StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Nobody downloaded yet

Project Scope Management - Bostons Big Dig - Case Study Example

Cite this document
Summary
Due to constantly growing number of population, the Boston’s “Big Dig” was one of the most optimistic and complex transportation projects was undertaken within the United States over the past 25 years (massDOT, 2014a). Basically, this project aims to solve the traffic…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.2% of users find it useful
Project Scope Management - Bostons Big Dig
Read Text Preview

Extract of sample "Project Scope Management - Bostons Big Dig"

Download file to see previous pages

The paper 'Project Scope Management - Boston’s Big Dig" is a great example of a management case study. Due to the constantly growing population, Boston’s “Big Dig” was one of the most optimistic and complex transportation projects was undertaken within the United States over the past 25 years (MassDOT, 2014a). Basically, this project aims to solve the traffic congestion problem, tunnels, elevation of Central Artery (I-93), connecting lanes, and bridges were constructed between 1982 to 2008 (MassDOT, 2014a).

The expected outcome of this project includes the need to provide an effective solution to the end-users and complete the construction projects within the expected schedule and available fund. The planning stage plays a crucial role in the success of project management because it serves as a guide for project execution (Schwalbe, 2009). Therefore, project managers are expected to identify tasks that need to be completed, who will complete the project, and when will the project be completed (McGhee and McAliney, 2007).

Unfortunately, the project manager of Big Dig encountered problems related to human errors caused by the engineers, limited budget, and meeting the expected completion of each project. Product Life Cycle ModelPlanning is the second stage in the product life cycle model (Gido and Clements, 2012). Basically, the tasks done in the planning stage include: defining the scope and goals of each project, setting a schedule for each project, carefully analyzing how the available budget can be fully utilized in each project, determining how to come up with good quality road projects at the lowest possible cost, what are the necessary risk management, and how to make full use of the available materials and human resources (Gido and Clements, 2012).

With regards to weather (i.e. rainy season, winter, etc.), the planning stage also determines the best time to start the construction project (Gido and Clements, 2012). In relation to the Big Dig project, the product life cycle model represents the four (4) major phases the project planner has to consider.

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Project Scope Management - Individual Assignment - 1, n.d.)
Project Scope Management - Individual Assignment - 1. https://studentshare.org/management/1844582-project-scope-management-individual-assignment
(Project Scope Management - Individual Assignment - 1)
Project Scope Management - Individual Assignment - 1. https://studentshare.org/management/1844582-project-scope-management-individual-assignment.
“Project Scope Management - Individual Assignment - 1”. https://studentshare.org/management/1844582-project-scope-management-individual-assignment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Scope Management - Bostons Big Dig

Project Management Methodology Role in Implementing Organizational Change

Project management Methodology Role in Implementing Organizational Change Insert Name Insert Institution's Name Insert Date Introduction The dynamics in the current business environment have continued to complicate the manner in which business operations are conducted throughout the world.... Thompson (2002) argues that management entails a number of interrelated activities and knowledge areas which if well coordinated leads to attainment of company goals.... Sims (2002) asserts that, on the whole, a winning project management must entail good planning, efficient resourcing, realistic expected outcomes and strong managerial prerogative....
9 Pages (2250 words) Essay

Project Management for General Motors

It is supposed that small offices will give 35% of the revenue, medium offices will give 40%, and big offices will give 25% of the revenue from the office rooms leasing.... Offices for big companies will be situated at the higher floors and have more than 7 rooms per office.... High-Level scope The project is planned to build 40-floors office complex with various office rooms and 10-floors underground parking.... The chosen project is developing a huge office complex with a full floor dedicated to corporate entertainment....
6 Pages (1500 words) Essay

Management of Change

The company earned big profits in depression years and recently the earned profits were $ 22 million in 2006, $ 32 Million in 2007 and $ 45 Million in 2008.... Change management is a critical component of organizational improvement and entails all processes, tools and techniques that are used in entrenching change in the organization (Cohen 2005).... oward and Johnston Pty Ltd (H&J) has been one of the largest civil management of change management of change- Howard and Johnston Pty Ltd Introduction Change management is a critical component of organizational improvement and entails all processes, tools and techniques that are used in entrenching change in the organization (Cohen 2005)....
1 Pages (250 words) Assignment

Managing Projects

project scope primarily refers to the work that should be done to provide a product with the definite structures and functions.... he management Principle institutes how it should be done and by whom.... The characteristics of this management control incorporate the project's expectations, its validation, and an orientation baseline in each of the fundamental variables as a foundation for progress quantity, comparison, and a sequencing adjustment....
11 Pages (2750 words) Assignment

Business Information System - Competitive Advantage over Competitors

This means a good accounting system must be able to provide timely and accurate data to guide management in making its important decisions that will determine whether the firm will be profitable or not or if it will survive for another year despite all the competitive odds against it....
8 Pages (2000 words) Assignment

Risk Workshop and Risk Register Plan Component

he risk management plan contains all the possible risks associated with big data theft.... These categories are clearly outlined in four main categories of Technical, management, external, and commercial.... These risks had to relate to the commercial, technical, and management sections of the Risk management plan.... Project management deploys scientific skills to analyze, identify, and access risk factors and opportunities that accompany a specific project....
6 Pages (1500 words) Essay

Project Management of the Beijing National Stadium

The paper 'Project management of the Beijing National Stadium' is a thoughtful example of an engineering and construction business plan.... The paper 'Project management of the Beijing National Stadium' is a thoughtful example of an engineering and construction business plan.... Project management involves various challenges, but working with a committed team makes it easier in accomplishing the objectives.... The project bid got Arup at the top of the list....
12 Pages (3000 words)

Information Required for Developing an Introductory Supplier Cost

Part 1The big dig projectThe big dig project is considered one of the most complex highway projects to be undertaken in the United States of America.... This was mainly due to the challenges that Part 1The big dig projectThe big dig project is considered one of the most complex highway projects to be undertaken in the United States of America.... Project management skills greatly benefit the employees and as such, the information about their level of understanding of project management is required....
8 Pages (2000 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us