Retrieved from https://studentshare.org/engineering-and-construction/1394091-procurement-system-recommend-using-in-janus
https://studentshare.org/engineering-and-construction/1394091-procurement-system-recommend-using-in-janus.
Most recently, the concerns about sustainability and environmental impact alarmed individuals, civic organisations, and even the global governments to subject themselves to goals that deter the destruction of the natural environment and ecological processes. This is in line with the reduction of the negative impact of global climate changes, and disasters caused by mankind’s mindless consumption, waste generation, pollution, and other activities including construction of built environment. All activities point out and lead to connected sourcing up to disposal so that each step of every process has become an important part of a whole.
This paper will try to determine one company –Baytree Leisure Plc’s possible procurement issues as well as possible solutions to develop a proposed motorways services area in Yorkshire with close consideration of environment impact as well as sustainability. (i) Analyse the key procurement issues for Baytree Leisure plc to consider, including a review of their likely project success criteria and objectives for the proposed project Salteroyd. Identify any assumptions that you have made. The Key Procurement Issues for Baytree Leisure Plc In consideration of the proposed plan to provide the Motorway Services Area (MSA) on the M7 motorway in an area in Salteroyd in the county of Yorkshire, various procurement issues must be addressed.
The aim of the plan is to meet the expectations resulting from the climate change agenda and drive to reduce carbon dioxide emissions. The customers and consumers are therefore expected to become more selective in their buying decisions and would consider use of built environment such as the MSA to adhere to environmentally responsible developments. Sustainable building design and construction is therefore a must for Baytree. Design Foremost about the procurement process issue that Baytree needed to address is design.
Design in the built environment means a plan for achieving goals or requirements by clients in consideration of users, environment, as well as other factors that will guide or limit the designer (Ralph and Wand, 2009). It serves as a guide to meet the least and the loftiest of details for a more holistic approach, and in this process, an ecologically sound MSA. Design choices as already mentioned, is guided by the principles of sustainability, environment-friendliness, costs, economics, functionality, ergonomics, or change methods to meet goals (Holm, 2006).
Approaches in design includes user-centred usually guided by the function, multiple approaches, as well as keep it simple or KISS with minimised process and content but with consideration to aesthetics (Holm, 2006). Design also applies the following: Explore possibilities addressing problem and research that involves all stakeholders in the presentation of goals; Redefine development and improvement of traditional specifications and guidelines for options, solutions, and goals; Manage approaches to defining, exploring possibilities or creating ecological designs; Prototype or production of possible products to improve existing or traditional designs; Trend-spot merging concepts and products in order to innovate (Getlein, 2008).
In addressing design issues, the project owner and its contractors will be able to provide a guide for the procurement specifically based on the
...Download file to see next pages Read More