StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

System Design Assessment - Assignment Example

Summary
This assignment "System Design Assessment" creates an interface between the hardware and the software to simulate the actual operation of a physical lift. There will be software, hardware and the power system, which control the power at the input and output areas of the system…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95% of users find it useful

Extract of sample "System Design Assessment"

Student’s Name Systems Design Assessment Institution Name Tutor’s Name Date 1. Introduction This assessment requires a simple design of interface hardware for a lift, with a program to operate it. There are two categories of requirement in this case, being hardware and software requirements. The objective of this task is to create an interface between the hardware and the software to simulate the actual operation of a physical lift. There will be software, hardware and the power system, in which it will be necessary to control the power at the input and output areas of the system. 1.1. Software: We require the C compiler program found in Visual Studio 6.0, a CAD design program such as Visio, Microsoft office applications for documentation and Adobe acrobat application. 1.2. Hardware Among the hardware equipment, we require the existing Lift incomplete equipment and a logic design of programmable microcomputer equipment. Part of the hardware will also include electricity supply unit and the Light Emitter Diodes for the support of power supply in the microcomputer circuitry. 2. Hardware Design The hardware of the lift control unit is a complete system with the input and output sensors which typically form the lift system. The lift unit has a sensory area, a door, a winch, an analogue signal unit, relay circuit for closing and opening the doors or stopping and starting the lift movement as well as moving upside and down side of the lift. The hardware also has points of connection to the software and display systems for showing the response of the lift to power supply as well as the response of the lift to the instruction applied to its process. Just like in a typical lift system, the relay circuit controls when the door should open and close, move up and down and also begin and stop. One of the events important events involves the pressing of the floor button by the passenger, with the arrow indicating up and down directions. The input and output sensors have to undergo configuration to be able to respond to the subroutines of the program and operate the entire lift system moving from one floor to another. 2.1. Mechanism of the design function The subroutine initiates the actions of the digital to analogue converters (DAC) and the output and input ports to take relevant actions and return feedback through the output units. The user selects the required button, by simply selecting an option. The buttons then call the relevant subroutines for the selected action. The ADC locates the various positions of the lift determines whether it should move downwards or upwards. Below is the design of the lift system and the related components, how it links to the subroutine to respond to the instructions. 2.2. IC Types and values The Types of IC numbers and types for the lift system are listed below together with the voltage limits that they use. Series Type Number Voltage E E65788 12 to 68KVolt EC EC69976 Low voltage EAA EAA90 12 to 40KVolt EA Latching EA238 12 to 40KVolt E Multipole E6549 70 to 300KVolt E E5436 12 o 69 KVolt 3. Program 3.1. Description of the program The program is written in C language and has been split into different test segments for the lift. The program assumes that at one point the lift is not powered. It thus enables the user t power the lift and then get various options for the functionality of the lift. First, the program allows the user to decide on whether he or she is opening or closing the lift. Once the lift opening has been initiated, the lift display system shows a message “Door Opening” corresponding to the instruction. Once the door has open, the user can select the option of the intended floor number by just pressing the specific button from the menu, showing the floor number. The lift then issues a message showing the floor to which the user is moving to for example, if the user presses 7, the lift issues a message: “Lift Moving to Seventh Floor”. The lift then takes the user back to the main menu for selecting the appropriate menu option. Since the program is about the basic operation of a lift, this menu serves as an appropriate simulation for various subroutines that a lift system implements. It assumes the exact functioning mode of a lift and the call for various subroutines are implemented through the choices from the main menu of the program. The decision as to whether the delays or not is however not taken into consideration. However, at any instant, the user can decide on which function to select from the menu, prompting the lift system to decide on which subroutine to call. 3.2. Source Code #include using namespace std; int main () { // local variable declaration: short choice; int startend; cout Read More

CHECK THESE SAMPLES OF System Design Assessment

Assessments in Instructional Design

Given this, the appropriate use of assessment can be explained as the one that successfully combines the aforementioned dimensions.... In other words, appropriate use of assessment communicates achievement statuses of students, gives learners information for self-evaluation, helps place learners within selected educational programs, motivates students, helps find out whether an instructional program has been effective or not.... The use or misuse of assessment can be evaluated through identifying whether the learning goals have been achieved....
3 Pages (750 words) Essay

Structured System Analysis and Design Method

From the paper "Structured System Analysis and design Method " it is clear that each and every organization has varied technical requirements and also specific requirements for the system.... The logical design is converted to implementation on particular hardware and software platform is defined and specified to performance requirements.... The main objective is the specification of physical data and process design using the language and features of the identified physical environment and the standards for installation (Krallmann, 1994)....
6 Pages (1500 words) Essay

Information Systems Design and sociotechnical systems

They propose tool-supported procedures of requirement analysis for technical-social systems that adopt planning schemes for exploring the range of requirement alternatives in addition to a number of social criteria for their assessment.... It also gives a set of assessment criteria for evaluating and comparing the available options (Volha, Paolo, & Mylopoulos, 2012, p.... The white paper has reported on the assessment of the proposal through a number of case studies in addition to a series of scalable experiments. ...
3 Pages (750 words) Essay

Assessment of Health Management Information System in Tanzania

The paper "assessment of Health Management Information System in Tanzania" presents some of the major issues in the healthcare sector of Tanzania.... This report discusses some of the important aspects of the health management information system (HMIS) in Tanzania.... asically a health management information system (HMIS) is an information system that allows health care centers or hospitals to collect, record, and process data for policy development, public health planning, evaluation, and implementation of health programs....
7 Pages (1750 words) Report

Needs Assessment Design

The essay "Needs assessment Design" focuses on the critical analysis of the major issues in the needs assessment design.... Since the early 1970s it has been a requirement that any program proposal has a needs assessment that will outline systematically and objectively reasons for the programs....
9 Pages (2250 words) Essay

Environment Sustainability Assessment

The author of the paper "Environment Sustainability assessment" will begin with the statement that in recent decades, issues pertaining to environmental degradation have attracted a lot of attention especially due to ever-increasing large construction projects.... In this regard, putting into consideration the magnitude of international attention on sustainable development in the recent decades, there is a need to develop and implement technique and methods that would provide guidance on sustainability assessment and decision making at various project level interfaces (i....
8 Pages (2000 words) Literature review

Risk Assessment of Fire in the Hotel Building

The author of the "Risk assessment of Fire in the Hotel Building" paper highlighters some risk assessment tools that are suitable for assessing risks and hazards associated with a hotel building as hotels are often exposed to a number of risks for instance fires.... Risk assessment is considered as an effective means of identifying risks and determining the most cost-effective means of mitigating, and/or reducing risk (Donald, 2010).... An Independent risk assessment officer can be hired to assess the premises....
17 Pages (4250 words) Coursework

Security Threat and Security Risk Assessments

assessment of threat and risk is a fundamental strategy for the management of security organizations.... assessment of threat and risk is a fundamental strategy for the management of security organizations.... Almost all security organizations need some objective assessment of threats and risks as security controls must be selected centered on actual risks to the assets of the organization.... assessment of threat and risk is a fundamental strategy for the management of security organizations....
6 Pages (1500 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us