This paper "Cost Management for Computer Sciences and Information Technology Projects" sums up various ways of ensuring the costs of a project are manageable. This paper goes to an extent to even evaluate the effects of project duration on the cost demands of a project…
Download full paperFile format: .doc, available for editing
Extract of sample "Cost Management for Computer Sciences and Information Technology Projects"
Project Cost Management Project Cost Management This paper is about cost management for Computer sciences and Information technology projects. The paper sums up the various ways of ensuring the costs of a project are manageable and discussions are informed by Verzuh (2008). Managing the costs of a project is an activity that needs to be conducted on a regular basis and in all phases of the project. According to Verzuh (2008), setting schedules with milestones, ensuring accuracy in cost and schedule estimation and regularly monitoring and managing the balance between cost, quality and schedule of a project ensures that the project remains to be manageable and cost effective. This paper goes to an extent to even evaluate the effects of project duration on the cost demands of a project. This paper also examines Institute (2013), on how to effectively manage the costs of a project. There needs to be guidelines and plans for managing cost and quality of the project. Planning ensures that cost and quality control measures are emphasized in all phases of the project.
Realistic Scheduling
Realistic scheduling of duties has a direct relationship with managing the cost of a project. Scheduling ensures that resources are duly utilized and reduces wastages of material and time. Steps of scheduling duties should be carried out with the view of not only ensuring the project is a success, but also to ensure the costs of the project are manageable.
Identify Task Relationships
When scheduling duties, related tasks need to be carried out in a sequence that ensures less time is spent to achieve the final output. According to Verzuh (2008), where tasks are not related to each other, they can be done subsequently to reduce the time of production.
Work package estimation
For each set of work to be carried, coming up with a schedule and cost estimates is crucial in ensuring that needed resources are made available in good time, as well as to assess the time a project will take. To manage costs effectively, there needs to be a breakdown of the amount of labor needed to perform various duties, materials needed for the completion of a project, equipments and the fixed expenses required to take the project to completion to (Verzuh, 2008).
Calculate work schedule
According to Verzuh (2008), having the schedule of work to be carried out ensures that resources are available when needed. The schedule is very important because items that urgently need materials can be given priority over the ones that need materials later in the project.
Assign and level resources
Time, people, materials and equipments need to be utilized in a manner that will maximize the output. To better do this, project resources need to be assigned where they will have much impact in the overall project. According to Verzuh (2008), doing this ensures that there is stable supply of needed resources at every given time of the project cycle. Areas that can be automated should be marked so as to reduce labor and time needs.
Estimating Accurately
The duration and costs of a project need to be ascertained beforehand so as to enable planning for a project. According to Verzuh (2008), information systems managers and developers of software fail in this field of estimating project cost and duration. To get detailed and accurate estimates, one should consult with people experienced in the relevant field, people who will perform the task and those who understand the importance of the estimates. Established estimating techniques should be used in order to estimate software development projects effectively.
Phased estimating
This technique sub-divides the whole project into phases. Each phase is considered a project and there is need to estimate the cost and schedule of each, as well as adhering to the estimates (Verzuh, 2008).
Apportioning
This technique factors in the total project estimates, which is then divided to the phases of the project (Verzuh, 2008)
Parametric estimates
Here, the whole project is divided into small basic units. The units then act as a basis for calculating the estimates of the whole project
Bottom-up estimating
This technique factors in the estimates of the step by step phases of achieving the project goal. The estimates of these steps are combined to come up with the overall estimate.
Balancing the Trade-off among Cost, Schedule, and Quality
This ensures consistency of the phases of the project and that the project adheres to estimated costs and schedules so as to keep the project and the costs in check. Balancing can take place in either of three phases.
Project Phase
Re-estimate the Project
This involves reviewing the estimates and analyzing them so as to have reasonable and workable cost estimates.
Re-assign tasks to utilize float of schedule
Here, the tasks that are most demanding or are behind schedule are re-assigned with additional personnel so as to be within schedule and reduce chances of cost increase.
Add staff to the Project
This aims at reducing the time taken to complete a project. Projects that take short time end up using lesser time than long projects.
Use of Internal Experts
The use of internal experts ensures quality is achieved without additional expenses and wastage of resources and time.
Use of external Experts
Where there is lack of experts in the project, acquiring experts will ensure maximum productivity and cost efficiency of the project.
Outsourcing
This involves sharing responsibility of a project to another firm. It saves the cost of employing experts with skills needed to perform only a portion of the project.
Schedule Crash
A crash program reduces the time taken to complete a project and hence keeping the costs at bay.
Overtime
Working overtime ensures that a lot more can be accomplished in a day. It reduces the fixed costs like rent chares needed to accomplish a project.
Business Phase
Product Scope reduction
Reducing the requirements of the end product will have direct impact on time to get the final product and the cost requirements.
Fixed-Phase Scheduling
Setting a fixed date for completion of the project ensures that the project is completed within the cost and time schedule from the estimates.
Fast-Tracking
Performing different task at the same time ensures that the time and costs of the project are manageable.
Phased Product Delivery
Projects can be subdivided into small useful parts. These parts can generate revenue needed to take the project to maturity.
Do It Twice—Quickly and Correctly
This involves performing a project in a harried manner up to completion and then getting back to perfect the project. This ensures that only useful staff remains in place to improve the project, thus reducing the costs.
Profit Requirements change
Keeping the profit margins low will ensure that the project keeps the costs low so as to be competitive in the industry. Such a project will regulate expenses and ensure they are manageable.
Enterprise Phase
This phase ensures that only projects that are manageable and cost effective are undertaken. Here, the available resources are considered when choosing a project to undertake.
Project Cost management
To ensure the costs of a computer science and information technology project are at bay, policies and procedures need to be established, planning documented and management and cost control implemented (Institute, 2013). Much attention needs to be directed towards determining the budget, estimating costs, assets of organizational process, the environmental factors of the enterprise and planning for cost management.
Project Quality Management
The activities and procedures taken to ensure quality in a project enable the project to achieve its main objectives. The project can achieve more with less cost implications through constant and regular improvements. According to Institute (2013), projects need to plan for quality management, carry out quality assurance through evaluating quality requirements together with the output of the project and controlling the quality through documentation and monitoring of the processes and procedures involved in managing quality.
References
Verzuh, E. (2008). The FAST FORWARD MBA in Project Management. Hoboken, New Jersey. : John Wiley & Sons, Inc.
Institute, P. M. (2013). Cover image for A Guide to the Project Management Body of Knowledge, Fifth Edition. Newtown Square, Pennsylvania: Project Management Institute, Inc.
Read
More
Share:
CHECK THESE SAMPLES OF Cost Management for Computer Sciences and Information Technology Projects
The discussion seeks to answer the question: Do quality control methods find use in information technology projects?... The value of quality is significant in information technology projects.... This research paper hypothesis the use of quality control methods as vital in information technology projects to provide quality control functions, which streamline the delivery of quality software not only meet the customer expectation, but also ensure firms meet time and budgetary constraints....
This research is being carried out to identify the significance of computer science and information technology in the HR department; to study of about the use and development of the Information technology and computer science in the organization.... So, the use of Computer science and information technology in the organizations department helps to solve the problems, as well as to improve the better communication skill of the various departments.... Here the research proposal talks about Computer Science and information technology in HR department of an organization....
The scope statement normally gives details of the project and it also describes the major objectives of the projects.... u ASSESSMENT information Bachelor of Applied Management BSMAN 3190 ASSIGNMENT DETAILS (title) Interim Project Report LECTURER / Vicki Bethell Campus / Provider Kangan Institute DUE DATE 21/4/2013 SUBMITTED ON Interim Project Report The interim project report gives an analysis of how the project is proceeding before the final completion of the project and also before the final report is drawn (Wakelyn 33)....
portfolio management system entails the use of scoring model systems in rating projects whereby a list of criteria is developed whereby projects are rated on each criterion to yield attractiveness scores for each project and hence projects can be rated in relation to the attractiveness scores.... Scoring models are very important and they are a source of data which is utilized in meetings whereby project attractiveness is compared to cut off criterion, thereby in portfolio review stage the outputs used in ranking the projects....
information technology is the computers and other telecommunication application tools for storage, transmission, retrieval and manipulation of data.... information technology relies on other industries like the computer hardware and software, electronic and other related computer services.
... n the definition of information technology, three categories are always considered to explain it; these categories information technologyinformation technology Introduction information technology is the computers and other telecommunication application tools for storage, transmission, retrieval and manipulation of data....
This case study "computer sciences and information technology" focuses on the case of Teri Takai, the Director of Supply Chain System of Dell Computer who has provided an effective recommendation to the senior executives of Ford regarding the implementation of information technology.... According to the case scenario, Teri Takai, the Director of Supply Chain System of Dell Computer has provided effective recommendations to the senior executives of Ford regarding the implementation of emerging information technology and ideas from other high-tech industries (Case 2-3, n....
The paper "Planning Stage in computer sciences and information technology" explains that before initiation of an IT project it is great to conduct research of the context of the project in terms of will encompass and time for its implementation and collecting data pertaining to project conducting.... The management of the Systems Upgrade project for Clyde Valley Financial Solutions will two major milestones i.... installation of the Windows Server 2008R2 Microsoft and installation of the management Console (MMC)....
This report "How information technology can be Applied to Electrical Engineering" investigates information tools and resources used in Electrical Engineering.... The report starts with a brief introduction to information technology, then an overview of various components used.... Any technology in place has 3 stages (Schweber and William, 2008).... The whole concept of IT revolves around obtaining, processing, and storage of information by the use of computers and communication technology....
13 Pages(3250 words)Report
sponsored ads
Save Your Time for More Important Things
Let us write or edit the article on your topic
"Cost Management for Computer Sciences and Information Technology Projects"
with a personal 20% discount.