StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Wast Management in Construction and Demolition - Research Paper Example

Cite this document
Summary
Topic: Waste management in construction and demolition (C&D) 1. Introduction This study aims to determine the veracity of the following thesis statement, that: The reduction or elimination of construction waste/ demolition debris may be achieved by adoption of sustainable waste management strategies and practices during all stages of the construction or demolition process…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.3% of users find it useful
Wast Management in Construction and Demolition
Read Text Preview

Extract of sample "Wast Management in Construction and Demolition"

Download file to see previous pages

C&D waste would typically include most construction materials, such as concrete, wood, metals, gypsum wallboard, asphalt, and roofing materials; some have the opinion, however, that land-clearing debris that includes soil, tree stumps, and rocks should be included among C&D waste. Some would not consider these waste as they are materials that naturally occur in such form in nature, and are merely being relocated from the construction site. Some consider them as within the scope of C&D waste that must be addressed, because in the course of construction they would normally be hauled away for disposal (EPA, 2000, p. 2-1). 1.1. Historical background of C&D waste management and recycling industry There was a time when buildings were made to last, and it was not unusual to plan for structures to last for a hundred years or more.

More recently, however, the “throwaway society” made it a practice to regularly demolish relative new buildings in order to build new ones in its place, which were deemed better suited to the changing tastes and needs of society. The forecast is that between 2000 and 2030, about 50% of all buildings at present shall be reconstructed, and 27% will be completely replaced. According to Priesnitz (2007:21), this practice is now viewed as wasteful and environmentally unsustainable. As a consequence, the green building industry focuses on creating structures that will last a long time, consistent with former practices.

However, unlike the earlier practices, the new state of the art is aimed at creating structure that easily adapt and may be completely recycled if need be, instead of just being made to endure in the same state forever. The C&D recycling industry in the U.S. began to take shape in the 1990s, when “green” construction philosophies became the norm among companies in line with efforts to promote their corporate citizenship and social responsibility thrusts. In order to keep up with the competition, there likewise emerged the need to acquire Leadership in Energy and Environmental Design (LEED) certification for renovations as well as new structures.

LEED points are awarded construction firms which have effectively implemented C&D waste management programs (Fickes, 2011). Aside from internal industry competitive pressures, government regulation had a lot to do with the furtherance of systematic C&D waste recycling. Many localities, including several counties in California, Oregon, and Washington, and the state of Massachusetts, had banned outright the disposal of C&D waste in landfills. Furthermore, landfill fees have steadily increased, increasing the costs to construction companies and fuelling the incentive to recycle C&D wastes.

By 2009, the industry has grown to the point that Waste Management Inc. of Houston and McGraw Hill Construction of Massachusetts collaborated in profiling the fledgling C&D recycling industry, with some 200 building contractors surveyed and growth projections drawn until 2014. Their study shows that presently, contractors generate as much as 143 million tons of C&D waste yearly; roughly one-fourth of this (approximately 35 million tons) is recycled (Fickes, 2011:78). 1.2 Description and classification of C&D wastes The definition of C&D waste is a matter of importance, because the nature of the waste matter and the degree to which it is not contaminated by other waste materials determines the manner

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Wast Management in Construction and Demolition Research Paper”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1433649-engineering-sustainability-it-is-an-open-topic
(Wast Management in Construction and Demolition Research Paper)
https://studentshare.org/engineering-and-construction/1433649-engineering-sustainability-it-is-an-open-topic.
“Wast Management in Construction and Demolition Research Paper”, n.d. https://studentshare.org/engineering-and-construction/1433649-engineering-sustainability-it-is-an-open-topic.
  • Cited: 0 times

CHECK THESE SAMPLES OF Wast Management in Construction and Demolition

Building Performance

At present due to the decrease land fill sills for the construction and demolition waste, the expenditure of the waste management was being increased.... The demolition debris and construction waste were the components that should be managed or recycled.... The waste from the demolition can be uninitiate or the site else wherehe wood materials can be used easily without any need of extra technology for the making of wooden articles required for the new construction....
18 Pages (4500 words) Assignment

What Forced Governmental Agencies in Chesterfield Derbyshire to Study Planning in the Construction

The study "What Forced Governmental Agencies in Chesterfield Derbyshire to Study Planning in the construction?... aims to inform the officials and society about the need to remodel the housing finance system with respect to the advanced global technologies of economics.... hellip; The financial variation has developed great challenges to professionals who have engaged in housing and regeneration process....
8 Pages (2000 words) Term Paper

Waste Management in Construction Industry

Disposing of construction and demolition debris in landfills consumes enormous amounts of difficult to develop space and is both economically and environmentally costly.... This essay "Waste management in construction Industry" characterizes the importance of waste minimization techniques such as reducing, reusing, recycling, and disposing of construction waste, addressing the most common factors that affect the reuse and recycling of construction waste.... he construction industry, and particularly design, construction, demolition, upgrade, and maintenance of structures have a tremendous impact on the environment and natural resources....
17 Pages (4250 words) Essay

Sustainability in the Construction Industry

Further, the building construction is considered as a cyclic process, which consists of either demolition of structure at the site and constructing's structure they're its place.... This paper ''Sustainability in the construction Industry'' tells that The demand for better infrastructure structure systems has led to large-scale consumption of all types of building materials.... One of the ways of attaining this objective is by using the recycled materials for construction activities....
13 Pages (3250 words) Essay

Recycling of Construction and Demolition Waste

The United Arab Emirates It is estimated that 55 percent of this total waste comes from construction and demolition, 20 percent from municipal waste, 18 percent from industrial waste, and 7 percent from hazardous waste.... It is necessary to manage construction waste profitably so that it is not detrimental to environment and creates additional revenue (Government to tackle demolition waste).... The rapid development in the region, population growth, industrial diversification and construction activities combined have led forecasters to predict that the Middle East will invest billions of dollars in waste management sector over the next few years (Summit to focus on waste control)....
10 Pages (2500 words) Essay

Environmental impact

The construction industry may experience serious impact in future related to environment if certain measures are not taken soon enough (Anderson & Shiers, 2007).... The comparison deeper looks into the material assessesment and other components across the whole building circle and the specifications which range from floor, ceilings… nd external walls etc, therefore, in normal cases building specifications are usually assessed buy the use of BRE's Environmental Profiles Methods of 2008....
4 Pages (1000 words) Essay

Maltese Islands Demolition and Construction

The paper "Maltese Islands demolition and Construction" gives detailed information about the benefits that the Maltese government will achieve out of the demolitions, for instance, the residential houses that will be built after the demolition will attract tourists and other investors.... As a result, the demolition work will be conducted by a foreign contractor that employs adequate capital and also has to solidify its name as a professional....
12 Pages (3000 words) Assignment

Cockcroft Building Refurbishment

Demolition, construction and refurbishment and processes for the supply of materials produce a considerable amount of waste.... There is normally a huge variation in construction sites.... In some waste minimization initiatives site managers are offered deals by firms to combine architectural salvage with demolition.... The salvage is then used to pay for demolition.... They are produced through processes of construction, demolition and refurbishment, and renovation....
15 Pages (3750 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us