The project will need both skilled and non-skilled labor. For the skilled labor, the project requires three skilled electrical artisans. The artisans will help in making house lighting connections and direct the non-skilled laborers. The other workers will be sourced among the villagers and provided with training on how to take care of and maintain the project in the future. They can, however, enquire for skilled artisans if complex problems surface.
As indicated earlier, the transport system of Sandikohla is in a very dilapidated state. Transporting project materials by road to the village is challenging. Materials from the town to the village will be transported using a truck. VR Kung Factory has trucks that they lend to their customers to transport the materials they buy. The drivers of the trucks also understand the extreme terrain of the area and will know the safe routes to use. Routes with minimal hills and less mud will be used (“Ewbchallenge”, 2014).
There is no sophisticated machinery needed for the project to be successful. Some of the simple equipment needed include; Ladders, Drillers, and Electricity meters (“Indiana”, 2011).
Besides the solar panels, the project requires some basic materials such as timber, nails, PVC pipes, connecting wires, switches, and iron sheets. The project also needs a perimeter fence made of wood to keep people away, as well as, a metallic gate for enhanced security.
The project will take between one and two weeks to complete. The initial days of the week will involve meeting the villagers and purchasing solar panels and other materials. By the third day, building the project should be underway and take less than three days. The rest of the days are distributing the power to the villagers.