StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Managing Change assessed course work: Project Feasibility Study 2014 - Coursework Example

Cite this document
Summary
In the modern world, management has taken a turn as it has adopted a holistic management approach. The project management and project management…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.1% of users find it useful
Managing Change assessed course work: Project Feasibility Study 2014
Read Text Preview

Extract of sample "Managing Change assessed course work: Project Feasibility Study 2014"

Download file to see previous pages

The feasibility study comprises of the market analysis, financial analysis, Technical analysis, economic analysis, ecological analysis and legal and administrative analysis. Andre Rousseau Phd (Environmental Studies), a naturalist and resident of the Northwest Territories discovered multiple mineral deposits beginning in the mid 1990’s. Rousseau incorporated Kettle Mountain Mining Inc (KMM) in 1999 with the intent of developing the mineral deposits and pledged that his company will add to the quality of life within the surrounding community.

The company remains private. Rousseau says “Going public would mean bowing to the almighty earnings per share and having to answer to the analysts instead of the citizens.” He did, however, recognize that there may be short run tradeoffs between economic benefits and social fabric of the community and a zero environmental footprint. In 2002, the company discovered a promising seam just outside the town of Carlsbad (Canada). Preliminary sampling indicated high concentrations of several valuable minerals, including G2, S2 and P1.

In 2003, the mine shaft was constructed along with a processing plant and administrative offices. The development of the mine lead to the economic revival of the town of Carlsbad. During 2003, twenty new homes, a sixty-unit trailer park and several new businesses were established. Mining and processing operations began in January 2004 and have continued without interruption since that date. KMM currently operates at 80% capacity due to transportation restrictions (see below). During 2011, the company removed 310,000 tonnes of ore from the mine.

The future life of the mine is expected to be twenty-five years. Industry analysts suggest that companies of this nature should earn a 12% real pre-tax profit on sales (after negating the effects of inflation). Rousseau figures the

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Managing Change assessed course work: Project Feasibility Study 2014 Coursework”, n.d.)
Managing Change assessed course work: Project Feasibility Study 2014 Coursework. Retrieved from https://studentshare.org/management/1638359-managing-change-assessed-course-work-project-feasibility-study-2014
(Managing Change Assessed Course Work: Project Feasibility Study 2014 Coursework)
Managing Change Assessed Course Work: Project Feasibility Study 2014 Coursework. https://studentshare.org/management/1638359-managing-change-assessed-course-work-project-feasibility-study-2014.
“Managing Change Assessed Course Work: Project Feasibility Study 2014 Coursework”, n.d. https://studentshare.org/management/1638359-managing-change-assessed-course-work-project-feasibility-study-2014.
  • Cited: 0 times

CHECK THESE SAMPLES OF Managing Change assessed course work: Project Feasibility Study 2014

Baseline Project Plan

This project provides definition to the New Equipment Check – Out System for GB Manufacturing, including the goals and objectives, specifications and limitations of the project.... hellip; The project Staff includes a project sponsor, a Steering Committee, a project Manager and project Participants.... The project Sponsor is the one who is the ultimate decision-maker of the project....
9 Pages (2250 words) Case Study

Managing Expansion Change in Business in Mortloch Hotel

This case study "Managing Expansion Change in Business in Mortloch Hotel" points out that PDR Hotel & Resorts plans to buy Mortloch Hotel, which is currently underperforming.... Additionally, the management has to work towards common objectives in order to improve service delivery and staff morale....
10 Pages (2500 words) Case Study

Challenges of Work Placement Feasibility

This document reports the critical analysis, of a work placement feasibility.... hellip; Having identified the obstacles, a tender was floated, inviting consultants who were interested in taking up the project of a 5-star hotel for execution.... The project should be of a 5-star hotel category.... The purpose and objective of the project is “Customer satisfaction”.... Hence, all activities involved with the project had to be looked at from a “Customer” perspective....
5 Pages (1250 words) Case Study

Change Management Effected in a Local Insurance Company

change management refers to the thoughtful planning, sensitive implementation, as well as the consultation and involvement of all the parties responsible for affecting changes in an organization.... change management entails offering and implementing technologies to handle changes… Forcing changes on people normally cause problems since it is natural for people to resist anything imposed on them.... Therefore, change management should be This is because these tenets make managing personal change probable....
8 Pages (2000 words) Case Study

Managing Innovation and Change of Hartridge Grange School

The author also presents a design a change program and John P Kotter's 'eight steps to successful change.... The author describes key qualities of Hartridge Grange, the current situation of the school, outcomes of the troubles faced & challenges, market analysis, and issues resolution....
11 Pages (2750 words) Case Study

The Hoover Dam Project

This case study "The Hoover Dam Project" discusses the role of the project manager(s) and the assessment if they were successful in the role.... The case study analyses an assessment of whether the project was regarded as a success when it was completed.... hellip; Cadbury illuminates that the Hoover Dam project was one of the seven wonders of the industrial age It was one of the greatest projects in the US during the great depression period between 1928 the initiation stage to the completion stage in 1935 though the construction began in 1931....
9 Pages (2250 words) Case Study

Environmental Impact Assessment for the Forth Replacement Crossing Project

These include the integration of topics on biodiversity, human health, land, disasters and accidents, efficiency in the utilization of natural resources and, climate change (Fothergill, 2014).... Other amendments entail the monitory process of the projects proposed, the definition of EIA and cumulative effects and, specifications of expertise requirements in designing the EIA report authorizing the development (Fothergill, 2014).... … The paper "Environmental Impact Assessment For The Forth Replacement Crossing Project" is a great example of a case study on environmental studies....
8 Pages (2000 words) Case Study

Project Risk and Change Management of the Trillo Apparel Company

Consequently, the proposed project that entails expanding the warehouse and production unit in the East is essentially a viable move.... hellip; The project will be implemented in a batch approach, rather than in phases.... The resources and materials required are secured and as such, the project implementation is in progress (Hill, 2009).... The construction of the warehouse is already in effect planned and the contractors undertaking the work are in place....
8 Pages (2000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us