StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Nobody downloaded yet

Management of Bridge Constriction - Assignment Example

Cite this document
Summary
The paper "Management of Bridge Constriction" is a great example of an assignment on management.Why do this project? (What problem/opportunity has arisen? What value or goal are we addressing?) The project aims at constructing the bridge so that people can commute from one place to another which will benefit society…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.1% of users find it useful

Extract of sample "Management of Bridge Constriction"

Download file to see previous pages

The paper "Management of Bridge Constriction" is a great example of an assignment on management.

Why do this project? (What problem/opportunity has arisen? What value or goal are we addressing?) The project aims at constructing the bridge so that people can commute from one place to another which will benefit society. The goal or opportunity is to look towards constructing a bridge that has a beam at the ends and is suspended on carbon fibers.

Project Deliverables (What tangible product, service, document, etc. will be produced by this project? How will it address the purpose shown above?)

The project deliverables will be the bridge itself which can be used by the people for traveling and will help to save time

What benefits will result? (Show $ total if possible).

The benefit is difficult to measure in monetary terms as it will look towards providing services to the community

How will they be measured?

It will be measured by finding out the manner in which the society benefits

What constraints, boundaries, or limitations affect the scope of the project (e.g. time, budget, people)?

The project will be affected by changes in the price of materials, cost of labor, availability of manpower, requirements of pleasant weather condition to ensure construction, and the time span planned

Who are the main stakeholder groups (anyone affected by the project work and outcomes)?

The stakeholders are the society, employees, government bodies, the contracting agency, and all other people associated with the project

List key project objectives (should be SMART, and guide quality and results):

The objective is to deliver a bridge over Cleavland bay which will be of 1 kilometer and have a beam at the ends and will be suspended on cables which will make of carbon fibers

How will they be measured?

It will be measured by the amount of time the bridge holds before undergoing any further repairs

List key constraints (other projects that are inter-dependent or conflicting, legislation, deadlines, etc.):

The key constraints for the project are to complete it within the allocated time span of 2.5 years and within the allocated budget

Estimated start date: November 1, 2012

Estimated end date: April 31, 2014

Estimated FTE staff required: 1250 people in total

Estimated total project cost: $175000000

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Management of Bridge Constriction Assignment Example | Topics and Well Written Essays - 5500 words, n.d.)
Management of Bridge Constriction Assignment Example | Topics and Well Written Essays - 5500 words. https://studentshare.org/management/2079877-project-managemen-assignment
(Management of Bridge Constriction Assignment Example | Topics and Well Written Essays - 5500 Words)
Management of Bridge Constriction Assignment Example | Topics and Well Written Essays - 5500 Words. https://studentshare.org/management/2079877-project-managemen-assignment.
“Management of Bridge Constriction Assignment Example | Topics and Well Written Essays - 5500 Words”. https://studentshare.org/management/2079877-project-managemen-assignment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Management of Bridge Constriction

The Causes of Building Collapse

… The paper "The Causes of Building Collapse" is a wonderful example of a research proposal on engineering and construction.... The subject of the building collapse is selected for the assignment as the phenomenon is correlated with the economic losses depending on the size of the building, duration of the collapse process, and severity of the causing agent for the building collapse....
12 Pages (3000 words) Research Proposal

Loads and Forces on Buildings

Dynamic Load: These types of bridge loads cannot be accurately measured.... Finally, yet importantly is the materials used to build the bridge.... Types of Bridges Structural Type: In any bridge that is, constructed forces are eminent.... These forces that act against the bridge can be either, bending forces, shear forces, compression forces, tension forces, and or torsion forces.... These forces are always distributed throughout the structure (bridge)....
6 Pages (1500 words)

Queensland Prefabricated - Marketing Strategies

The range of products offered includes roof trusses, roof trees, columns, beams, panel walls, foundations sockets, and bridge girders.... The team ranges from senior management to the leadership below that, engineers, sales personnel, among others.... … The paper "Queensland Prefabricated - Marketing Strategies" is a good example of a marketing case study....
13 Pages (3250 words) Case Study

Hangzhou Bay Bridge Project Management

The needs and expectations of the stakeholders should be taken into consideration to ensure they participate fully in the management of the project to achieve the desired objectives (Kerzner 2003).... … The paper "Hangzhou Bay bridge Project Management " is an outstanding example of a management case study.... nbsp;This project analysis report discussed the various concepts in relation to Hangzhou Bay bridge which was the project completed successfully....
6 Pages (1500 words) Case Study

Analysis of the Failure of the West Gate Bridge

… The paper "Analysis of the Failure of the West Gate bridge " is a perfect example of a business case study.... This report analyses the Failure of the West Gate bridge and the manner in which the project was planned and performed.... The paper "Analysis of the Failure of the West Gate bridge " is a perfect example of a business case study.... This report analyses the Failure of the West Gate bridge and the manner in which the project was planned and performed....
6 Pages (1500 words) Case Study

Cost-Benefit Analysis of the New Bridge

… The paper "Cost-Benefit Analysis of the New bridge " is a perfect example of a micro and macroeconomic case study.... nbsp;The construction of a bridge should be done after carrying out a cost-benefit analysis of the subject of a project.... The paper "Cost-Benefit Analysis of the New bridge " is a perfect example of a micro and macroeconomic case study.... nbsp;The construction of a bridge should be done after carrying out a cost-benefit analysis of the subject of a project....
6 Pages (1500 words) Case Study

Upper Molonglo Rail Trail for Bungendore Progress Association

There is also a bridge across the Molonglo River meaning that there will be no need for construction of another bridge.... Other geographical features along the route also include the Lake George farmland plains, the Tallaganda region, the Foxlow bridge and the old railway features....
11 Pages (2750 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us