StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Asses project risks - Assignment Example

Cite this document
Summary
The Jefferson irrigation project is one that must be accomplished within duration of time and which neither require that the cost remains as low as possible to ensure that the budget is nor exceeded. With a budget of $9452.43, Akina landscaping has to ensure that they minimize…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92% of users find it useful
Asses project risks
Read Text Preview

Extract of sample "Asses project risks"

Project Risk The Jefferson irrigation project is one that must be accomplished within duration of time and which neither require that the cost remains as low as possible to ensure that the budget is nor exceeded. With a budget of $9452.43, Akina landscaping has to ensure that they minimize on some of the risks that has the potential of delaying the project and adversely increasing the project cost. The first event that poses a great risk to the project is the change in the weather conditions. In the event that the area experiences heavy rainfall, the project risks getting delayed and destroy the construction that shall have been made.

This would thus increase the cost of repairing the damages and increasing the labor cost. Furthermore, this risk is high since it is beyond the control of the project management. The second event that poses risk to the irrigation project is the delay in the delivery of the materials that will be necessary in constructing the water routes (Larson & Gray, 2011). The delay in such delivery risk bringing the project to a halt hence leading to non-achievement of the projects objective. This risk can be minimized by ensuring that reliable suppliers are contracted to deliver the materials and communications made in time.

The third event that poses the risk to the project is the destruction of the plants when being planted or pruned. In such cases, the cost of purchasing additional plants or that of paying for the additional labor cost will negatively affect the project implementation. It also has the risk of delaying the completion of the project. Furthermore, destruction of the plants may lead to poor delivery of substitute plants, which are not of the same quality. The fourth event that poses risk to the irrigation project is labor disputes.

In such a project, the number of persons employed is many and range from those with specialization and casual laborers (Linkov & Ramadan, 2004). Any delay in the payment of their remuneration or low rewards could make them down their tools and delay the timely completion of the project. Moreover, in the event that the equipments used in the building of the irrigation scheme is destroyed, the project could take longer periods. The cost of repairing the equipments will also increase the cost of the project hence resulting into total failure.

Breakdown in the equipments could also arise when the actual digging is taking place and substandardised equipments have the potential of derailing the quality of the future construction or buildings. Spraying of the plants by chemicals also poses a threat of destroying some of the plants. It has been proved that chemicals may affect the plants and in some cases could cause other diseases to which will thereafter translate into increased cost of treatment of the plants. At the same time, this could make the plants qualities deteriorate apart from posing a potential threat on the lives of the workers.

Potential delays in the delivery of the pipes and other necessary materials could also cause a problem to the irrigation project. Since the pipes to be used are plastic made, there will be unavoidable breakages which will result into cost increment and reduce the overall value of the project. This may later extend to derail the quality of the project. Besides, the coordination of the project could also cause a problem in case there were delays or communication breakdown (Larson & Gray, 2011).

Other events that would lead to risk include the problems at installation stage, floods, destruction during the cleaning times and addition of the bark. The project managers of the Jefferson project therefore need to mitigate all the events that are likely to increase losses and adversely affect the quality of the project. All projects irrespective of their nature are faced by different risks. What matters however is how well the management takes measures that reduce their impacts. ReferenceLarson, E. W., & Gray, C. F. (2011).

Project management: the managerial process (5th ed.). New York: McGraw-Hill Irwin.Linkov, I., & Ramadan, A. (2004). Comparative risk assessment and environmental decision making. Dordrecht: Kluwer Academic Publishers.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Asses project risks Assignment Example | Topics and Well Written Essays - 500 words”, n.d.)
Asses project risks Assignment Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/management/1601086-asses-project-risks
(Asses Project Risks Assignment Example | Topics and Well Written Essays - 500 Words)
Asses Project Risks Assignment Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/management/1601086-asses-project-risks.
“Asses Project Risks Assignment Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/management/1601086-asses-project-risks.
  • Cited: 0 times

CHECK THESE SAMPLES OF Asses project risks

Risk Management

Infrastructure project risks Risk management Name: Institution: Date: Infrastructure project risks Construction projects are undertaken within sophisticated and dynamic environments and as a result they are often faced with elevated levels of uncertainty.... hellip; Infrastructural construction industry has underwent significant changes over the last few years with much focus being directed towards limitation of risks and challenges encountered during the process....
10 Pages (2500 words) Essay

The Project and the Risks that Might Affect Them

The paper describes one of the major aspects of project financing is understanding the reason for project financing, preparing the financial plan, determining the risks of the project, designing the project, and sourcing the required finance for the completion of the project.... In terms of bankability, the project financier will assess the expected cash flows and duration of the project; assess the risks associated with the project to determine whether the project is a credible choice for financing....
16 Pages (4000 words) Research Paper

Project risk management

project RISK MANAGEMENT Name Tutor Institution Course Date Part 1 project risk management is an essential aspect of project execution.... project threat can be described as an unexpected event or action that can impact the project's development, result or effect in a constructive or unconstructive way (Barkley, 2004, Pg.... There are various approaches used to tackle project risk management.... The importance is the strategy shaping phase of the venture lifecycle, precisely shaping the expansion of project execution and delivery approach plans....
10 Pages (2500 words) Essay

Capital Asset Pricing Model

Part of their model was to incorporate risk-adjusted discount rates and Monte Carlo simulation to evaluate project risks.... Basically, asset pricing is both benefits and risks.... nbsp; In most business, risks are often associated with each venture that entities partake.... In this process, optimal selection of investment is ascertained considering vital risks that include the probability of success of minimum and maximum revenues with the other aspects previously mentioned....
10 Pages (2500 words) Research Paper

Fundamentals of Corporate Finance

These three combinations are assessed according to their returns and risks, measuring the returns by getting the proportion and weighted return, and then getting the risk by getting the portfolio standard deviation.... High returns definitely accompany higher risks, but as it is stated in the question that the investors are high-risk takers, they can opt for the combination which maximizes the value of their investment, which is the combination of projects b and d....
9 Pages (2250 words) Assignment

Risk in Financial Context

It is worth noting that risks and In this context, the greater the risk, the more that alternative is unfavourable while if the risk is lower the alternative is the best for an individual to take a course of action into it (ALEXANDER, 2008).... In my work I will examine the risks in relation to financial assets.... Due to different understanding of term risk many scholars are of other takes that measure risks especially those that emphasizes on negative results or that are below some known referent points....
7 Pages (1750 words) Essay

Principles of Finance and Capital Asset Pricing Model

Beta measures individual asset risks and represents non diversifiable risk part of an asset.... Individual asset standard deviation squared measures risks associated with deviations/fluctuation of asset rate of return over time.... A security market line shows the relationship between CAPM results and various risks in the capital market....
8 Pages (2000 words) Term Paper

The Health and Safety System at Leeds Metropolitan University

Such measures however fail to take into consideration the risks faced by organizations and how these risks are handled but rather pay much attention to hazards encountered.... "The Health and Safety System at Leeds Metropolitan University" paper states that a health and safety management system brings together multiple aspects including management organizational arrangements, such as planning and review, consultative arrangements....
14 Pages (3500 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us