Works Measurement and Methods of Approximate Estimating - Assignment Example

Summary
The writer of the paper “Works Measurement and Methods of Approximate Estimating” states that throughout the planning, design and construction phase of a project, cost estimating is often adopted as a useful tool of cost management. There are a number of methods used in the preparation of the approximate estimates…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.6% of users find it useful

Extract of sample "Works Measurement and Methods of Approximate Estimating"

Name of Student Subject Date Coursework 1. Write a brief report outlining how works were measured in the past from the 1850s including the SMM period and how they have changed recently by the introduction of the NRM suit. (Max 750 words count plus illustrations where appropriate). Throughout the planning, design and construction phase of a project, cost estimating is often adopted as a useful tool of cost management. Once the initial budgetary estimates have been established, it is vital to validate the adopted postulates and assumptions through employing certain series of precise techniques of cost estimating. The art of building and constructions can be traced to the ancient ages of the Egyptian, Roman and Greek civilizations. It has however evolved and transformed considerably, becoming more civilised in the manner of portraying and expressing the vision and ideas conceived by the builders. With the industrial revolution, besides the modernising the building practices, it has heralded a vital transformation in the science of value costing as well as cost documentation within the construction world. This transformation led to the realisation of the formalised bill of quantities (BoQs) in the1859. Before that costing was done by ‘measurers’, which quantified and valued the building works after completion and regularly submitted to the client for payment. During bidding or tendering stage, each builder was required to come up with accurate project costs estimates, done by quantifying all the materials and labour required to complete the project. They realized that they were basically duplicating a lot of time and effort quantifying the architects design drawings. Instead they devised a way of employing a professional quantifier to generate the BoQs, forming the basis of preparation of their tenders. During this period, the function of the Boq was basically to form the basis of project costing. With time however, this has evolved, making it to be applicable during both pre- contracting as well as post contracting phases of a project. For instance, in the Great Britain, the concept of consensus of a single price was widely adopted and was driven by client demands. In the 19th century, two major changes occurred. First, in order to set up and generate the fixed price of a project, it was imperative for full details of the proposed project be drawn up clearly, through drawing and design. The next challenge was to determine who between the architect and the engineer or the general contractor is supposed to measure the building works to be constructed. The challenge was solved by the engineer who acknowledged that much of the building works is determined by site conditions and those theoretical quantities of the project needs to be provided based on the bid figures provided by the contractors with the work being re-measured on completion. This simple approach is still being applied in moth earth works projects. For most of the 19th century, in Great Britain, a compromise was reached out, through which the contractors were provided with the BoQ by the architect, which were in some cases measured by an independent body, with the directions that cost of preparation is to be included in each bidding company’s prices. In the UK the Infrastructure Directorate adopted the Stardard method of measurement for construction works, as a replacement of the measurement procedures described above. The advantage of the Standard Method of measurement (SMM) in order to assist in the development of standardisation and consistency of the rates and schedules of bill of quantities thereby providing the following: A systematic structure of bill of quantities and schedules of description and itemisation Standardization of layout, bill of quantities and schedules or rates Standardization of method of measurement estimating and costing of items Subdivision of work on items leading to a consistent, reliable and traceable procedure The objective of SMM is to: Offer such information of the quantities of work thus enabling tenders and estimates are prepared accurately, consistently and efficiently. Offer basis of accurate and updated project planning Provide uniform and consistent data to be adopted in cost databases New Rules of Measurement suite are being adopted to offer a set of measurement guidelines that are understandable to anyone within the construction industry, as well as applicable in all construction spheres (Tas,.2005). Although fundamentally based on Great Britain and thereafter UK practice, the necessity for a coordinated set of guidelines and the underlying concept behind the this new order of cost estimation and cost planning for the capital building projects, has a worldwide applications. This order describes both new building works as well as maintenance works for the purpose of initial as we well as elemental costs during planning and design phase. 2. Describe three methods of approximate estimating Approximate estimating also referred to as order- of-magnitude estimates refers to the estimates prepared during the initial stages of a project lifecycle. There are a number of methods used in the preparation of the approximate estimates as described below. Besides, the use of approximate estimating during the initial project lifecycle, the below methods are in some cases adopted for cost estimates during the detailed design phase of project development lifecycle. Unit estimate This technique of approximate estimating is adopted in the preparation of the preliminary estimates i.e. during the projects conceptual planning phase. This sometimes is referred to as order-of-magnitude type estimate. Ideally during this phase, the total cost estimate is pegged on a single factor. Some of the notable terms and phrases used in unit approximation are ‘per unit factors’ such as cost per cubic metre of concrete, maintenance cost per hour, fuel cost per kilometre, cost per tonne of aggregate etc. Basically the total cost is computed by multiplying the number of units and the unit cost factor of the parameter. For instance if the cost of constructing a unit house is$18,000, and there are 17 housing units to be put up, this means the approximate project estimate is $18,000x17=$306,000. Details of the unit costs may be retrieved from actual costs realised in previous similar projects. It may be necessary to adjust the ‘per unit factor’ lifted from past projects since this varies based on project size, existing market conditions, location and other factors unique to such projects. The accuracy depends on the reliability of the data sourced by the estimator. Factor estimate In this type of approximate estimation, the projected estimate is split into different segments and cost of each segment is computed separation and the final cost calculated by summing up individual segments’ costs (Neil Sinclair 1989). This leads to a more detailed method of cost estimate which gives improved accuracy. This method is favourable in situations where diverse components are involved in cost estimations. For instance by using the illustration of building a multi-storey shopping mall, through unit method total cost may be computed by multiplying the floor space and the cost per square foot of floor space(Wendes, 1976). However, improved estimate can be achieved if the floor space of various rooms such as supermarket, banking hall, java house, and hallway can be computed separately using distinct cost per unit cost associated with each amenity. The required information on materials and equipment can be sourced from the suppliers and manufactures. Cost indexes This method of approximate estimating is adopted for calculating the preliminary project cost estimates by considering past similar projects. In this scenario, cost indices are adopted. Cost indices are basically dimensionless numerical values which show the changes in prices of the both individual and multiple costs items over a period of time. Cost indices update past cost figures to achieve current costs estimates. For a single item, cost indexes are computed as the ratio of current cost of the item (current year), to the cost of the similar item at some point in future (reference year), multiplied by the respective value of the cost index applicable for the reference year. In multiple items, a composite weighted index for the reference through an intricate concept of assigning appropriate weightage factors for the items. References Stapel Silke, Eurostat, Paper submitted to international conference on ICP World Bank, Washington, DC (11-13 March 2002). D. Neil Sinclair, Estimating for Abnormal Conditions, Industrial Press, Inc., New York, New York, 1989 D.W. Avery, “Problems of Locality in Construction Cost Forecasting and Control,” in Building Cost Techniques, edited by P.F. Brandon, E.F.N. Spon Ltd., New York, New York, 1982. H.C. Wendes, The Eight Facets of the Estimating Diamond, Heating/Piping/Air Conditioning, October 1976, pp. 51-56. The Business Roundtable, Modern Management Systems, The Business Roundtable, New York, New York, Report A-6, November 1982. R. Brown, Investigating into the Feasibility of Applying the Pareto Principle to SMM Bills of Quantities and Cost of Planning, Project Report, Loughborough University, UK. Tas, E., Yaman, H., (2005) A Building Cost Estimation Model Based On Cost Significant Work Packages, Engineering Construction and Architectural Management, 12 (3), 251-263. Read More

CHECK THESE SAMPLES OF Works Measurement and Methods of Approximate Estimating

Characterization models of poroelastic materials: A review

This model works on the assumption that the thermal effects are dependent on frequency.... The model works well for low frequencies.... The Mechel-Ver Model also works well at low frequencies, unlike the Delany-Bazley model (Sagartzazu, Hervella-Nieto, & Pagalday)....
10 Pages (2500 words) Research Paper

Operant Conditioning and Pre-Morbid State

Evaluating methods for estimating pre-morbid intellectual ability in closed head injury.... These include reading ability, approximate founded on demographic variables and lexical decision-making.... This could arise when methods used end up compromising the health of a client....
3 Pages (750 words) Assignment

Progress in Wireless Communications over the Last Decade

Some of the simplest methods for global localization include landmark-based localization and triangulation.... Cellular Location methods Cellular location methods use the signals of the cellular system to find the location of a mobile station.... Since cellular systems were not originally designed for positioning, the implementation of different location methods may require new equipment to make the necessary measurements for location determination and new signaling to transfer the measurement results to the location determination unit....
11 Pages (2750 words) Essay

Precision in Management Accounting

The paper "Precision in Management Accounting" highlights that with the changing business environment, the scope of cost accounting has now been extended further to accumulate and analyze a variety of information that helps executives to fulfil organizational goals.... ... ... ... Since the last few decades, with the changes in the business environment, management techniques have proliferated at an unprecedented rate....
9 Pages (2250 words) Essay

Personality and Individual Differences

This involves a multi-step, cyclical process of intuition, inductions and deductions, verification which is gradually converged on consensual descriptive organisation of broad classes of variables and methods used to analyse them.... Some of the methods which study these aspects range from laboratory experiments, data reduction techniques like factor analysis and longitudinal field studies.... Individual differences of reliability and stability are the most important measurement issues (Funder, 2001)....
6 Pages (1500 words) Essay

Pre-Contract Cost Planning and Cost Controlling

"Pre-Contract Cost Planning and Cost Controlling" paper states that cost control should be provided from start to completion of the project, ensuring that the estimated final cost is always known.... However, Pre-contract Cost Controlling is quite different from Post-contract Cost Controlling.... ...
9 Pages (2250 words) Coursework

Establishing Construction Economics

This case study "Establishing Construction Economics" presents the fundamental theme of economics as being the study and science of scarcity and effective or intelligent decision-making.... Based on the aforementioned theory, the assignment investigates the problems and issues, arising due to scarcity....
48 Pages (12000 words) Assignment

Human Resources Management Methods

The paper 'Human Resources Management methods ' is a thrilling example of human resources essay.... The paper 'Human Resources Management methods ' is a thrilling example of human resources essay.... The paper 'Human Resources Management methods ' is a thrilling example of human resources essay.... As for the more narrowed topic of this research, it is about defining and discussing in detail different methods and approaches of human resource management....
7 Pages (1750 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us