StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Oil Company and Pipeline - Case Study Example

Cite this document
Summary
Engineering profession like any other profession has a body that sets the guidelines on the code of conduct and what one would be liable in case they breached the code of conduct (Canadian Engineering Qualifications Board). This case is based on the ethical conduct of…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER93.7% of users find it useful
Oil Company and Pipeline
Read Text Preview

Extract of sample "Oil Company and Pipeline"

Download file to see previous pages

The case fall under the Alberta’s Pipeline Act, Pipeline Regulation, and applicable Canadian Standards Association (CSA) standards. Lance was hired by Bikal within the contract period to inspect the pipeline. Bikal’s contract was under the following condition “to maintain Akel’s refinery with the agreement of payment only during the uptime of the refinery”. This shows that Baikal was in the line of duty and sought to hire an outside company to work on the inspection. It is professionally ethical to consult with other companies to provide services.

Baikal therefore, was to enforce a contract with Lance by having a written agreement so that the contract between the two was enforceable by law. Lance duty was to ensure proper inspection was done. Engineering allows for non-destructive testing of the materials in this case the refinery has the pipelines. What lance did was to work on the minor aspects of the pumping system as well as keep time as required by Baikal. This case is based on the pressure in the system where they were right to check the source of the pressure that is the pump.

Engineering formulates guidelines on how to undertake such measures to prevent leakages in the drainage and unnecessary pressure build up, the material under testing. This provides necessary actions and safety measures for pressure testing. Akel the contracting company who owns the refinery plays a role in the case as the paying party. Failure of the system to operate means the termination of the Baikal contract. This case has incurred Akel several expenditures from the replacement of the pump as well as the broken pipeline.

Akel is obliged to ask what went wrong as he enquired and found out that the first report submitted by Lance engineers was inadequate, missing standard tests. The problem was primarily due to erosion in the pipe and could have possibly led to a disaster. Lance engineers cited that “Baikal had given them

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Oil Company and Pipeline Case Study Example | Topics and Well Written Essays - 1250 words”, n.d.)
Oil Company and Pipeline Case Study Example | Topics and Well Written Essays - 1250 words. Retrieved from https://studentshare.org/engineering-and-construction/1627200-oil-company-and-pipeline
(Oil Company and Pipeline Case Study Example | Topics and Well Written Essays - 1250 Words)
Oil Company and Pipeline Case Study Example | Topics and Well Written Essays - 1250 Words. https://studentshare.org/engineering-and-construction/1627200-oil-company-and-pipeline.
“Oil Company and Pipeline Case Study Example | Topics and Well Written Essays - 1250 Words”, n.d. https://studentshare.org/engineering-and-construction/1627200-oil-company-and-pipeline.
  • Cited: 0 times

CHECK THESE SAMPLES OF Oil Company and Pipeline

Standard Of Monopolized The Oil Industry

Standard Oil also offered the former executives, of the acquired companies, high positions in the new company and was assured parity in management and was assimilated into the management because they were experienced and were well acquainted with the oil industry and local markets (Montague 76-81).... In 1890, Rockefeller together with other partners formed the Standard oil company.... In 1874, the company started purchasing new oil pipeline networks....
4 Pages (1000 words) Essay

Oil Exploration And Development

Creative negotiations will have to take place with one or both of these countries in order to work out land rights if a pipeline were considered.... Possessing oil rich fields, ripe for development, no longer equals huge overnight profits.... … Political, legal and economic conditions need to be researched in depth before deciding whether or not to join forces with the oil industry.... Political, legal and economic conditions need to be researched in depth before deciding whether or not to join forces with the oil industry....
8 Pages (2000 words) Essay

Keystone XL Pipeline Project

TransCanada made the first announcement to construct the Keystone XL pipeline in 2005.... eystone XL pipeline project when complete would transport crude oil from Hardisty to US markets mainly the Midwest and Gulf coast.... It was done to determine the best location the pipeline would pass with minimal environmental impacts.... Keystone XL pipeline project poses a high risk to the neighboring community because the potential of spillage is huge....
4 Pages (1000 words) Essay

Boston Matrix Tool with Product Life Cycle Management

This means that the company is not a new entrant in the market, and it can only move on without challenges that can hinder it to develop the strategic market plan for the next ten years.... The company has the opportunities of using drones and Geographic Information System for managing oil, gas theft and spillage along the pipelines and their goals is likely to be achieved within the specified timeline.... Since the company has been operational for a longer time, challenges are solved when they emerge and thus the ten-year strategic plan being obtained by the specified deadline....
7 Pages (1750 words) Assignment

California oil spill sparks state of emergency

That spillage resulted from an onshore pipeline that ruptured.... An official from the Plains American pipeline that owns the pipeline Darren Palmer said that the running rate of the pipe at the time of spillage was approximated to be eighty-four thousand gallons per hour.... The pipeline was built over two decades ago and had been serviced and tested some weeks before the spillage.... The company official said that they will handle the spill and will cater for the incurred costs at the time of removing oil from the surrounding....
6 Pages (1500 words) Assignment

Governing Carbon, Global Warming, Air Quality Deterioration

Rick McMichael of Plains All American pipeline asserts that the… Moreover, McMichael states that line 901 were not operating at competence previous to or throughout the handout (CNN).... In the intervening time the federal pipeline and Hazardous Materials Administration.... It conked out, and dropped up to 101,000 gallons of crude oil along the Santa Barbara coast last month.... It is evident that global warming, air quality deterioration, oil spills and acid rain are increasing the environmental damage caused by fossil fuels....
4 Pages (1000 words) Essay

The Primary Purposes of Transport and Delivery

Quite often, refineries are located in geographically close regions so a pipeline is often laid down to transport the oil.... is one example of a country that has a tremendous pipeline system for the transportation of petroleum products across the land and a representation of that is given in Figure 1.... The paper 'The Primary Purposes of Transport and Delivery' presents petroleum and oil products that have become the lifeline of our modern economy over the years....
8 Pages (2000 words) Term Paper

Ffshr ilins and i-In Sls

These pipeline networks efficiently transport oil and natural gas throughout their entire life cycle, from their point of exploitation all the way to ultimate consumption.... Although petroleum pipelines did not immediately emerge at the beginning of the oil industry in the United States, they quickly emerged as the most cost-efficient and safe method to transport petroleum products to sites of production and consumption.... Because of its simplicity and efficiency, and “virtually unnoticed by the public, a vast network of pipes was developed between the oil wells and collection points and then between producing areas and refining centers” (Antak, 2012)....
8 Pages (2000 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us