StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Construction project (site and environment) - Research Paper Example

Cite this document
Summary
The macro site includes the neighboring suburbs of the site proposed. In analyzing the Macro site, the site proposed site as a whole where analysis of micro site will be involve individual part…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.3% of users find it useful
Construction project (site and environment)
Read Text Preview

Extract of sample "Construction project (site and environment)"

PROJECT SITE AND ENVIROMENT ANALYSIS 0 Introduction The proposed context study will be in 2 categories mainly: micro site and macro site. The macro site includes the neighboring suburbs of the site proposed. In analyzing the Macro site, the site proposed site as a whole where analysis of micro site will be involve individual part analysis of the site proposed. Micro means the small scale things while Macro means the things on a large scale. For instance, a micro climate is particular to area that is small.

Micro site will involve in detail study of the immediate context and proposed project.2.0 Overview of the project The project is by the side of the architecture building inside the Catholic University of America. The project will then discuss more on the location of the architecture building. Next to the Edward M. Crough Center for Architectural Studies, for example there is a flower bed, cobblestone walkway and flagstone (Carthy, 2007). In addition, there is an easy to maintain field of grasses planted on someplace that was once a dry stream bed with boulders, and plantings that replace what was one time a lawn and sidewalk.

In the flower bed that is dry, a series of misters produce an effect of fog-like that develops a cooling microclimate that can go all through the summer. Landscape showing the bed of maintainable grass3.0 Site Analysis of CUA3.1 Micro Site The CUA campus is located in the Brook land in Northeast Washington which is a residential community; 620 Michigan Ave., NE.; is its main entrance. The campus is bound by John McCormick Road to the east, Hawaii Avenue to the north, North Capitol Street to the west, Michigan Avenue to the south.

It is 5 km or 3 miles to the north of the Capitol building. The campus is tree-lined and is which 193 acres is. Modern design and Romanesque are applicable in the major 55 buildings of the university. Between Gibbons and McMahon halls and alongside the National Shrine Basilica of the Immaculate Conception runs are the mall. The Mall is a large grass that is mostly the place of sunbathers and Ultimate Frisbee games. In the middle of Centennial Village is Conte Circle, which is a cluster consisting of 8 residential houses.

Pryzbyla Plaza, with the Shrine in the3.2 Macro siteThe site can be accessed from all main roads in Washington dc.Physical contextTopography and geologyThe Catholic University of America is a private university in Washington, D.C. in the US (United States).Washington, D.C. from spaceEarthquakesEarthquake activity in the District of Columbia is negligible. No cases earthquakes have been centred within the District, nor are there any faults. Nevertheless it has experienced earthquakes centred in Maryland, Virginia, and other surrounding states.

Climate The climate of the site can be summarized in the following diagramsClimate chart (explanation)JFMAMJJASOND  2.8 4329  2.6 4731  3.5 5638  3.1 6747  4 7557  3.8 8466  3.7 8871  2.9 8770  3.7 8062  3.4 6851  3.2 5841  3.1 4733Average max. and min. temperatures in °FPrecipitation totals in inchesSource: NOAAClimate data for Washington, D.C.MonthJanFebMarAprMayJunJulAugSepOctNovDecYearRecord high °F (°C)79(26)84(29)93(34)95(35)99(37)104(40)106(41)106(41)104(40)96(36)86(30)79(26)106(41)Average high °F (°C)43.4(6.3)47.1(8.4)55.9(13.3)66.6(19.2)75.4(24.1)84.2(29)88.4(31.3)86.5(30.3)79.5(26.4)68.4(20.2)57.9(14.4)46.8(8.2)66.7(19.3)Average low °F (°C)28.6(−1.9)30.9(−0.6)37.6(3.1)47.0(8.3)56.5(13.6)66.3(19.1)71.1(21.7)69.7(20.9)62.4(16.9)50.6(10.3)41.2(5.1)32.5(0.3)49.5(9.7)Record low °F (°C)−14(−26)−15(−26)4(−16)15(−9)33(1)43(6)52(11)49(9)36(2)26(−3)11(−12)−13(−25)−15(−26)Precipitation inches (mm)2.81(71.4)2.62(66.5)3.48(88.4)3.06(77.7)3.99(101.3)3.78(96)3.73(94.7)2.93(74.4)3.72(94.5)3.40(86.4)3.17(80.5)3.05(77.5)39.74(1,009.4)Snowfall inches (cm)5.6(14.2)5.7(14.5)1.3(3.3)trace0(0)0(0)0(0)0(0)0(0)0(0).5(1.3)2.3(5.8)15.4(39.1)Avg.

precipitation days (≥ 0.01 in)9.69.010.510.411.110.710.38.28.37.78.69.7114.1Avg. snowy days (≥ 0.1 in)3.12.5.9.1000000.21.58.3Mean monthly sunshine hours145.7152.6204.6228.0260.4282.0279.0263.5225.0204.6150.0133.32,528.7Source: NOAA (1981−2010 normal at Reagan National, extremes 1872−present),[11]Hong Kong Observatory (sun only, 1961−1990)[21]Climate data for Washington, D.C. (Reagan National, 1945-07-01–present)Climate data for Washington, D.C. (Reagan National, 1945-07-01–present)MonthJanFebMarAprMayJunJulAugSepOctNovDecYearRecord high °F (°C)79(26)82(28)89(32)95(35)99(37)104(40)105(41)105(41)101(38)94(34)86(30)79(26)105(41)Record low °F (°C)−5(−21)4(−16)14(−10)24(−4)34(1)47(8)54(12)49(9)39(4)29(−2)16(−9)3(−16)−5(−21) The District of Columbia topography is the same as the physical geography of Maryland.

The District has 3 major natural flowing water bodies; the Anacostia River, the Potomac River and its tributaries and Rock Creek. The convergence the Anacostia and Potomac forms the historic peninsula identified as Arsenal Point. The District is inclusive of Washington Channel, which flows into the intersection of the Potomac and Anacostia rivers. There are also 3 man-made reservoirs:, McMillan Reservoir near Howard University, Dalecarlia Reservoir, which runs over the northwest border of the District from Maryland and Georgetown Reservoir upstream of Georgetown.

A fourth, minor reservoir is at Fort Reno in Taneytown.3.2 Soil Analysis The soil from the site is peat highly organic meaning that the soil is unsuitable for the construction since it cannot support a foundation. This is because the highly organic soils like these exhibit huge settlement weight and their bearing capacity is poor. The location of the building foundations in regards to the soil, require awareness of the foundation hydrostatic pressure and its walls (Carthy, 2007). This soil is not confined and lack the safe bearing capacity required in the laying of the foundation.

Pile foundations might solve this problem since the soil is highly organic. The best economical solution to this problem is to remove or excavate this soil since it’s a hindrance to the construction; this way removing the compact and then importing other suitable soils. The best soils are for instance bedrock which is suitable due to it being safe and having the right bearing capacity (Carthy, 2007). Ultimately result to the series of small gardens formation that cover the path length of Edward J.

Pryzbyla University Center.4.0 Site water tank AnalysisThe CUA rain project team, by the help of the benefactors and Catholic University Community, will provide funds and construct twelve customized water tank with the appropriate design. These 12 tanks will be put up on the Crough Architecture building.4.1 Design process of the tanksThe 12 tanks have a beam structure coupled with a simple post. The external shell consists of 2×45 faced by 4×45, ground by a footings of 3 feet deep. The tanks themselves are put in this shell and then interconnected to the irrigation system and downspouts of the building.

The paper has analyzed the site environment for the construction. Also, the paper has discussed the soil and climate of the site the site project analysis of the site has covered both the macro site plan as well as the micro site plan. Work CitedReferencesCarthy, M. (2007). Inside CUA. Retrieved on 13th March 2014 from: inside.cua.edu/071003/story5.cfmProject Analysis. Retrieved on 12th March 2014 from: www.cuarain.com.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Construction project (site and environment) Research Paper”, n.d.)
Construction project (site and environment) Research Paper. Retrieved from https://studentshare.org/engineering-and-construction/1632341-construction-project-site-and-environment
(Construction Project (site and Environment) Research Paper)
Construction Project (site and Environment) Research Paper. https://studentshare.org/engineering-and-construction/1632341-construction-project-site-and-environment.
“Construction Project (site and Environment) Research Paper”, n.d. https://studentshare.org/engineering-and-construction/1632341-construction-project-site-and-environment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Construction project (site and environment)

Cyclical, Frictional and Structural Unemployment

The construction industry added 169,000 jobs.... The paper “Cyclical, Frictional and Structural Unemployment” examines types of unemployment, different approaches to compiling US unemployment statistics, monetary and fiscal measures to reduce unemployment, principles for developing government policies to combat unemployment etc....
6 Pages (1500 words) Statistics Project

Communication Method Preferred By Workers

The group of workers under investigation construction workers led to the following results.... The group of workers under investigation construction workers led to the following results.... For successful interaction between workers and their bosses and the customer in the company, the use of formal and informal methods of communication needs embracing....
1 Pages (250 words) Statistics Project

Statistical analysis of data

ata Analysis:In this dataset we can find out the average emission of the pollutants over the years for different activities and can report which activity has the most notorious impact on the environment.... Here data ofpollutant emission for three kind of construction activity: Buildings and building construction works, Constructions and construction work for civil engineering and the Specialised construction works has been… This data is a time series data where the emissions of pollutants (in thousands of tonnes) have been recorded from 2000 to 2009 from various constructional activities....
2 Pages (500 words) Statistics Project

Correlation of Core Financial Data of EasyJet and Macroeconomic Environment

The study "Correlation of Core Financial Data of EasyJet and Macroeconomic environment" highlights that high prices of oil have had negative impacts on the company's performance.... But once the prices have started coming down the airline's performance improved.... nbsp; if a company keeps its operations tight, it would cope with negative economic factors....
10 Pages (2500 words) Statistics Project

Accounting Policies and Procedures Followed by J Sainsbury Plc and Tesco Plc

The paper "Accounting Policies and Procedures Followed by J Sainsbury Plc and Tesco Plc" compares the financial ratios relating to fixed assets; operating profit; Property, Plant & Equipment and Provision; liquidity, profitability, gearing, and investment of famous Shop online compared to its rival....
8 Pages (2000 words) Statistics Project

The Results of the Training Program of the Retail Company

In "The Results of the Training Program of the Retail Company" paper different demographic aspects of the sample group are analyzed to determine whether there are interactive effects.... This information helps the company to decide which staff members should be part of the training program.... nbsp;… A Retail Company with more than 500 staff members across ten different locations in the United States was interested in training their staff members to improve job performance....
7 Pages (1750 words) Statistics Project

Electrical Power Applications

"Electrical Power Applications" project focuses on the three-phase alternator and how it constitutes a three single-phase windings spaced resulting in a 1200 displacement o the induced voltage in any of the one phase.... Even though the AC and DC may serve in the same functions of conversion of electrical energy, the powering and construction occurs differently....
9 Pages (2250 words) Statistics Project

The Study of Direct Annual Sales of 400 Dutch Fashion Stores in 1990

“The physical construction of the buildings, the locations, and style of the stores - all these things are social constructions but entrenched to various degrees” (Aspers 2010, p.... "The Study of Direct Annual Sales of 400 Dutch Fashion Stores in 1990" paper focuses on the data which pertains to the study of direct annual sales of 400 Dutch fashion stores in 1990, even while discussing the physical space and working of the employees....
9 Pages (2250 words) Statistics Project
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us