StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Critique of an Environmental Statement, and Recommendations - Case Study Example

Summary
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95.6% of users find it useful

Extract of sample "Critique of an Environmental Statement, and Recommendations"

University> Critique of An Environmental Statement, and recommendations. by Contents page number 1. Introduction 3 1. Introduction Environmental impact assessment is used to evaluate the environmental consequences that can be associated with ta specific project. Although it used under many legal names in different countries, EIA is used to predict problems, find ways to avoid them, enhance positive effects and manage environmental impacts of the actions of human beings on the natural habitat or ecosystem. Baseline information must be gathered, prior to the start of a development so that the cumulative impacts can be better predicted EIA must be done in the planning stages of the projects before the financial commitment to enable necessary changes in the project. However, EIAs fall short of their intended purpose due to some factors such as the developers do not disclose all of the possible activities, so correct predictions cannot be made (Wood, 2003). The outcomes of Human activities are unpredictable in cases, and sometimes they may either produce a lesser or greater impact on the environment than indicated. It is more problematic when the EIAs do not satisfy the intended purpose due to tractable issues rather than due to unforeseen circumstances. EIA started in in 1960s due to increased want to create environment awareness. It aimed at bringing an objective decision making. In USA it started in 1969 as a result of National Environmental policy Act. After the EU posted a directive in the late 1980’s that when the UK adopted it. 2. Case Study Olkiluoto nuclear power plant is located in Olkiluoto Island on the western coast of Finland, approximately 14 kilometres from highway 8 and 25 kilometres from Rauma. The project involves building a new nuclear unit that has a boiling water reactor. Due to the directive by European Communities (85/337/EEC) and EIA act an environmental impact assessment is necessary (Ridl, 2012). Several years most of the development organizations both multilateral and bilateral have been accused by the environmental activist for not looking at the environmental damages that are caused by their projects. Some of the projects that are being watched include and not limited to logging, shrimp ponds and irrigation. However regardless of these projects described not to be fit as the impact on the environment is high they have been funded and also approved (Canter, 1996). 3. Critiques of Environmental Statement During the development period of the venture, extensive physical disturbance will influence the natural environment by its general alteration of the physical and biochemical conditions (international Association for Impact Assessment, 1999). Clearly the probability of such an occasion will be connected to the blend of exercises carried out. Some of the critiques of the EIA are: Information consistency The data displayed in the EIA is not by any means predictable with that introduced somewhere else in connection with the undertaking. In the environment clearance report the boiling water reactor is explained to produce approximately 150 bar pressure, in the detailed report it is 175 bar and in the website, it suggests that the reactor has 200 bars. With this changes would have difference environment impact (Siren, 2015) Monetary evaluation Given the focal part of advantage cost examination in task readiness and evaluation, ecological qualities must be measured in money-related terms if they are to be made commensurable with promoted merchandise and administrations. The endeavour to put money related conditions on environment keeps running up against both specialized and philosophical difficulties. The issues of money related valuation won't be overcome effectively (Robinson, 1996). The troubles incorporate restrictions on factual strategies, numerous sorts of inclination in overview routines and unexpected assessments, and the contention that to invent money related quality where none exists is to commit an error in rationale (World Bank, 2012). Potential ecological impact According to Shepherd, (2012) chapter 3 baseline environmental status presented in the EIA is among the vital assessment. The EIA do not consider the impact on the ecological systems when the unit is built in the intertidal area. This is because south of the area there is a mangrove swampland which protects against storms. In most of the companies, there are no professionals who analyse the projects and most of the companies do not link the environmental specialist with the project design and evaluation. By and large, in this way, the low quality of environmental data extensively undermines the EIA (Winbourne, 2002). Effect of new EIA regulations The yield of the evaluation will be displayed as an 'EIA Report', as opposed to the past 'Ecological Statement’. There is additionally a prerequisite to utilizing 'certify and in fact skilful specialists' to deliver and confirm the EIA Report. A definition is not given and it will in this way fall on the Member States to make their particular inferences. The Directive places the leader under an obligation to consider whether the EIA Report is a la mode at the purpose of choice, and gives forces to require additional data. This might trigger more demands for designers to supply further and overhauled data. There is likewise another prerequisite for them to agree to contain a "contemplated conclusion by the equipped power on the noteworthy impacts of the undertaking on the earth". With everything taken into account, EIA Reports are going to get greater as opposed to littler(Moura, 2015). The new EIA is gone for guaranteeing an abnormal state of earth protection and human well-being through the foundation of normal least prerequisites for the appraisal of the impacts of specific tasks on nature amid the consenting procedure. Unmistakably, the alterations fortify existing enactment trying to accomplish this point, and developers and skilled powers should be intensely mindful of future necessities in a region that pull in an abnormal state of the lawful test (Chi, 2015. The order embeds clearer necessities for the appraisal of the effect of tasks in various zones including biodiversity, environmental change, scene and calamity dangers (which would incorporate, for instance, flooding). While these will, for the most part, be secured, this is liable to require an expanded accentuation in these territories. Extra prerequisites are consolidated on points with which engineers have gotten comfortable, including appraisal of baselines and aggregate impacts. Combined impacts are characterized as those emerging from the improvement with other existing and endorsed advancements, making note of existing natural issues and asset use (Ylönen, 2015). Conclusion EIA suggestions are frequently undermined basically on the premise of provocative tone and dialect. Another issue is that EIA reporting arrangements can be voluminous to the point that nobody has room schedule-wise or longing to peruse them. Maybe, in particular, different EIAs prescribe alleviate measures which are moderate for the salary of a specific district or farfetched as far as working and support costs. A grievous however visit reaction to dispose of or disregard the whole examination. Reference List Ridl, J. (2012). “Ezemvelo KZN Wildlife on Its Knees.” The Nation.Available fromhttp://www.witness.co.za/index.php?showcontent&global%5B_id%5 =88784 Robinson, J. R., Ross, A., Walton, W. and Rothnie, J. (1996). “Public Access to Environmental Information: A Means to What End?” Journal of Environmental Law (8)1:19-42. Shepherd, J. (2012). “One Way or Another, EIA Process Must Change.” The Nation, 26 November. Available from http://www.nationmultimedia.com/opinion/One-way-or-another-EIA process-must-change-30195006.html The World Bank. (2012). Guidance Notes on Tools for Pollution Management. In Getting to Green: A Sourcebook of Pollution Management Policy Tools for Growth and Competitiveness. Available from http://siteresources.worldbank.org/ENVIRONMENT/Resources/Getting_tGreen_web.pdf Winbourne, S. (2002). “Corruption and the Environment.” United States Agency for International Development. Available from http://pdf.usaid.gov/pdf_docs/PNACT876.pdf Wood, C. (2003). “Environmental Impact Assessment in Developing Countries: An Overview.” Available from http://www.sed.man.ac.uk/research/iarc/ediais/pdf/Wood.pdf International Association for Impact Assessment, “Principles of Environmental Impact Assessment Best Practise,” IAIA, Fargo, North Dakota, 1999, 4 p. Canter, L.W., Canter, L.W., Canter, L.W. and Canter, L.W., 1996. Environmental impact assessment. Garrard, G.E., Bekessy, S.A., McCarthy, M.A. and Wintle, B.A., 2015. Incorporating detectability of threatened species into environmental impact assessment. Conservation Biology, 29(1), pp.216-225. Moura, P., Nuttall, C., Harrison, B., Jehle, C. and de Almeida, A., 2015. Energy savings potential of uninterruptible power supplies in European Union. Energy Efficiency, pp.1-21. Ylönen, Marja, Tapio Litmanen, Matti Kojo, and Pirita Lindell. "The (de) politicisation of nuclear power: The Finnish discussion after Fukushima." Public Understanding of Science (2015): 0963662515613678. Chi, C.S., Ruuska, I. and Xu, J., 2015. Environmental impact assessment of infrastructure projects: a governance perspective. Journal of Environmental Planning and Management, (ahead-of-print), pp.1-21. Siren, T., M. Hakala, J. Valli, P. Kantia, J. A. Hudson, and E. Johansson. "In situ strength and failure mechanisms of migmatitic gneiss and pegmatitic granite at the nuclear waste disposal site in Olkiluoto, Western Finland." International Journal of Rock Mechanics and Mining Sciences 79 (2015): 135-148. Read More
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us