Critical Evaluation of the Constraints Faced by Project Managers and How These Impact Project Scheduling and Planning
Read TextPreview

Extract of sample
"Critical Evaluation of the Constraints Faced by Project Managers and How These Impact Project Scheduling and Planning"

Download file to see previous pages The attention of the whole company is focussed on a particular problem that is of great concern to the consumer (the challenge). The rest of the activities in the company are synchronized with the challenge process, which makes sure that the challenge process is not piled up or it is starved because the needed inputs are not available. The bottleneck must be eliminated in any way possible and this increases the capability of the entire company (Jawa 2004, p1). For many years, project managers have been told to focus on constraints. In projects, a constraint is thought to be an important path, which is a series of activities that determine the least time required for the project to finish. Vanhoucke (2012, p192) further notes that the project management generally overlooks the scarce resources required by activities which are either on or off the critical path and probably by other projects (Vanhoucke 2012, p192). Goodpasture (2004, p211) also asserts that project constraint is a critical path. In other words, the project is constrained to a particular duration, and the constrained time cannot be shortened. The impact of the critical path is that the constrained throughput cannot be increased, and thus, the throughput is threatened if the critical path is not managed in a proper way (Goodpasture 2004, p211). It is worth noting that all projects have constraints. Not very long ago, the three main constraints (also known as the triple constraints) were the project management creed spoken by experienced project managers. The three main constraints that project managers face include scope, cost, and schedule. However, these are not the only constraints faced by project managers; other constraints include consumer satisfaction, budget, and quality. All the mentioned constraints have significant impact on the outcomes of the project, and that is why they get considerable attention (Heldman 2011, p23). Scope All projects are set out to generate a unique result or product. Scope describes what the result or the product should be like. It considers the objectives and the goals of the project and defines what the project is attempting to achieve. The goals are then broken down into smaller elements until the work can be easily described. Scope can frequently change or grow during the course of the project. Thus, it is very crucial to document scope. Scope generally entails interchanges with the other constraints, and transformations in scope will affect budget, time, or both. Changes in the time or budget can also affect scope. For instance, if one is constructing a new house on a restricted or limited budget. The individual wants granite countertops in the bathroom, but he does not have sufficient money in the budget. Then, the scope has to be modified and a different material chosen for the countertops to avoid the necessity of going over the budget again (Heldman 2011, p23). Schedule Majority of the projects function under some form of deadline. If the project involves constructing a new shopping center that must be completed in time for the holiday shopping period, then the project is time-constrained. Schedules are developed on units of time thus; the word time is sometimes used in place of the word schedule when describing the triple constraints (Heldman 2011, p23). The time deadline governs the manner in which the project activities are completed and scheduled. The projector requestor or the stakeholders ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Critical Evaluation of the Constraints Faced by Project Managers and Essay”, n.d.)
Critical Evaluation of the Constraints Faced by Project Managers and Essay. Retrieved from https://studentshare.org/business/1454322-pm
(Critical Evaluation of the Constraints Faced by Project Managers and Essay)
Critical Evaluation of the Constraints Faced by Project Managers and Essay. https://studentshare.org/business/1454322-pm.
“Critical Evaluation of the Constraints Faced by Project Managers and Essay”, n.d. https://studentshare.org/business/1454322-pm.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
Scheduling and Project Management
... need reasonably accurate estimates of the time required for performing various activities. In a situation in which the project manager is dependent on other functional heads for support, it might be difficult to estimate the time for several activities, and even more difficult to complete the activities within the planned timeframes. Even without these complications, project managers face a difficult task. It has been found that even when project managers make reasonably good estimates, implementation suffers because of oversight and the failure to ensure that all activities are included. (Dinsmore & Cabanis-Brewin, 2006, p. 456) In an organization such as Wal-Mart, this is more likely, because the people who provide the inputs... and...
2 Pages(500 words)Essay
Evaluation Project
...?Evaluation of the BP Deepwater Horizon Oil Budget report Summary The of the report being evaluated is BP Deepwater Horizon Oil Budget: what happened to the oil? This report was assembled by the National Incident Command (NTC) in late 2010. There are seven authors associated with the original report. Additional credit was given to 32 additional scientists who contributed by assisting in verifying oil budget calculations, field data contributions, formulas, analysis approaches and reviewed various algorithms used. Special note is made that the current document is not complete and may have changes applied over time as necessary, as the team continues to refine the analysis. (Report 5) The report itself...
2 Pages(500 words)Essay
Project Managers and Functional Managers
..., 2010). Schedule management is very critical because all the projects must be complete by the time the Olympic starts. Leadership skills are the more necessary because of the diversity of teams handling various projects, and yet they must all work together. Finally, the technical skills required to finish the job done are very diverse, but still necessary within the project teams. Kerzner (2009) argued that there was need to upgrade the skills and competencies of project managers in the twenty first century to constitute, “Knowledge of the business, risk management, and integration...
4 Pages(1000 words)Essay
Project Budgeting and Scheduling
...of which 30% was for waste treatment facilities, 15% for schools, 12% for transport and 11% for housing (Morse, 2010). As one can comprehend, this brought a loophole in the provision of welfare facilities to the public at the rate planned and thus, the government also faced hefty disruption as a result of the credit crisis. In 2009, banks started lending to the government again but in smaller amounts. In order to tackle this situation, the government formulated a unit by the name of the Infrastructure Finance Unit (IFU) through which the government was able to lend the deficit amount to the private sector, negotiate financial terms, evaluate alternatives and work towards smarter...
6 Pages(1500 words)Essay
Project Scheduling
...1 Project Scheduling Introduction The uses of network analysis are as extensive as the itself. Planning, scheduling and control of large projects has become less difficult because of the tools of networking. Yet at the same time network analysis should not be seen as a tool for managing complexity in isolation. Although program evaluation and review technique PERT) and critical path method (CPM) are the most important tools to have been developed since the Gantt in 1917, other related techniques like work breakdown structures WBS, cost optimization and control are as important to the economic and timely...
18 Pages(4500 words)Essay
Project Planning
...Project management Table of Contents Project Planning 3 Project Scheduling, Estimating and Cost Control Techniques 5 Measuring project performance 7 Project Change Control Procedures 9 Project PlanningProject Planning is the initial stage of project development. To accomplish the objectives of the project, it is necessary to develop an effective planning which will help to accomplish the project objectives within the specified time frame. To successfully...
7 Pages(1750 words)Essay
Project Managment Scheduling queastion
...August 17, Project Management Scheduling Outline The Critical Path (CPM) method and the Program Evaluation Technique (PERT) are two vital toolsof project management and scheduling. While CPM is a deterministic model used for scheduling of projects activities of known time durations, PERT is a probabilistic model generally used to schedule activities with uncertain time durations. a) Scheduling the constructing a new building for AXBC PLC. Activity Optimistic time (a) Most likely (m) Pessimistic...
8 Pages(2000 words)Essay
Project Planning
...Project Planning Introduction Project planning and team building are two most important ingredients in project management. Planning should be executed by an effective team because a very good plan can be spoiled by a poorly developed team. Likewise a good and effective team cannot work well with a poorly developed plan. Successful projects are executed by an outstanding team with a well-developed and well-considered plan. (Thomas et al., 2008) Experiential learning activity is a classroom activity which involves application of project...
8 Pages(2000 words)Coursework
Project Design Constraints
...Project Design Constraints Heart valves are normally very vulnerable and prone to malfunction and disease, as a result of these, mechanical heart valves (prosthetic heart valves) are made to replace heart valves that no longer function. There are two main varieties of prosthetic heart valves, they are the bio prosthetic, and the mechanical heart valves. Mechanical valves are excellent when it comes to durability, however, they tend to coagulate blood flowing in them. On the other hand, the bio prosthetic valves are not as durable as the mechanical valves. They, therefore, have to be replaced on a regular basis. When making or designing these hearts, a lot has to be put into consideration: for instance, that the body is a hostile...
2 Pages(500 words)Research Paper
Project Scheduling for Effective Project Planning and Management
...Project Scheduling for Effective Project Planning and Management Table of Contents Table of Contents 2 LO1 3 Introduction 3 Quality and Project Management 4 Human Resource Aspects of Project Management 5 LO2 8 Project Details 8 Critical Path Analysis Calculation 9 Critical Path 10 Critical Path Network Diagram 11 Gantt chart 12 12 The procedures you would adopt to monitor and control the progress of the project 13 References 14 LO1 Introduction This assignment is divided into two sections. In the first...
8 Pages(2000 words)Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Let us find you another Essay on topic Critical Evaluation of the Constraints Faced by Project Managers and How These Impact Project Scheduling and Planning for FREE!
Contact Us