StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

London Undergrounds Customer Role for Equipment - Essay Example

Cite this document
Summary
The paper " London Underground’s Customer Role for Equipment" highlights London Underground as a widely accepted mode of transportation for the people offering comfort and providing security apart from transporting them to a wide coverage area in one single journey…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.7% of users find it useful
London Undergrounds Customer Role for Equipment
Read Text Preview

Extract of sample "London Undergrounds Customer Role for Equipment"

London Underground comprises a large network of the world’s underground railway opened in 1863. The tube services a record 270 stations which is the largest underground network in the world and also cover around 402 kilometers. Acting as a pioneer in its design, the design of LU has been adopted by several underground networks across the world. Almost 86% of the passenger fares are covered by the tube which makes it stand out as the main traffic tool in the nation (Urbaneye, 2002, p.7).

London underground’s customer role for equipment
London underground having a relatively old infrastructure should consider prospects of up-gradation of its equipment mainly required for comfort, safety, and security of their passengers. This raises the role of London underground as a customer for its equipment and subsequent consideration of its equipment reports. The major equipment of London underground are the CCTV camera, ticket machines, support systems for ventilation, emergency alarms, availability of reservations or wheelchairs for senior citizens, handicapped, etc (Kelly, 1999, p.4). As a customer to its equipment report, London underground needs to at its suppliers, competition for the contract of supply of equipment, whether the equipment is customized for the tube and the payment amount for equipment installed. Major suppliers of CCTV for installation in London Underground include market leaders like Panasonic, Sony, Eneo, British Security Industry Association, etc. The suppliers need to bid for the contract on London Underground’s decision of installation of new CCTV cameras or up-gradation of the existing system (Source Security, 2013, p.1). The supplier offering the best competitive price and quality of information is awarded the contract.

For example, Sony has installed around 5000 CCTV cameras by 1996. In 2002, a 500 camera system has been installed with a three-room capacity for controlling activity in order to enable LU with monitoring capacity of health and safety of passengers, detection and prevention of crime, and closed-circuit surveillance. The CCTV surveillance system used in London underground as installed and supplied by Sony are the one’s used for general business surveillance (Glanz and Nacerodien, 1996, P.1). Thus the CCTV system has not been much effective in large underground stations in tracking activities like pick-pocketing, bag-snapping, etc. However, CCTV has been able to detect crime in small underground stations.

The effect of the CCTV old system wears out with time as offenders learn about their position of tracking. Looking at upgrading the infrastructure, London underground announced a one-billion pound sterling program for station regeneration of which 40 billion pound sterling was spent on CCTV installation in 1997-98. Apart from CCTV, the London underground also installs ticket machines which passengers can use through top-up Oyster cards. The major supplier of all ticketing machines in London Underground is Cubic Transportations System Inc. The emergency alarms are supplied by manufacturers like Vesda and Wagner. In order to upgrade its old transportation system in the face of increasing passengers, London Underground has upgraded its WaterLoo and City line in 2006 with five trains instead of existing four, Victoria line now includes a fleet of 47 higher capacity with better ventilation capacity than before (Fire Systems Ltd, 2013, p.1). The Green Park station has included three new lifts and a vital gateway to the west end. Thus, by improving the main traffic tool or the train and equipment, London Underground would be able to provide its passengers with better safety, more transportation capacity, and comfort (Tfl, 2013, p.1).

Comparison between Hong Kong MTR and LU
In terms of the train and its underground equipment, London Underground is the oldest underground network in the world with varied designs in infrastructure. Overall, the system is the largest best in the world. However, Hong Kong MTR equipment is much newer and more reliable. Hong Kong MTR network is spread over a smaller area and carries 2.4 million passengers per day. It is a much better-utilized network as compared to the London Underground. The tube on the other hand carries 3 million passengers per day and is spread over 402 km. Technologically, Hong Kong MTR is much more advanced as London Underground does not have mobile signals, has the old infrastructure, and less reliable in comparison.

Conclusion
Although London Underground is the oldest network in the world, yet it is still the world’s largest and overall the best underground tube. As compared to other networks, it covers the largest number of stations and is spread over a huge geographical area of 402 km encompassing greater London and its surroundings. The tube is very fast and can take a large number of people. The London underground has looked at updating its old infrastructure by increasing the number of trains during peak hours, increased capacity of transportation, upgrading the ventilation systems, and plans for a centrally controlled air-conditioned mode of operation. The installation of additional CCTV cameras has enabled the authority to increase its surveillance on crime prevention, monitoring health, and other activities of passengers. These will benefit the large passenger base of London Underground. The facility to step-free from the street to the platform is another advantage in favor of the London Underground.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“London underground as a customer role for equipment report Essay”, n.d.)
London underground as a customer role for equipment report Essay. Retrieved from https://studentshare.org/management/1469547-london-underground-as-a-customer-role-for
(London Underground As a Customer Role for Equipment Report Essay)
London Underground As a Customer Role for Equipment Report Essay. https://studentshare.org/management/1469547-london-underground-as-a-customer-role-for.
“London Underground As a Customer Role for Equipment Report Essay”, n.d. https://studentshare.org/management/1469547-london-underground-as-a-customer-role-for.
  • Cited: 0 times

CHECK THESE SAMPLES OF London Undergrounds Customer Role for Equipment

Olympic Games in London 2012

In this paper, the author demonstrates the objectives of the london Olympics, the influence of the economy and the rest of the political standing of England.... For the entire purpose london Transport Plan ( 2nd edition) was released in 2009 which took into consideration factors like passengers routes, visitors stay, businesses and motels handling and all other factors that were necessary to be taken into account (LOCOG, 2010)....
7 Pages (1750 words) Term Paper

Retail Marketing

The retail marketing sector plays a much wider significant role here.... Retail marketing businesses that operate at each spoke However, it is the customer base which determines pattern and content of the network.... addington, as a pivotal train interchange, in london in particular and the United Kingdom in general, provides one of the most important focal points for the analysis of the retail marketing business in this transport hub.... Paddington is part of the City of Westminster, in Central london, England....
9 Pages (2250 words) Essay

London Underground Limited Management Project

The role of the 6-kilometer stretch was to avail a small continuous railway service meant to connect to the main overground station, which connected to the London City.... he railway LUL experiences delays and overcrowding as some of problems to customer's comfort.... This project aims at designing a management system with the capacity of controlling waste resulting from london Underground Limited activities.... The london railway network is the oldest underground railway system on earth....
20 Pages (5000 words) Assignment

Report on Beverly Hills Cab Company Venture Plan in Singapore

Beverly Hills Cabs provide premier taxi services to clients ranging from airport pick-up and drop-off, errands, medical visits, hotel.... ... ... The company has professional drivers and reasonable charges for the best quality service provision for the clients.... Beverly Hills Cab Company understands that all clients deserve top-notch cab services As Beverly Hills Cab Company has continued to grow from strength to strength, plans to enter a new market are underway....
7 Pages (1750 words) Essay

Sustainability, Operational and Financial Issues

Some of the people who will be key in the success of the business include the suppliers, an interior designer, equipment supplier and an accountant.... The UK fruit juice market is an organized and a well-developed market.... Over the last couple of years, the sector has experienced moderate growth....
15 Pages (3750 words) Coursework

Project Management Office for the HPCL Project

HPCL is london Stock Exchange listed, FTSE 100 Metals Company and amongst the top mining companies based on revenues.... This paper "Project Management Office for the HPCL Project" focuses on the fact that HPCL is a renowned mining company and one of the biggest non-ferrous metal producers....
20 Pages (5000 words) Research Paper

Security in the Kings Cross Underground

The Bowtie Analysis below showcases the possible risks that can be realized in the london King's Cross.... This paper "Security in the Kings Cross Underground" tells that King's Cross underground is a tunnel with five meeting lines that include metropolitan and circle.... Risk assessment in a building is a process of identifying and evaluating the risks r related to the hazard in a building....
17 Pages (4250 words) Case Study

Advantages and Disadvantages of Remote Controlled Mining

The pressure has not only on mining operators but also on suppliers of machines and equipment, who have been out to fit into the competitiveness of producing what their customers needs; machines that are productive and cost-efficient (Kral 2010, p.... n example is Sandwick Mining and Construction Company, a worldwide equipment supplier that has been at the forefront in making efforts to supply cost-effective equipment, which are technologically advanced (Kral 2005, p....
8 Pages (2000 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us