumer preferences globally also have a direct influence on the sales figures of beverages. The
5 Pages(1250 words)Case Study
Midland Energy Resources Inc
However, it would be beneficial for the company to invest in corporate level by using corporate level WACC. a) E&PrE = rf + β(EMRP)rE = 4.98% +
2 Pages(500 words)Case Study
Let us find you another Case Study on topic The Mesaba Energy Project for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us