StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Information System and the Designing of the HT Enabler - Book Report/Review Example

Summary
This essay analyzes that the designing of the HT enabler is likely to add to the final charges of the project. Also, the total project cost is vital because IT plants are overloaded by a lot of project requests by universities and research departments…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.5% of users find it useful
Information System and the Designing of the HT Enabler
Read Text Preview

Extract of sample "Information System and the Designing of the HT Enabler"

Information System and the Designing of the HT Enabler 1. Project Cost This refers to the total assumption of the charges that was not included in the original budget of the final HT project. The designing of the HT enabler is likely to add to the final charges of the project. The total project cost is vital because IT plants are overloaded by a lot of project requests by universities and research departments. Most of these requests are projected at refining services to research and university constituents or restructuring business procedures. Each of these requests ought to be properly prioritized, and projects using core capabilities or have the highest perceptibility to the institutions tend to assume priority (Paul, 2003). 2. Business Cost This entails a more informative quantification of all the business charge and all the business risks that are linked with an IT system outage that was not carried out. It looks normal that the organization is likely to incur essential projects around the costs. Risks ought to be mitigated in terms of costs. Various IT firms fail to manage threats of one kind or another, and these include such as physical security, suitable inner financial controls, and security of data. Each of these is dominant to upholding an institution’s status and, therefore, its aptitude to invite future projects(Paul, 2003). 3. Isolated The hot tap system was not isolated as it was dependent on other technological systems that were professionally designed to make sure that the system was effective. These are techniques that can be equally understood and appreciated by Business Unions and Information Technology specialists, Project Executives, Business Directors, Business Forecasters and IT Professionals as they all have a goal of decreasing business risks, providing a high-quality end product, and averting schedule and charge plunders when executing new or advanced business system requests. Procedures that will eradicate the requisite to shut down the construction business procedures while altering to the new requests, these are techniques that can be applied to the next project and thus reducing the risks related to the Go Live stage of system enactment. 4. Complex Interfaces As a result of the complicated interfaces, it would be hard to shut down this system as this would require precise channels of opportunities, a good instance of this situation is whereby a person would walk up the stairs during the nighttime with a glass that is full with water and only to trip on the last step and lose the glass, the water or even end up hurting yourself. This event can also occur during the daytime. This is similar to what goes on in most major t system implementation projects that do not have complex interfaces (Paul, 2003). 5. Business Schedule Requirements There existed no business schedule requirements for the Hot Tap Strategy; this strategy has no reference to a precise corporation or industry, as the concepts that steer it to success in the projects are not a replication of any exact organization’s system progress strategy. The case study instances are general business circumstances that are applicable to almost any mid-size to big business. 6. User The user of this system had the chance of confirming access and practice to real life circumstances in a complete production surrounding before needing the output to be applied for the production use. This implies that cannot leave everything to chance, testing this system in a full production mode is suitable. Creating the HT enabler is seen as adding charges to the projects; on the other hand, a shutdown is viewed to add fewer costs to the project. But in the real life situation, the shutdown ought to add extra charges to the organization (Paul, 2003). 7. Confirmation of Application All the new and the old production situations from the past and the present periods can be confirmed before the commitment to the new system. Thus, testing and application of the conversion of data in a traditional manner is carried out on a representative ground. The complete set of potential business situation cannot be guaranteed without the use of the full production files and processes. The hot tap strategy in this presentation allows the project to change and test a full production set that exists in a fully final production environment. 8. Confirm Version The process of conversion was well confirmed prior of Go Live. This permits several short conversions practices that confirm how accurate the conversion process is. There are many advantages of avoiding system outage during Go Live. 9. Auditable Both methods can information was secure and accurate, Extending past business design and development of corporate systems, the experience of this system comprises of an extensive Internal Audit evaluations of other project executives’ expansions. The aspirations are that the Hot Tap Strategies labeled in this project may be leveraged to develop the audit experiences while at the same time-saving putting into practice time and budget cost (Paul, 2003). 10. Re-Start Production There is not risk involved since a production shutdown is never experienced. The process of shutdown is only experienced in situations whereby the project or business managers do not have a common understanding of how to implement systems. This is something that they ought to agree on before putting on the practice. 11. Back-Out Strategies The backs out strategies were not necessary for the system function in a full manner, and this was illustrated in production sector previous to production application of the output. The hot tap strategy necessitates an advanced level of exact communication to make sure that all the responsibilities are coordinated in a professional way (Paul, 2003). References Paul, M. (2003).Kick-Butt Start Up Strategies: Assurance For On Time Risk-Free Delivery Of Your Business System. Oxford: Oxford University Press Read More

CHECK THESE SAMPLES OF Information System and the Designing of the HT Enabler

Individual reflection on the module of system analysis

It also helped in highlighting the objectives of the system and the extent to which it can support user needs and requirements (Diwedi, Wade & Schneberger, 2011).... The paper provides an in-depth evaluation and assessment of the different dimensions of the proposed system design, its applications, and data flow in order to develop a streamlined software application system.... The methodology used for this purpose is the Unified Modeling Language (UML) that is a graphical language used to construct and document the system design requirements....
18 Pages (4500 words) Essay

Business Information and Demographical Data at Club IT

The re-designing of the website will be the first step towards a complete transformation to a corporate computing environment for the club.... Likewise, two approaches for designing systems can be used in aggregation with one other.... Moreover, if strategically aligned with the business strategy, the system can also address the future expansion and workload management of day to day operations of the Club.... There are many options owners can consider to improve business, however, implementing Wireless networks and order management system deemed to be the right option....
7 Pages (1750 words) Assignment

Management Information Systems

The authors usually recommend nine major steps so as to design an information system architecture that is effective.... The major positive impact is that information system helps in saving time.... The other major positive impact is that information system enhances the level of accuracy in data processing.... The information system provides a scope through which large volumes of data can be stored in small space in the electronic devices which can be easily accessed as and when required. ...
6 Pages (1500 words) Assignment

Computer Sciences and Information Technology

The deployment of advanced information and technological aspects in the supply chain model is further observed to be an essential decision for an organization in terms of managing inventory system, material handling, warehouse management, transportation system and operations (Zigiaris, 2000). ... It is a key enabler that facilitates the organizations to gain their capability of controlling the overall functions of the supply chain operations (Booz Allen & Hamilton Inc, 2012)....
7 Pages (1750 words) Case Study

Planning Stage in Computer Sciences and Information Technology

This is because the roaming profiles would be stored on the companys system and the employees would be able to use their customized settings on any computer irrespective of its location ... The roaming profiles will be stored on the company's system and the employees will be able to use their customized settings on any computer irrespective of its location thus enabling the employees to work in a to work faster in an improved and enhanced controlled enterprise context....
14 Pages (3500 words) Research Proposal

Benefits of IT Strategies to a Business

During the designing of IT/IS strategies the future growth of an organization is visualized by planners and the anticipated challenges are addressed in the design and thus management of future growth made easy. ... It is used to develop an information system in attaining a future vision of a firm.... An IT strategy is a plan, which is used to develop information system in attaining a future vision of a firm toward achieving the general business strategy....
12 Pages (3000 words) Assignment

The Architectural Engineer Role In Designing And Applying Security Systems

Due to this aspect, security requirements specific to a system and that protect essential facilities, assets or services are in many cases neglected.... he architecture engineers also play a critical role in capturing the relationship between a security system and its environment (Brauch, 2007).... This paper ''The Architectural Engineer Role In designing And Applying Security Systems'' explores the role of an architectural engineer in designing and applying security systems in their design....
10 Pages (2500 words) Report

Ethical and Social Issues in Information Systems

Social issues mainly relate to the human factor regarding utilization and development of information system and information systems planning.... Despite the increased use of information systems, there are some managers who are still unable to determine IS business requirements since they have little or no information system knowledge and its benefits.... In an information system society every person should have intellectual skills to handle information, have access to the information technologies that convey or process information, they could be TVs, laptops, radios or libraries finally one need to have access to the information itself....
9 Pages (2250 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us