StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Case study on an historical Civil Engineering failure - Essay Example

Cite this document
Summary
In the United States, the NTSB (National Transport Safety Board) is mandated with ensuring safety standards on the roads, and major highways are upheld. It is also responsible for conducting investigations to establish reasons for accidents and giving recommendations for…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97.2% of users find it useful
Case study on an historical Civil Engineering failure
Read Text Preview

Extract of sample "Case study on an historical Civil Engineering failure"

Download file to see previous pages

After continuous investigations that lasted over 14 months, the investigating bodies concluded that the collapse was prompted by the inadequacy in load capacity of gusset plates that had been used to construct the bridge. The problem of the connecting gusset plates to the truss members had been a design problem, and the error was caused by the designing firm, Sverdrup and Parcel Associates Corporation (Higgins et al. 988). It was assessed that the loading particulars incorporated a mixture of substantial additions in the total weight of the whole bridge construction that had been caused by past modifications to the bridge.

It was also assessed that the traffic on that day of the collapse added on to the construction loads on the bridge. The evidence used to assess and investigate the damage of the bridge has been reviewed in this report. In the year 2007, on the evening of August 1st at around 18:00 hours, the 1,900 foot long I-35 bridge situated on top of the Mississippi River, Minnesota underwent a disastrous failure. The bridge deck truss that measured around 1,500 feet collapsed together with some other adjacent sections of the bridges approach spans that had been sustained by the deck truss.

Media reports showed that there were over 190 individuals who were on that bridge at the time of the collapse. A total of 14 fatalities were reported, with approximately 150 individuals sustaining various injuries. It was also reported that a total of 111 motor vehicles had been on the bridge when it collapsed (Feldman 541). A handful of those vehicles was recovered from the water. The figure below shows the collapsed bridge on the morning after the collapse. The NTSB commissioned a team of experts to investigate the accident scene.

The investigations commenced immediately on the next day after the disastrous collapse of the bridge. The complete investigation with extensive documentation and analysis of the destroyed bridge were presented to the Senate and

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Case study on an historical Civil Engineering failure Essay - 2”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1684988-case-study-on-an-historical-civil-engineering-failure
(Case Study on an Historical Civil Engineering Failure Essay - 2)
https://studentshare.org/engineering-and-construction/1684988-case-study-on-an-historical-civil-engineering-failure.
“Case Study on an Historical Civil Engineering Failure Essay - 2”, n.d. https://studentshare.org/engineering-and-construction/1684988-case-study-on-an-historical-civil-engineering-failure.
  • Cited: 0 times

CHECK THESE SAMPLES OF Case study on an historical Civil Engineering failure

Chernobyl Tragedy - Insight into Engineering Disaster of the Past

The event, which will be discussed, is a major engineering failure that reminds every engineer of the outcomes of an under-engineered system design.... The paper “Chernobyl Tragedy - Insight into engineering Disaster of the Past” assesses the reasons for the accident of a nuclear reactor - the lack of quality control of the used parts of turbines and fissile material, lack of verification mechanism after the end of the operation cycle.... engineering is a special stream of implementing scientific concepts for the ease of mankind....
4 Pages (1000 words) Case Study

Maple Ridge Engineering

hellip; Maple Ridge engineering.... Maple Ridge engineering has various entities and systems working differently from each other.... This project involves an assessment of the technical aspects of the business, in relation to its GEMS system.... The system is still under development and is focused on the business support functions within Maple Ridge....
14 Pages (3500 words) Case Study

The wind turbine, and its failure

The Wind Turbine and Its failure Name: Institution: Course: Tutor: Date: The Wind Turbine and Its failure How the Wind Turbine Works Wind power (wind energy) is basically the generation of mechanical power or electricity from wind.... The Wind Turbine and Its failure The Wind Turbine and Its failure How the Wind Turbine Works Wind power (wind energy) is basically the generation of mechanical power or electricity from wind.... The first failure is the hard-type failure, which includes the gearbox, electric generator and rotor failures....
3 Pages (750 words) Case Study

The Acquisition of LPB

Chances of failure had been more than success as store manager.... Upon acquiring LPB in 1987 from PepsiCo, a French bakery/sandwich chain, the Fields applied a scissor on the count of administrative staff of the acquired company abridging its strength from 54 to 3.... The reason behind as quoted by the Fields was assimilating “many of the… ad functions into our existing organization including accounting, finance, personnel, human resources, training, and development…” The staff not relinquished included 2 in operations and 1 in R&D. The acquisition of LPB was distinct in many respects unlike the previous LPB was a large company; their formulations of baking from the frozen dough the croissants, bread, hot soups and sandwiches, taken from Fields extended cookies business, had a different style....
5 Pages (1250 words) Case Study

Civil Engineering and Construction: Millau Viaduct

"civil engineering and Construction: Millau Viaduct" paper examines the Millau Viaduct that provides a missing link in the A75 autoroute connecting Paris to Barcelona.... A parallel look along the structure reveals a different case with the concrete abutments being wider than the steel pylons.... This is not the case for the bridge since it would need differing spans between the piers resulting in a different number of cables supporting the deck between each pier....
9 Pages (2250 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us