StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Design of Stormwater Drainage System - Term Paper Example

Cite this document
Summary
This is mainly because water is quite a sensitive product that almost all of the living things depend on. Therefore, strict codes of ethics must be placed to guide in…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95.5% of users find it useful
Design of Stormwater Drainage System
Read Text Preview

Extract of sample "Design of Stormwater Drainage System"

Design of Stormwater Drainage System 6.3 Relevant s of Ethics and Moral Frameworks The relevant s of ethics and the moral frameworks in the design of a stormwater storage system are diverse. This is mainly because water is quite a sensitive product that almost all of the living things depend on. Therefore, strict codes of ethics must be placed to guide in the provision of safe water for diversity. Ethical issues revolve around the provision of the professional services and must be adhered to by the professionals like the design engineers and they include in this case: - Design engineers must conduct their work with a lot of duty to care, ‘…do no harm’ when contemplating stormwater drainage design.

In line with this, the engineers performing such work are expected ethically to perform the work through high standards of honesty and integrity given that the profession has the necessary impact on the quality of life of the people. Secondly, the services provided in the design of the stormwater drainage/storage system require the highest degrees of honesty, impartiality, fairness and equity. Above all, the project must be dedicated towards the protection of the health of the public, as well as their safety and welfare.

Hence, under the standards of professional behavior, the design engineers must exhibit the highest principles of ethical conduct (Dym & Little, 2000). Morality on the other hand requires adherence towards the laws that governs the design and construction of the stormwater storage systems. This requires that all the stakeholders of the project right from the engineers, the workers and the community abide by the law guiding the same (Whitbeck, 1998). This law in most cases is guided by the natural flow rule, which requires acceptance for the benefit of all by the parties affected incase of this project.6.4 Ethical Dilemmas and Justification of Proposed Solution Ethics in the handling of the design of the stormwater storage system requires that a high degree of ethics be upheld.

This is due to the sensitivity of water as a resource and the ethics is concerning creation of safety most so to the users of this resource. One of the interests comes with the interests of the interested parties like the political class who shelve individual interests. This may compromise the quality of the storage systems since the engineers may be compromised if not for anything then due to intimidation (Schrier & Gibson, 2011). The fact that the storage system designed is likely to serve a wider region also presents a dilemma.

The planners may be overwhelmed about the control of the resource in terms of who is bestowed the control. Is it the government or the community who have an express right of usage? Who would bear the costs of such a public utility and so forth? The justification for these is not guaranteed and the involved parties still need to fall back to the set ethical and moral frameworks. These frameworks would set laws, which can be amended from time to time ensuring that there is smooth functioning of the established resource.

In addition, honesty, equity and fairness must be upheld for the efficiency and effectiveness of the functioning and usage of the designed stormwater storage system (Whitbeck, 1998).ReferencesDym, C. L., & Little, P. (2000). Engineering design: a project-based introduction. New York: John Wiley.Schrier, K., & Gibson, D. (2011). Designing games for ethics models, techniques and frameworks. Hershey PA: Information Science Reference.Whitbeck, C. (1998). Ethics in engineering practice and research.

Cambridge, England: Cambridge University Press.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Design of Stormwater Drainage System Term Paper Example | Topics and Well Written Essays - 500 words”, n.d.)
Design of Stormwater Drainage System Term Paper Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/miscellaneous/1612769-design-of-stormwater-drainage-system
(Design of Stormwater Drainage System Term Paper Example | Topics and Well Written Essays - 500 Words)
Design of Stormwater Drainage System Term Paper Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/miscellaneous/1612769-design-of-stormwater-drainage-system.
“Design of Stormwater Drainage System Term Paper Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/miscellaneous/1612769-design-of-stormwater-drainage-system.
  • Cited: 1 times

CHECK THESE SAMPLES OF Design of Stormwater Drainage System

The Infrastructure System of Japan

This paper will tackle the assessment of the infrastructure system of Japan along four areas: highway maintenance, railway maintenance, drainage maintenance, and utilities and service distribution.... The scheme is anchored on a system of measurements based on indices.... Salient features of the road management system are performance plans, achievement reports and the Guidance for Road Administration Management (GRAM).... Meanwhile, to maximize the gains of the road administration management system as it is implemented in the countryside, the GRAM is prepared and disseminated....
11 Pages (2750 words) Essay

Storm Water Management

The conditions of the drainage system in the above mentioned countries are below average.... The concept of conventional stormwater drainage... There are limitations in conventional stormwater management system because it only focuses on transportation and reduction of peak flow.... The soil has a limited ability to absorb or soak water, so the water that is left on the surface after absorption is carried away by the slopes on roads into the drainage that is the sewers or directly… The water that is left on the surface is called surface runoff....
3 Pages (750 words) Assignment

Highway Engineering: The Tiverton-Wolverton Road Upgrade

Safety investments create a transport system that eradicates human error which costs life through the four parts of a Safe system; safe roads and road sides, safe speeds, safe vehicles, and safe road use.... The Tiverton- Wolverton Road Upgrade project is almost complete with few areas of landscaping remaining but to be completed in the rainy month of April....
5 Pages (1250 words) Assignment

The Procurement Method of ELS Works

The project was under design and build contract scheme.... Cost certainty is one of the advantages of design and builds the contract as it is a fixed price contract.... Thus design and build in fact is more expensive than a traditional contract.... As a procurement method, design and build carry with the combination of priorities.... If aesthetic quality is the highest priority for the client, he can appoint a design and build contractor for architectural merit....
10 Pages (2500 words) Research Proposal

Tthe Environmental Advantages on the Use of Green Roofs in Buildings in the UK

This coursework "Tthe Environmental Advantages on the Use of Green Roofs in Buildings in the UK " will provide an analysis of green roofs, to include the concepts and environmental benefits derived in installing green roofs on rooftops of buildings.... nbsp;… In conducting the research, information and data were taken from the literature on green roofs and green buildings which are said to be sprouting in urban centers and in many cities around the world....
6 Pages (1500 words) Coursework

The Building and Construction Industry in Melbourne

In the face of an ongoing debate on the level of adaptation, architectural practices have taken into account the projects of increased risks of extreme events resulting from high temperatures, huge stormwater, flooding, high solar radiation (Yohe, Andronova, Schlesinger 2004).... The idea of this paper "The Building and Construction Industry in Melbourne" emerged from the author's interest and fascination in how can we better design and build buildings in an adaptation to climate change and in response to the growing housing needs of a rapidly developing Melbourne....
8 Pages (2000 words) Research Proposal

Development and Adaption of Water Technologies in the Hills of Nepal

This makes it difficult to know the actual type of design of a water system that would be appropriate.... … The paper "Development and Adaption of Water Technologies in the Hills of Nepal" is a great example of a research proposal on environmental studies.... Table 1 and figure 1 give a summary of the variation of rainfall from station to station for =for various seasons....
11 Pages (2750 words) Research Proposal

Advancement of Storm Water Tunnels

dvancement of stormwater tunnelsThere have been several advancements in the stormwater tunnels.... However, the construction of tunnels is still under several studies since there is a need to upgrade the design of the tunnels according to the needs and time.... the other advancement is that the underground water is lowered b the use of the water well system.... This paper explores the stormwater tunneling technique.... ackground stormwater tunnelingIn the early days, underground tunnels were specifically for mining....
6 Pages (1500 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us