The author of the "Civil and Construction Design" paper gives a detailed discussion of the design process of a parents’ waiting room and bicycle storage in a school. The priorities of different criteria in construction are discussed by a binary dominance matrix. …
Download full paperFile format: .doc, available for editing
Table of Contents Introduction………………………………………………………………………………………………………………..3 Binary Dominance Matrix……………………………………………………………………………………………….3 Relative Weighting of Different Criteria…………………………………………………………………………........3
Thought Process..................................................................................................................................................4
Health and Safety…………………………………………………………………………………………………………5
Abstract of Cost…………………………………………………………………………………………………………..6
Plan........................................................................................................................................................................7
References............................................................................................................................................................8
Introduction:
The essay gives a detailed discussion of the design process of a parents’ waiting room and bicycle storage in a school. The priorities of different criteria in construction are discussed by a binary dominance matrix. The outline of different thought processes used to reach the final design is mentioned. Health and Safety issues during the construction and operation of the building are discussed. The essay includes a rough estimate of cost and also a rough sketch of the plan of the building.
Binary Dominance Matrix and Design Priorities:
Criteria
A
B
C
D
E
F
G
H
I
J
Total
A Legislation
-
1
0
1
1
1
1
1
0
1
7
B Capacity
0
-
0
1
1
1
1
0
0
1
5
C Strength
1
1
-
1
1
1
1
1
1
1
9
D Aesthetics
0
0
0
-
0
1
1
0
0
1
3
E Sustainability
0
0
0
1
-
0
0
0
0
0
1
F Energy Conservation
0
0
0
0
1
-
1
1
0
0
3
G Quality
0
0
0
0
1
0
-
0
0
1
2
H Comfort
0
1
0
1
1
0
1
-
0
1
5
I Health & Safety
1
1
0
1
1
1
1
1
-
1
8
J Cost
0
0
0
0
1
1
0
0
0
-
2
Relative Weighting of different Criteria:
Criteria
Totals from above
Rank
Weighting
Strength
9
1
0.200
Health & Safety
8
2
0.178
Legislation
7
3
0.156
Capacity
5
=5
0.111
Comfort
5
=5
0.111
Energy Conservation
3
=7
0.067
Aesthetics
3
=7
0.067
Cost
2
=9
0.044
Quality
2
=9
0.044
Sustainability
1
10
0.022
Overall Total
45
1.000
Table 2 Relative Weighting
Thought Process:
The following points were considered before reaching the final design.
1. The area available for construction
2. The number of students enrolled in the school (supposed to be 800)
3. Building materials used in other buildings of the school
4. The entrance and other topographical features of the school grounds
5. Distance from the classrooms
6. The required capacity
7. The number of registered students who come to school riding the bicycle (supposed to be 150)
8. The funds allocated for construction
9. Aesthetics of other buildings in the school
10. Design of bicycle stands observed in different schools
11. Easy access to the entrance for bicycle stand i.e. gate 2
12. Number of parents visiting at a time (supposed to be maximum of 20)
13. Easy approach to the steps leading to the offices and other buildings in school
14. A partition for receptionist is provided
15. Two leaf door suggested as the main entrance of the waiting area
16. Toilets are provided for ladies and gents to facilitate the waiting parents
17. Bracket for water dispenser is provided to facilitate the waiting parents
18. 6 windows are provided to make the building airy
19. Frame Structure allowing further adjustments at later stages of operation of the building
20. RCC structure for the bicycle storage to increase sustainability
21. Provision of lock railing in the middle of the bicycle storage to allow the students to lock the bikes
Health and Safety:
Health and Safety aspects are to be considered both during the operation as well as the construction of a building.
Health & Safety during Construction:
Health and Safety Executive (2010a: 11; 2010b: 19) discusses the welfare facilities and safety during construction:
1. There should be proper restrooms and sanitation facilities at the site
2. The tools and the equipments should be ordered properly
3. Proper lifting mechanism should be used in order to take construction materials to elevated positions
4. There should be proper storage for clothing
5. There must be a rest area to eat and drink
6. Facilities should be kept warm and ventilated
7. People at the working site should be trained to work safely
8. There should be clear space for people working at the construction site
9. The site should be fenced and warning signs should be used
10. Proper scaffolding should be done for working on roofs or elevated places.
11. Heavy construction members should not be installed manually
12. Mechanical aids should be used for transporting materials
Health & Safety during Operation:
‘Construction professionals need to be aware of the existence and scope of the legal duties, and the standards of care required, to ensure that they, and their employers, discharge the duties and thereby avoid civil and/or criminal liability for breach of the duty’ in Health and Safety in Construction by Thomas Telford Publishing, Thomas Telford Ltd. (2002: 3). Therefore it is important that all the requirements regarding health and safety should be known and practiced in construction. The following criteria should be met
1. The strength of the design should be able to bear all the dead and live loads to which the structure is to be subjected.
2. The electrical wiring should be proper
3. Properly ventilated building
4. Properly applied paint
5. The building should have a proper fire fighting system
6. The building must have easy access to health facilities of the vicinity by Health and Safety in Construction in Northern Ireland (1996: 99)
7. ‘The client should take reasonable steps to satisfy himself that the planning supervisor, principal contractor, project designers and any contractors they appoint directly, are competent and adequately resourced to deal with health and safety problems associated with the project both during the construction as well as the operation of the building’ by Health and Safety in Construction in Northern Ireland (1996: 109)
8. Occupational Safety and Environmental Health Guideline (2009: 4) states that the contractor and project developers should maintain the records of post construction storm water management to ensure the safety and timely maintenance of the building.
9. Dr. Jill Wells and John Hawkins in Promoting Construction Health and Safety through Procurement (n.d.: 5) states that the prequalification of contractors should include the contractor’s record on Operational Health and Safety issues and a health and safety policy should be signed with him
Abstract of Cost:
The following is the cost estimate according to the Carilion (2009) schedule of rates.
The labor salaries are given on per 30 days basis by International Average Salary Database (n.d.)
Sr. No.
Description
Quantity *
Unit
Rate ( (£)
Amount
1
Excavation
40
ft3
1.64
65.6
2
Bricks
14750
no.
0.038
560.50
3
RCC
290
ft3
0.721
209.09
4
PCC
55
ft3
0.632
34.76
5
Plaster
330
ft2
0.104
34.32
6
Paint
330
ft2
0.036
11.88
7
Doors
3
no.
25
255
8
Windows
8
no.
12
200
9
Mason
2
no.
763**
1526
10
Labor
4
no.
481**
1924
Table 4 Abstract of Cost
*All values in the quantity column are approximated.
** Based on 15 days.
Sub Total: £ 4821.15
Contractor Profit (12%): £ 578.53
Total Cost: £ 5399.68
Plan:
S. No.
Item
Size
Quantity
Description
1
D1
7’ by 7’
1
Glass Double Leaf Door
2
D2
3’ by 7’
2
Wooden Single Leaf Door
3
W1
4’ by 6’
6
Glass Double Leaf Window
4
W2
3’ by 2.5’
2
Glass Single Leaf Window
Table 5 Details of Plan
Columns in the waiting area: RCC (18” by 18”)
Columns in the bike storage: RCC (14” dia)
Outer Wall of Building: Brick Masonry (9” wide)
Partition Wall of Building: Brick Masonry (4.5” wide)
References:
Carilion (2009) PSA Schedule of Rate for 2009, TSO Construction Publications.
Dr. Jill Wells and John Hawkins (n.d.) Promoting Construction Health and Safety through Procurement , Institute of Civil Engineers.
Health and Safety Executive (1996) Health and Safety in Construction in Northern Ireland, HSE (GB).
Health and Safety Executive (2010) Welfare Facilities and Want Construction Work Done Safely?
Michael Construction (2009) Design-Build Flow Chart, http://www.michaelconstruction.net/services/design/design-build-flowchart.html [23 March 2010]
Occupational Safety and Environmental (2009) Health Occupational Safety and Environmental Health Guideline.
Thomas Telford Ltd. (2002) Health and Safety in Construction, Thomas Telford Publishing.
U.K. Average Salaries (n.d.) International Average Salary Database, http://www.worldsalaries.org/uk.shtml [24 March 2010]
Read
More
Share:
CHECK THESE SAMPLES OF Civil and Construction Design
This is because this century offers solutions to many problems in the building and construction industry.... This is because this century offers solutions to many problems in the building and construction industry.... There are firms formed by civil engineers that look at the construction needs and challenges to find solutions.... They also act as a standard setting institution to certify civil engineers before they get to the construction industry so that they are competent enough....
In bridge engineering and construction, sustainable infrastructure involves planning for the project, designing the structure of the bridge, constructing using the right materials, and maintaining the context sensitivity.... The bridge professionals and transportation authorities should ensure that the right materials and construction techniques are used and presented in a consistent, systematic and credible way.... This will require a lot of time to design, rating or assessment of materials to be used (Institution of Civil Engineers, 2001)....
For calculating the operational feasibility of thermal power plant, following steps will be followed: Uninterruptable supply of fuel to the facility Capable of bearing the entire load for which it is being design.... This manual would affect all engineering staff doing design and all construction contractors performing work on site.... the construction site is provided by roads to transport goods to that part of the area.... Must have ample space to accommodate construction machinery....
In the paper 'Wind moment design analysis' the author analyzes the issues why the moments induced by wind were assumed to be relatively negligible as compared to plastic moment's capacity of the construction beams.... Wind moments remain as the only simple method design for multipurpose frames.... The author states that methodological design is relatively simple of the steelwork in comparison to full rigid construction.... To counteract this old technological view, wind moments or wind connections remain as the only simple method design for multipurpose frames....
As a general rule in most civil and building constructions, the availability of materials would to a large extent dictate the construction materials to be utilized for the constructions.... With newer inventions in building technology and the need to construct sustainable, safe and cheaper buildings, there have been advances in the forms of various buildings, and in the methods of their construction in the UK.... As the European building codes become more advanced and in use, newer and better construction methodologies and conventional methods have emerged....
The paper "design of Civil Engineering Construction" presents concepts that are core to the profession of civil engineering.... The main argument presented here is that it is time that engineering goes beyond the mere construction of admirable structures to designing and constructing structures that are sustainable.... It is worth noting that the construction industry makes a huge contribution towards reshaping the environment and therefore the concepts being suggested in the article will add a lot of utility to this sector as it will be ensured that engineering goes a step further to creating sustainable structures....
"BIM in Civil Infrastructure Planning, design, Construction and Management" paper critically reviews the presentation made by Ian McGregor on the topic BIM in civil infrastructure planning, design, construction, and management who is a product manager.... It provides support for construction, design, and management.... o begin with, the author has highlighted BIM technology as a technology that can be used to design various items....
The situation is achieved by changing the design of the equipment (Easa et al 2008).... This report "Building a Stadium as a Civil Engineer" discusses several changes that a civil engineer can embrace during the construction of the stadium especially the London Olympic Stadium that is expected to be dismantled and be reconstructed.... Clearly, psychology has been an outstanding factor to evaluate much in some areas of civil engineering.... Therefore the know-how and the awareness of psychology should be by default be part and parcel of the cultural fabric of all civil constructions e....
7 Pages(1750 words)Report
sponsored ads
Save Your Time for More Important Things
Let us write or edit the assignment on your topic
"Civil and Construction Design"
with a personal 20% discount.