This paper "Crude Oil Unit and Project Management Assignment" reviews important questions about servicing and managing crude oil distillation units, their advantages, disadvantages, uses in industrial, and business resources and schemes for every method…
Download full paperFile format: .doc, available for editing
Extract of sample "Crude Oil Unit and Project Management"
Customer inserts his name
Customer inserts tutors name
Crude oil unit and Project Management
19th September 2014
Q1). mentioned the most 10 parts of the crude oil unit . (ex: boilers, heater, exchanger…etc)
Parts of a crude oil unit
1. Boilers
2. Fire pumps
3. Heat exchangers
4. Cooling towers
5. Emergency isolation valve
6. Piperackers
7. Transducer
8. Distillation processing part
9. Hydro cracker
10. Catalytic reformer
11. Desalter
12. Fluid catalytic cracker
Q2). Mention six failures that found in this unit
1. Corrosion of equipment
2. Failure to control mixing of chemicals
3. Failure to use laid down rules in the manual
4. Releasing high-temperature
5. release of flammable fluid
6. Pipe failure
Q3: make a fish diagrams shows the failures and the causes of each one.
Fishbone diagram for crude oil unit
Crude oil process is composed of five business resources: man, machine, method, material and environment. Man is the human resource designated to run the process. Machine is the equipment used so that raw materials may be converted to finished oils. Methods are the techniques used in assessing the different phases during the material conversion. Crude oil are the unfinished elements that are brought together so that they may be converted by the process into an output. Lastly, there are certain conditions in the environment that allow the conversion from input crude oil to output oils. Cause and effect diagrams can be used in solving problems of this process. Cause-and-effect diagram simply refers to a simple aid that is in form of a fish fishbone designed to help in logical determination of various possible causes of unsatisfactory results in the project. As quality control instrument, it is perceived that the possible cause of the problem would release some effects which can then be used to indicate why the a given process within the project’s life cycle goes out of control at a given point. Often the effects that are released by the possible cause is divided into two categories; main and secondary causes. These diagrams are used when implementing projects especially when evaluating the performance of a plant. The plant problems may be complex affecting the production from physical resources to human resources.
Most people have had encounters with poor quality, such as a new vacuum cleaner that worked only once then permanently conked out; airlines losing their passengers’ luggage and university courses that turn out to be different from published curricula. A consumer’s experience with poor quality could even be worsened by the seeming indifference of an employee assigned to manage customer complaints. Successful companies are aware of how important customer-defined quality is to their businesses; hence, they consistently raise their quality standards in order to gain competitive advantage. It is important to note that making quality a priority requires companies to place the needs of their customer first. Prioritizing quality means that customer expectations must be met or even surpassed and this can only be achieved if employees closely interact with one another so that as a team they are able to accomplish collective goals. The diagram will be used to evaluate the causes of crude oil failure to deliver quality oil. The following diagram shows how a plant of the company will use it.
First is to evaluate the mean of the sample against the intended process target. The mean will show how far or near the process target is a given set of data. The second is to evaluate the variability of the individual values that comprise the mean. The variability in results can help a lot in maintaining or controlling quality.
The objectives of effective quality control plans are to identify and resolve problems that are alien to the process design. The resulting action needed to achieve these goals must be reinforced with a high degree of statistical certainty, and must be data and design driven. Decisions should be simple without a set of complicated rules that reflect all possibilities that are theoretically possible but are generally outside of the process design range.
Process evaluation decisions indicate the current state of sample data as well as the historic performance of the process. The objective here is for the samples to control both the “within-lot variability as well as the between-lot variability.
We have identified no link between quality programs and financial budget provisions. Therefore it is suggested that financial benefits of managing quality be measured in full and financial reporting systems linked to other systems.
Crude oil unit has a method of evaluating and monitoring technology application but this need to be improved. The process will also be improved and assessed regularly. Customer satisfaction should be assessed as well as people’s satisfaction. The customer must examine regularly these parameters as well as the impact of the business on society. It is important for the company to realize that self-appraisal is an indication of commitment.
Q4: INSPECTION
Activities
Activities
Duration
Start date
Finish date
Preceding activity
Personnel
inspection review
6 days
10/1/2014
10/8/2014
team leader
choosing inspection team
6 days
10/9/2014
10/16/2014
2
team members
distribution of inspection resources
3 days
10/17/2014
10/21/2014
3
team leader
Training of inspectors
10 days
10/22/2014
11/4/2014
4
team members
Inspection
91 days
11/5/2014
3/11/2015
compliance based review
21 days
11/5/2014
12/3/2014
5
team members
verify SIC code
1 day
12/4/2014
12/4/2014
7
team members
verify emergence procedures
7 days
12/5/2014
12/15/2014
8
team members
verify processes
10 days
12/16/2014
12/29/2014
9
2 engineers
lead operator input
8 days
12/30/2014
1/8/2015
7,10
2 engineers
boilers
9 days
12/30/2014
1/9/2015
7,10
1enginneers and 2 assist engineers
mechanical integrity
17 days
1/12/2015
2/3/2015
11,12
3 engineers
pipe inspection
7 days
2/4/2015
2/12/2015 17:00
13
2engineers
electrical installation inspection
10 days
2/4/2015
2/17/2015
13
1enginneers and 3 assist engineers
capacity inspection
12 days
2/13/2015
3/2/2015
14
3 engineers and 3 assist engineers
storage tanks inspections
7 days
3/3/2015
3/11/2015
16
2engineers
documentation
14 days
3/12/2015
3/31/2015
failures noted
5 days
3/12/2015
3/18/2015
14,15,17
Areas of change
2 days
3/19/2015
3/20/2015
19
Final report
7 days
3/23/2015
3/31/2015
20
Q5: Draw a flow diagram for these activities.
Q6:
Q7: dram a network diagram for the activities.
Find in the attached file of project management
Q8: The Bottleneck
Bottlenecks was due to limited capacity and time to inspect all equipments and machinery is main bottleneck
. A bottleneck occurs in an operation when the work to be performed approaches or exceeds the capacity available to do it.
Seven solutions and put them as briefly point
1). the establishment of correct goals and individual lean strategies may not yield sustainable gains for airline companies unless they handle more complex issues, such as regulating their work and altering the functions of their supervisors who monitor frontline officers.
2). The strengthening of such measures should be an obligation of the top-most executives through junior officers to a cultural adjustment emphasizing, among other issues, the classification of waste, painstaking tackling of problems by the officers that handle customers, and an accentuation of an absolutely utilizing plane and other company assets. Two issues are vital to realizing this change of traditions: a test that serves as evidence of ideology for the whole organization and the precise formulation of lean policies among middle executives.
3). Hire of staff with knowledge to inspect equipment as they work
The technique would also cautiously match the deployment of staff with respect to the ability to inspect as they work and regulate best practices, and minimize inspection times. 3) Change system parameters
4) Outsource the inspection services
That are not driven by broader improvement goals may trigger the creation of a maintenance team that substantially reduced the quantity of tools to meet limit the company expenses.
5). Form maintenance team – the company may fail to recognize the degree which such team can influence turnaround times or degree of crude oil unit utilization. The determination of the amount of time a company must keep its unit running in order to recognize the challenges are equally imperative, as this enables a company to realize that sustainable degree of presentation is implemented to check the bottlenecks.
6) Comprehensive environmental management plan and the emissions inventory go a long way in complying with the laws and the polices to guaranteeing compliance at both the micro and the macro level
7. By making many people aware to be they will get involved
Read
More
Share:
CHECK THESE SAMPLES OF Crude Oil Unit and Project Management Assignment
pon comparisons with the requirement to be able to sign up for the new contract shows at in deed the company can be able to utilise its un used crude oil to meet up the needs of the new contract which promises to be buying the Hi-Grade petrol and one which happens to be the most profitable.... 456 million, then the company can go ahead and initiate the project since there are positive expected cash flows from the projects.... Building a medium park of 180 units however, remains to be the best contributor to the positive expected cash flows from the project....
After the discovery of oil and gas in commercial quantities in Ghana's territorial waters, firms were interested in possibly setting up a refinery in Ghana for the purpose of processing crude oil.... The location of a refinery is also vital because it affects the supply of crude oil which is processed at the refinery.... It is worth noting that access to cheaper heavy crude oil helps the refinery optimize on feedback differentials such as feedstock (Economic impacts of oil spills Spill unit costs for tankers, pipelines, refineries, and offshore facilities 1993)....
BP launched 'project 1990' which was rich in the human resource proposals.... This is a highly steadfast source which may be used to investigate general statements of people which stated that US people saves 25% of the world's oil.... Separate from the retail operations, BP's products like gas stations, BP's corporate operation implicitly positions it as an honest energy company compared to other oil majors.... BP's 'Beyond petroleum' operation has been praised by customer business press as well as have numerous awards that demonstrate it as the prophetic model of convincing corporate social accountability but is criticized as 'greenwashing' by the competing oil producers as well as refiners....
The aim of the assignment is to illustrate the overall organizational structure of Shell Oil Company which is considered to be among the foremost energy companies throughout the globe focussing upon the relevant concepts concerned with the organic form of organizational arrangements.... The company commenced its business operations in Qatar in the year 2002 with the support of the Pearl GTL project along with other business advancement activities....
The production of the oil is done with a mixture of different types of crudes.... The production of the oil is done with a mixture of different types of crudes.... he remaining amounts of crudes are to be utilized in order to produce the Hi-Grade, as this is the most profitable oil for the company.... With the remaining amount of the crudes the production of Hi-Grade oil, which can be produced, is 29,780 barrels.... The requirements of the crude that are to be used in order to produce the required orders and the other orders those are to be produced....
The paper "Gullfaks oil and Gas Field" is a wonderful example of a business plan on marketing.... With the increased level of petroleum consumption in the world, the current status of the oil and gas industry in political, social, and technological spheres has also enhanced.... The paper "Gullfaks oil and Gas Field" is a wonderful example of a business plan on marketing.... With the increased level of petroleum consumption in the world, the current status of the oil and gas industry in political, social, and technological spheres has also enhanced....
This paper "Inspection of crude oil unit Decisions, Cost Estimation, and Risk Analysis" describes that when selecting which option is best for a company, there is a need to analyze the financial benefits of each option.... It is imperative that the management of the crude oil unit should have a detailed understanding of the cost structures of each failure within the unit.... It can occur at any time in the life of the crude oil unit.... Table 8 above shows the show the loss made when cooling towers fail in the crude oil unit....
"Proactive Maintainance in Sub-Sea Gas and oil Systems" paper provides evidence that proves that breakdowns of critical systems in the sub-sea sector should get avoided at all costs.... In order to operate safely, sub-sea systems involved in the extraction of oil and gas ought to put in place similar to strict security policies.... oil and gas subsea systems, therefore, refer to operations that take place offshore....
9 Pages(2250 words)Coursework
sponsored ads
Save Your Time for More Important Things
Let us write or edit the assignment on your topic
"Crude Oil Unit and Project Management Assignment"
with a personal 20% discount.