Pre contract cost planning and pre contract cost controlling - Essay Example

Cite this document
Summary
Further, the owner or the client needs to know the cost of construction which caters his design and other structural and his…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95.7% of users find it useful
Pre contract cost planning and pre contract cost controlling
Read Text Preview

Extract of sample "Pre contract cost planning and pre contract cost controlling"

Download file to see previous pages

James Nisbet was the first who conceived and developed the technique of elemental cost analysis for construction projects. Nisbet technique demanded the architects to ‘design to cost’ in opposition to the approximate quantities’ method of estimating, which basically involved costing a design: with very little control. Thus, the elemental costing approach facilitated the client to get a more consistent pre-tender estimate, and offered the design team a model so as to control cost at the design development stage itself.

As per Nisbet, the cost planning should be developed jointly by the quantity surveyor and the architect and postulated that such close cooperation could, in the long run, result in the integration of the profession of quantity surveyors and the architects as one-stop supply of consultancy firms. In 1962, the cost research panel of RICS (Royal Institute of Chartered Surveyors) established the Building Cost Information Services (BCIS) mainly to gather cost data for the introduction of such cost plans.

Now, BCIS has developed a national database in excess of 16,000 element cost analysis, which is available online now. Such data can be utilized to prepare the pre-contract approximating process in the construction sector together to make sure the value for money by assisting the designer to make certain about the most proper distribution of costs well within the concerned project. Thus, cost management is the process of assisting the design team to design to cost instead of the quantity surveyor costing a design (Potts & Ankrah 2013:59).

Cost management is a complete process, which make certain that the contract amount is within the approved budget or cost limit of the client. The modus of the design cost control is that by employing the cost planning method which is the evaluation of existing projects into various functional elements so as to offer a means of evaluation between

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Pre contract cost planning and pre contract cost controlling Essay”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1650598-pre-contract-cost-planning-and-pre-contract-cost-controlling
(Pre Contract Cost Planning and Pre Contract Cost Controlling Essay)
https://studentshare.org/engineering-and-construction/1650598-pre-contract-cost-planning-and-pre-contract-cost-controlling.
“Pre Contract Cost Planning and Pre Contract Cost Controlling Essay”, n.d. https://studentshare.org/engineering-and-construction/1650598-pre-contract-cost-planning-and-pre-contract-cost-controlling.
  • Cited: 0 times

CHECK THESE SAMPLES OF Pre contract cost planning and pre contract cost controlling

Pre-Contract Cost Planning and Cost Controlling

re-contract cost planning and RIBA Plan of Work ... However, Pre-contract cost controlling is quite different from the Post-contract cost controlling.... Pre-contract cost planning informs the owner when financial installments will be required to enable him/her keep current with the billings (Ferry, et al.... When establishing a pre-contract cost plan it is important to create one that follows the RIBA Plan of Work....
9 Pages (2250 words) Assignment

How to Win a Government Contract

This is for the increased risk and cost to the government.... Interim payments/ public vouchers These are a means of vouchering eligible expenses including labor, materials, overheads, and fees under the cost-reimbursement contracts.... The term paper "How to Win a Government contract" states that as a company plans its strategy for a new procurement, there are some major decisions it has to make.... They include the encourage competition, to assist small and medium businesses, to expedite the performance of contracts deemed essential, to make possible large dollar acquisitions, to reduce contractor risk and to lower the overall costs of the contract....
3 Pages (750 words) Term Paper

Hospitality Contract and Event Management

External factors affecting planning and management in the event and contract sectors Introduction.... HOSPITALITY AND EVENT MANAGEMENT by Code+ University name Date Main characteristics of the contract and event catering sectors A contract in the catering sectors involves an agreement between a person who provides catering services and a person with an event that requires catering services such as food supply among other services.... hellip; The reason why people enter a contract with caterer is because caterers provide quality services since they are professional in those sectors....
10 Pages (2500 words) Assignment

Building Cost Estimation and Calculation of Construction Profit

controlling costs are the most important method of increasing profits.... In the essay “Building cost Estimation and Calculation of Construction Profit” the author considers an approach towards a construction project.... Material is bought low and contractor's fee is calculated as a percentage of a higher material cost.... Direct methods are those that are built into the contract, and indirect are those profits that accrue due to an efficient and well-managed project team....
2 Pages (500 words) Essay

Unfair Terms in the Contracts and Exclusion of Liabilities

There are circumstances under which the courts have barred the use of a particular term of the contract simply because the term could be treated as an 'unfair' one.... hellip; The author states that an unfair term in a contract implies that the contract contains a clause capable of causing imbalances in the rights and obligations concerning one of the parties to the contract significantly detrimental to the party.... But it is certain that the Unfair contract Terms Act 1977 considers the invalidation of the limitations and exclusions of the liabilities arising out of the operation of the standard written terms of business in case they are found to be unfair or unreasonable....
62 Pages (15500 words) Essay

Value by Outsourcing in Project and Business

8 Pages (2000 words) Essay

Baytree Plc - Revenue Generating Project

Depending on the constraints faced by the company, there are different procurement methods like Early Selection, Design and Build, Management Contracting, Project Management, Fast Tracking, cost Reduction etc.... Present paper “Baytree Plc - Revenue Generating Project” presents various procurement techniques for a new project for Baytree Plc....
25 Pages (6250 words) Research Paper

Pre-Contract Cost Planning and Cost Controlling

"Pre-contract cost planning and Cost Controlling" paper states that cost control should be provided from start to completion of the project, ensuring that the estimated final cost is always known.... However, Pre-contract cost controlling is quite different from Post-contract cost controlling.... However, Pre-contract cost controlling is quite different from Post-contract cost controlling....  A team of consultants is responsible for providing the service during the pre-contract period, as well as the information needed, and this is what is referred to as cost planning and Cost Controlling....
9 Pages (2250 words) Coursework