StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Finance,measurement.procurement in construction - Coursework Example

Cite this document
Summary
Contractors must prove to be suitable to undertake the contract and the consultant must come up with ways of ascertaining the suitability. In doing this, as the consultant, I will employ the…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95.2% of users find it useful
Finance,measurement.procurement in construction
Read Text Preview

Extract of sample "Finance,measurement.procurement in construction"

Download file to see previous pages

on boards on the listed contractors, which will indicate the projects they have accomplished, and the experience in terms of duration of engagement in similar projects. During the invitation to bid, contractors are provided with the questionnaires to fill in information relating to business details, technical competence and ability, financial ability to accomplish the project depending on the value, environmental issues, insurance cover and previous work experience to accomplish similar scope of work.

The potential contractors will fill in these details and provide information from their perspective and records as to the expected potential to accomplish the project. As the consultant for the client, I will be able to verify the information provided by the contractors after reading through their respective questionnaires. Financial position of the contracting firm will be revealed from the bank statements while the existence of the business can be found from the list of registration of such companies.

Technical ability of the contracting firm is revealed by inspection of their equipment and machinery for the intended work. Representatives do the inspection from the consultants firm visiting the premises of the bidders while listed assets of the contractor can also provide such information. UEL project for L & H is to provide procurement services require high technical ability as well as financial strength. Based on these requirements, the most effective tendering procedure would be restricted tender.

Capable contractors can be identified then invited to bid for the works (Amos 2004). Through this process, they will be able to find bids only from contractors with the technical ability, financial backing and previous work experience to successfully accomplish and deliver the works according to the scope of work. The construction of the subway requires technical knowledge and the necessary machine for excavation and setting of the three rail lines required as well

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Finance,measurement.procurement in construction Coursework”, n.d.)
Finance,measurement.procurement in construction Coursework. Retrieved from https://studentshare.org/engineering-and-construction/1609405-financemeasurementprocurement-in-construction
(Finance,measurement.Procurement in Construction Coursework)
Finance,measurement.Procurement in Construction Coursework. https://studentshare.org/engineering-and-construction/1609405-financemeasurementprocurement-in-construction.
“Finance,measurement.Procurement in Construction Coursework”, n.d. https://studentshare.org/engineering-and-construction/1609405-financemeasurementprocurement-in-construction.
  • Cited: 0 times

CHECK THESE SAMPLES OF Finance,measurement.procurement in construction

Quantity Surveyor in a Construction Company

Quantity surveying includes managing and controlling costs within the construction project and may involve the use of management procedures and technical tools to achieve this goal.... hellip; There are also two kinds of QS the Private Practice and the one who is employed in a construction company.... Quantity surveying is a superb career for men and women who have the desire to involve themselves in the exciting world of construction and development. Quantity Surveyor (QS) controls the construction costs by measuring accurately the work required, the application of expert knowledge of costs and prices of work, labour, materials and plant required, an understanding of the implications of design decisions at an early stage to ensure that good value is obtained for the money to be expended....
6 Pages (1500 words) Essay

Project Management: The Scottish Job

The time scheduled for completion may not be correctIncreased integration between financial and real sectors of the economy, and major capital commitments in the building, means that the poor quality of risk management in construction has perhaps a greater significance at present than at any other time since the 1970s (Flanagan & Norman, 1993).... The building was planned by the British government before the Scottish parliament was created and the process of construction began in 1998....
9 Pages (2250 words) Essay

Public-Private Partnership and Private Finance Initiative

The Private Finance Initiative (PFI) is a type of Public-Private Partnership (PPP) where the local authorities are capable of gaining access to the recent new capital assets and frequently they take the form of buildings but it is not a must that they are buildings they may as… Contrary to the traditional procurement methods, the public sectors doesn't purchase the assets but it pays for the period it has used the assets combined with other related services like cleaning and security....
12 Pages (3000 words) Essay

The Role of Project Manager as Planner, Controller and Community Stakeholder

From the paper "The Role of Project Manager as Planner, Controller and Community Stakeholder" it is clear that high-quality business relationships are vital to gain collaboration and ongoing respect for the project, taking into consideration how the community views renovation and construction efforts.... Planning involves a focus on human resources development, maintaining quality in not only construction but in collaboration and controlling process and resource allocation in the most cost-effective method available....
7 Pages (1750 words) Coursework

A Fundraising Event in Singapore for a Charity Organizations

The technical requirements for this project includes expertise in building and construction , quantity surveyors, financial professional accountants who will give how these funds are going to be used.... This has led to many people coming together to form children's homes for their transformation into useful members of the society....
7 Pages (1750 words) Assignment

What Is Taking Off Process

Nowadays, the growth of computerised measurements… The document used in tendering process within construction projects is the Bill of Quantities.... In addition, the This paper looks at all possible uses as well as purposes of the taking off process within the administration of all phases of a proposed development or construction project.... IT details specifications as well as method of the manner in which every item within the industry of construction is supposed to be measured....
8 Pages (2000 words) Essay

The Effective Delivery of Construction Business Development

This case study "The Effective Delivery of construction Business Development" examines research key performance indicators – KPIs, to create a construct of such indicators that can be mapped to the success of projects.... Case studies of a few leading construction firms have been studied and their adherence to the KPIs is discussed.... nbsp;… The case study is organized as follows, Section 1 gives information about the construction firms selected for defining the KPI variable and it gives a brief overview of the economy and construction sector....
13 Pages (3250 words) Case Study

The Taking Off Process

Basically, quantity surveyors are mandated with the estimation of costs and the contracts of the construction works.... he bill of quantities can be defined as a document used in the tendering process in a given construction project.... The first stage involves the measurement of the dimensions and a compilation of the description from the blueprints and the drawings....
10 Pages (2500 words) Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us