The "Project Management of the Abutment Bridge" paper describes work breakdown structure, design of the abutment bridge, design loads and load combinations, load and load combinations for the bridge design, and presents recommendations for amending the program. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97% of users find it useful

Extract of sample "Project Management of the Abutment Bridge"

The guiding criterion for this design structure is informed by the need to minimize costs associated with total investment in the construction as well as ensuring that maintenance costs. One of the reasons that increase costs for maintenance of bridge constructions is damage to bearings at the abutment as well as the expansion joints and usually, this costs as compared to the costs of the construction of road bridges is usually higher for medium class and short bridges (Hirakawa, Minehiro, Hiroyuki & Tatsuoka 2014).

This is an attribute of the design that this specified design has to cater to by introducing the integral abutment structures with the capacity to omit expansion joints and bearingsWork Breakdown StructureDesign of the Abutment BridgeThe design of this abutment bridge has two parts: a) the main structure that has the superstructure, the Abutment Bridge framework, the abutment wall, and the foundation; b) the approach embankment that is built on top of the main structure. This design is made for a bridge that is less than 40m with a height of 10m.

This height is limited since lateral displacements increase with an increase in height due to the insertion of earth pressure (Hirakawa, Minehiro, Hiroyuki & Tatsuoka 2014). In this design, the shape of the superstructure is straight since skewed bridges have unpredictable structural behaviors when there is a difference in the inertial force exerted on the superstructure compared to the earth pressure exerted on the backfill (Wysocki 2013).The materials from which the embankment (backfill) is made is sand or at the very least, gravel soil that is able to properly compact as artificial lightweight materials are inappropriate due to the instability that they cause to the whole structure (Harrison & Lock 2004).

In this design, as shown in figure 1 below, the design length from the bottom of the abutment wall and the top of the supporting wall is maintained more than 4m based on the deformation capacity of the foundation based on the State Bridge Design Manual (v2008). 

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Project Management Assignment Example | Topics and Well Written Essays - 750 words, n.d.)
Project Management Assignment Example | Topics and Well Written Essays - 750 words. https://studentshare.org/management/2054260-project-management
(Project Management Assignment Example | Topics and Well Written Essays - 750 Words)
Project Management Assignment Example | Topics and Well Written Essays - 750 Words. https://studentshare.org/management/2054260-project-management.
“Project Management Assignment Example | Topics and Well Written Essays - 750 Words”. https://studentshare.org/management/2054260-project-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Management of the Abutment Bridge

Tower Bridge London

Name Tutor Institution Subject Code Tower bridge London Bridges are structures constructed along two points in order to avoid rivers or canyons.... hellip; Many a time's, construction of bridges relies entirely on the length of the bridge and the topography of land on which they are to be constructed.... Town bridge is a combined bascule and a suspension bridge located in England's London city.... The bridge is close to the tower of London from where its name was derived....
8 Pages (2000 words) Admission/Application Essay

Widening a Bridge called Wonboyn River bridge

Wonboyn River bridge ... … Wonboyn River bridge Name: Instructor: Course: Date: Wonboyn River bridge 1.... There will be the risk of the bridge construction falling.... The components of the bridge at this point require minimum tension until the slabs are laid and until they dry up.... Figure 1: Under bridge support 1.... The transportation of the slabs has to take care of other road users because the old bridge and the old pier are the only remaining alternative channels of transportation (Mecanismo, 2011)....
5 Pages (1250 words) Assignment

Defining Ground Subsidence, Effects of Subsidence on Structures

The ground is such a precious commodity for human society.... It provides the nutrients that nourish plants and trees which in turn nourishes the succeeding levels of the food pyramid.... The desire to accumulate it has led to remarkable campaigns of war and heroic exploits.... hellip; It is the place where men built their dreams, their castles, their empire and their home....
23 Pages (5750 words) Essay

Smithfield Street Bridge

The bridges were built by famous bridge engineers like Lewis… Roebling.... America was swift to identify their unique abilities in the bridge engineering field.... he essay will deal with the three bridges elected at the Smithfield Street and how their construction revolutionized the bridge construction technology in the 19th century when civilization was developing at a remarkable speed ... he first bridge among the Pittsburghs highway bridges was known as the Monongahela bridge....
13 Pages (3250 words) Research Paper

The Negative Reputation of the Constructors of the London Millennium Bridge

The paper describes the first main challenge in the development of the bridge that was the initial designing process, as different firms looked for ways to make a unique suspension footbridge.... hellip; As the bridge, from the moment its existence was conceptualized through the 1996 competition, was intended to be opened for the new millennium.... The constructors made the building timetable accordingly, and the bridge opened on June 10, 2000....
14 Pages (3500 words) Research Paper

Planning and Development of the Project of Millennium Bridge

The main theme which was intended to make this complex structure of bridge look to appear simple in appearance suspended with only cables over River Thames giving the pedestrians, incredible view of city London away from the rush of traffic.... The bridge is 4 meter in width, and the deck is made up of Aluminum flanked by stainless steel balustrades and is supported by cables to each side.... As compared to other conventional style bridges, this bridge is comparatively very shallow where the cables slump 2....
10 Pages (2500 words) Research Paper

Modelling and Optimal Control of Tower Crane Motions

A bridge to span 8m with a further 1.... fter employing multiple strategies to limit expenditures, enhance revenues, and reverse substantial losses, the company immediately adopted cost-cutting measures and six-sigma to realize quality management, which is vital for quality products.... We have successfully managed this project thus we have a quality and experienced team....
11 Pages (2750 words) Case Study

URGENTProject Management

… Introduction The four bridge abutments will be built in for the bridge and from exaction to filling up.... The Introduction The four bridge abutments will be built in for the bridge and from exaction to filling up.... The following shows the diagram of the proposed bridge abutmentWork Breakdown Schedule (WBS) The Work Breakdown Schedule (WBS) for the construction of bridge abutment showing deliverables, work packages and activities to be undertaken....