"An Environmental Management Project" paper identifies a specific industry and outlines what must be done to be in compliance with environmental laws within that industry, and develops environmental control methods, procedures, and programs to handle environmental hazards presented by your industry. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER99% of users find it useful

Extract of sample "An Environmental Management Project"

1) Identify a specific industry and outline what must be done to be in compliance with environmental laws within that industry. It is a requirement for hazardous material handling facility to have a detailed plan on its operations which will include preclusive, closure and post-closure operations. This is a requirement by state in order for a permit of operation to be issued. In general the plans will give a description of waste characteristics handled, equipment used and the operation procedure of the same, personnel at the facility how emergencies are handled and other related issues. The operations plans are expected to include procedures of access, identification process of waste, entry procedure, handling and control of waste, security, monitoring, and safety, training in safety issues and management and personnel. The Resource Conservation and Recovery Act (RCRA) recognize the need of a hazardous waste facility to include contingency plan that will work towards reduction of unanticipated damage emanating from treatment, storage or disposal of the disposal waste. The contingency plan and emergency procedures give the details of plan, responsibilities for the personnel and procedures for emergencies. The plan puts emphasis on the plan design specifics that will serve to reduce hazards that are posed to human health or environment due to fires, explosions or any form of unplanned release of hazardous components to soil, air or subsurface are put to minimum. There is need for the design to have provisions that will make it possible to have swift and effective emergency response procedures in addition of having features that will aid in avoiding occurrence of emergency situations. Some of the features that are required include primary and secondary spill structures and methods There should be structures that will help in containment and suppressing fire The ideal location of the facility need to be away from active faults, away from fire ignition source and flood zones or low-lying coastal areas. It is recommended that adequate ground-water monitoring be incorporated in addition to having communication and alarm system in place. While it is not a requirement to have specific design features by the contingency plan, it should be noted that an acceptable plan has basis in intrinsic safety features of the particular facilities. There is need for extra contingency planning and the development of emergency repair procedure in the case of surface impoundments. It is a requirement of for owners/operators of hazardous waste management facility to train the workers of the facility. The rule specifies that the personnel need to successfully complete on-the-job training or classroom training session which will fully equip them with skills required in their duties. The person to direct the training must have training in hazardous waste management procedures and should include instructions that educate the works on procedures of hazardous waste management which should be inline with the area they are dealing with. The program design should be such that there should be effective response to emergencies by the personnel through familiarization of the emergency procedures, emergency equipment and emergency system. The specific requirement may include How to respond to fires and explosions How to respond incase there is an incident of ground-water contamination Shutting down of operations Knowledge of important parameters in automatic waste feed cutoff systems Procedures for inspection, using, repair and replacement facility emergency and monitoring equipments The training received by the workers must have been completed in less than six months from the date one is being employed in a waste management facility or the time of moving to a new position in the facility (California Storm water Quality Association, 2003).. the regulation also emphasize that the training received by the facility personnel need to have a correlation with the class of the job being done even though regulations does not give any criteria for training programmes that are acceptable. Some of the activities undertaken at the facilities need personnel to be trained under the Ocupational Safety and Health Act but personnel training requirement under RCRA interpretation goes beyond the design of protecting workers and there is extension into community protection area as well (California Storm water Quality Association, 2003).. Some of the states training is a mandatory requirement in hazardous waste regulatory program have training requirement that are stricter than those of RCRA. The federal training standards are, however, required as a minimum in all the states. 2) Develop environmental control methods, procedures, and programs to handle environmental hazards presented by your industry. Discuss the issues associated with working with governmental officials and how those might be addressed. When designing a hazardous waste land disposal or land treatment facility it is important that the basic operations should be understood. The understanding play a vital role in developing of design plans that put into consideration the operations of the facility, equipment requirement, health and safety needs. The type of operations in a hazardous waste disposal depend on the type of waste disposal system. The process involved in a hazardous waste landfill include transfer of waste onto the active using equipment like forklift or front-end loader. The wastes need to be separated into cells in order to avoid the mixing of wastes that are incompatible(U.S. Office of Personnel Management, 1997). The waste is covered with soil for the purpose of preventing wind dispersal. There is need for the over soil to be graded as this will facilitate collection of direct precipitation in a sump. As a precaution that will ensure that there is minimal infiltration of rainfall in extremely wet conditions, there is use of tarps in covering the active area of the landfill (California Storm water Quality Association, 2003). During the seasons of very high rainfall the waste in placed in containers or simply stored until the end of the rainfall season. In landfill operations specialized equipment is required to be used in waste and cover material handling, decontamination process, and spill and fire control. Forklift and front-end loader are utilized in unloading and placement of solid waste and containers while dozens and self-loading scrapers are used in the process of spreading and compacting cover materials (Brown, 1983). Support functions are important and thus the need for road graders, vacuum trucks and water pick-ups. Other equipment required in the operations are spill control, fire control and decontamination equipments The operation of the facility involve various inspections when the liquid waste are impounded. There is need to monitor to ensure rise of liquids into the freeboard will not occur in addition to the leak detection system being monitored. The containment berms are inspected to ensure that no signs of leakage or erosion exist. Periodic sampling is also done on impounded wastes for some chemical parameters in addition to periodical inspection for floral and faunal activities like animal burrows which are likely to cause leaks through earthen dikes, embankments or levees. There is need to remove liquid waste in an impoundment and the methods involved include decantation, pumping and settling, chemical neutralization and solar drying. In the process of closing impoundment the equipment required include hydraulic pipeline or centrifugal pump used in removal of impounded liquids, vacuum truck which is used in the extraction process of hardened sediments which a dragline or front-end loaded is used in excavation of solidified sediments (Engineering Science,1982). There are three typical operations which are associated with land operation treatments. First there is application of liquid waste through spraying the waste on the land by use of sprinklers or through use of flood or furrow irrigation methods. The other operation involve the spread of semi liquid sludge on the land surface or the sludge is injected 4 to 8 inches below the surface of land. The last operation involves the application of low-moisture solids that has more 15% solids on the surface of the land and later owns the solids being incorporated in the soil (U.S. Office of Personnel Management, 1997). In operating the plant interaction with government officials is common where inspection of the facilities is required. The facility is required to keep copies of The Uniform Hazard Waste Manifest Form. This is a shipping document that reports on the contents of waste transfer, the company involved in transferring and the disposal company receiving it. The source of the waste, the transporter and the facility disposing the waste are all required to sign the document and retain a copy and the signed copy is expected to be kept at the waste handling facility for 3 years. It is also required that the facility maintain incident records (spills and other discharges) and other information that gives the details of the storm water quality and quantity discharged (U.S. Office of Personnel Management, 1997). It is also a requirement for the facility to maintain records of inspection and maintenance activities undertaken on the facility. Other requirement that the government officials may be interested in is a confirmation that the hazard facility Spill Prevention, Control, and Countermeasures (SPCC) 3) Discuss challenges associated with ensuring company personnel follow environmental regulations. There are several changes in ensuring that workers follow the environmental regulations. The fact that there are many workers who should be supervised is one a problem in ensuring that the workers follow the environmental regulations. The workers may avoid following the right procedures of in order to cut down on the time they are engaged in performing some activities. Lack of appropriate equipment and workers protective gear is also a reason which may be a cause for lack of observing the environment regulations at the facility. Some of the workers may lack full protective gear due to the fact that the protective gear may have been worn out faster that the expected time. This could be due to improper care of the protective gear and therefore the worker may choose to use the ineffective gear other than risk punishment by asking for early replacement. 4) Outline possible ethical and professional dilemmas of a responsible environmental professional. As a responsible environmental professional one exposed to several ethical and professional dilemmas. In a situation where the environmentalist need to base a decision on some studies which might note be proved to be true. In some of the situations several study might be used and there results may be contradictory. In some situations an environmentalist may be dealing with a situation where a certain population is exposed to some dangers due to exposure to an environmental hazard. The environmentalist will be forced with ethical dilemma when deciding on the right decision. While the environmental specialist will decide to order the evacuation of the population for their safety the same decision will expose the population to lose of their property and social interference on the population. In the recommending the setting up of waste disposal facilities the amount of money used on the facility is substantial. When operating in a society where people may not be having basic needs like food expenditure of huge some of money on sophisticated waste disposal system may be an ethical issue. The machinery used in the operation of the waste disposal system are expensive and may also be used in other projects that can benefit the public directly. The workers in facilities may be exposed to high danger even though they are working towards saving the general public from being exposed to danger. The professional is in an ethical dilemma whether it is right to put some part of the population to a higher risk in order to save the health of the general public. References Brown, K. W.(1983). Landfills in the Future. Public Works, 200 South Boward Street, Ridgewood, New Jersey 07451. California Stormwater Quality Association (2003) Hazardous Waste Management Engineering Science,(1982). Comparative Evaluation of Incinerators and Landfills. EngineeringScience, Inc., 150 N. Santa Anita Avenue, Arcadia, California . U.S. Office of Personnel Management (1997). Hazardous Waste Disposing Read More

While it is not a requirement to have specific design features by the contingency plan, it should be noted that an acceptable plan has basis in intrinsic safety features of the particular facilities. There is need for extra contingency planning and the development of emergency repair procedure in the case of surface impoundments. It is a requirement of for owners/operators of hazardous waste management facility to train the workers of the facility. The rule specifies that the personnel need to successfully complete on-the-job training or classroom training session which will fully equip them with skills required in their duties.

The person to direct the training must have training in hazardous waste management procedures and should include instructions that educate the works on procedures of hazardous waste management which should be inline with the area they are dealing with. The program design should be such that there should be effective response to emergencies by the personnel through familiarization of the emergency procedures, emergency equipment and emergency system. The specific requirement may include How to respond to fires and explosions How to respond incase there is an incident of ground-water contamination Shutting down of operations Knowledge of important parameters in automatic waste feed cutoff systems Procedures for inspection, using, repair and replacement facility emergency and monitoring equipments The training received by the workers must have been completed in less than six months from the date one is being employed in a waste management facility or the time of moving to a new position in the facility (California Storm water Quality Association, 2003).. the regulation also emphasize that the training received by the facility personnel need to have a correlation with the class of the job being done even though regulations does not give any criteria for training programmes that are acceptable.

Some of the activities undertaken at the facilities need personnel to be trained under the Ocupational Safety and Health Act but personnel training requirement under RCRA interpretation goes beyond the design of protecting workers and there is extension into community protection area as well (California Storm water Quality Association, 2003).. Some of the states training is a mandatory requirement in hazardous waste regulatory program have training requirement that are stricter than those of RCRA.

The federal training standards are, however, required as a minimum in all the states. 2) Develop environmental control methods, procedures, and programs to handle environmental hazards presented by your industry. Discuss the issues associated with working with governmental officials and how those might be addressed. When designing a hazardous waste land disposal or land treatment facility it is important that the basic operations should be understood. The understanding play a vital role in developing of design plans that put into consideration the operations of the facility, equipment requirement, health and safety needs.

The type of operations in a hazardous waste disposal depend on the type of waste disposal system. The process involved in a hazardous waste landfill include transfer of waste onto the active using equipment like forklift or front-end loader. The wastes need to be separated into cells in order to avoid the mixing of wastes that are incompatible(U.S. Office of Personnel Management, 1997). The waste is covered with soil for the purpose of preventing wind dispersal. There is need for the over soil to be graded as this will facilitate collection of direct precipitation in a sump.

As a precaution that will ensure that there is minimal infiltration of rainfall in extremely wet conditions, there is use of tarps in covering the active area of the landfill (California Storm water Quality Association, 2003). During the seasons of very high rainfall the waste in placed in containers or simply stored until the end of the rainfall season.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(An Environmental Management Project Assignment Example | Topics and Well Written Essays - 2000 words, n.d.)
An Environmental Management Project Assignment Example | Topics and Well Written Essays - 2000 words. https://studentshare.org/environmental-studies/2046594-an-environmental-management-project
(An Environmental Management Project Assignment Example | Topics and Well Written Essays - 2000 Words)
An Environmental Management Project Assignment Example | Topics and Well Written Essays - 2000 Words. https://studentshare.org/environmental-studies/2046594-an-environmental-management-project.
“An Environmental Management Project Assignment Example | Topics and Well Written Essays - 2000 Words”. https://studentshare.org/environmental-studies/2046594-an-environmental-management-project.
  • Cited: 0 times

CHECK THESE SAMPLES OF An Environmental Management Project

Corporate Environmental Management

This assignment "Corporate environmental management" shows that the collaborative project with McDonald's enabled EDF to produce a broader change in the behavior of markets.... EDF was an environmental group that possessed a combination of economic, scientific, and legal expertise enabling the company to address environmental concerns effectively.... Therefore when EDF successfully completed the project, it meant that there would be a market-wide effect on the knowledge base about solving environmental problems....
8 Pages (2000 words) Assignment

Management of Environmental Risks during the Project Life-Cycle

Name: Course: Date: Risks management analysis during Development stage of the Channel Tunnel project, Including management of environmental risks during the project life-cycle Development Phase The development phase is particularly a sensitive phase of the Channel Tunnel project, considering that safety must be enhanced from the very start of the project, lest the whole project becomes a risk.... hellip; The risk identified were the project ground risk, which are associated with the systemic failure of the organization and management of the project....
7 Pages (1750 words) Term Paper

Project Management in a Changing Environment

The paper “project Management in a Changing Environment” explains a project manager's multi-factorial work.... After analyzing environmental factors and focusing on the customers' needs, an algorithm of actions is planned, a budget is formed, during the project implementation adjustments are made.... Every project involves a set of interrelated activities, which has a definite beginning and end.... Since there are many aspects to be looked after for the attainment of project objective, the need for its proper management was seriously felt long back....
15 Pages (3750 words) Coursework

IPad - Project Management Environment Within the Organization

This paper "iPad - project Management Environment Within the Organization" focuses on the aim that has been well listed in the iPad project which clearly states that the ultimate objective of the project is to develop a new product and also specifies the product placement between iPhone and MacBook.... Not only does it specify the differentiation aspect of the product, but also goes on to specify what precise component of the product will need to be focused on during the project....
8 Pages (2000 words) Assignment

Management of Safety, Health & Environmental Project Risks: Behavioural Safety

"Management of Safety, Health and Environmental project Risks: Behavioural Safety" paper focuses on the best practices that can be employed in construction projects and how the employers and employees can influence the safety of the workplace.... nbsp;  There are a number of reasons as to why employees in a construction project may engage in risky behavior including reducing the number of comers to save time, reasons related to the ergonomics of the project, practices that are accepted in the project, risky behavior may be triggered by the actions of supervisors, misunderstanding among the workers and some workers may have an instinctive risk-taking behavior (Caruso, 2010)....
9 Pages (2250 words) Coursework

Safety and Environmental Management of Hospital Projects

This paper "Safety and environmental management of Hospital Projects" examines Safety and environmental management as an important aspect of every industry.... The paper deals with the details of the types of programs and systems that need to be implemented in order to maintain environmental compliance within the hospital, the management of environmental issues from the hospital industry, and how to deal with the government inspection on environmental compliance....
8 Pages (2000 words) Term Paper

Environmental Management Project: SALAMA Offshore Oil Drilling Company

"environmental management project: SALAMA Offshore Oil Drilling Company" paper examines how to reduce environmental impacts and achieve environmental compliance.... The company will have to address its environmental performance through the establishment of environmental management systems and policies.... These stakeholders include the surrounding environment and the entire marine ecosystem, the company workers, environmental management authorities, government, and all the companies that use the products of this company (OSPAR, 2002)....
9 Pages (2250 words) Case Study

Project Management in Controlled Environment

The paper "project Management in Controlled Environment" will begin with the statement that project management is an effective methodology on which the fate of project success and failure relies.... PRINCE2 is regarded as a comprehensive and successful project management methodology.... The project management methodology exercises nine knowledge areas, the five most important knowledge areas are discussed in the context of project management....
10 Pages (2500 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us