StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Project Management Unit 7 - Assignment - Essay Example

Cite this document
Summary
The vendor will also require informing them when he shall require each of the machines. The vendor shall communicate these requirements with…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.7% of users find it useful
Project Management Unit 7 - Assignment
Read Text Preview

Extract of sample "Project Management Unit 7 - Assignment"

COMPUTER SCIENCES AND INFORMATION TECHNOLOGY Project Management Unit 7 – Assignment The builders of the Kluge in SacramentoThey require the specifications for the machines, such as CPUs, processors, drives and cabling that the vendor will require them to build. The vendor will also require informing them when he shall require each of the machines. The vendor shall communicate these requirements with the builders through the use of the purchase order, which may be through ERP system or hardcopies.

The vendorHe will require information on the specification of the machines from the engineers. He will also require weekly updates from the builders in Sacramento on the progress of his order. In the transportation stage, he will need information on the status of the transportation of the machines. The freighters will give this information. They will use phones and emails to communicate between them. The vendor will also communicate to the company on his progress on acquiring the machines the company requires for the installation of the system.

This will be done by use of emails and personal communication with the head of the installation project with back up documents in hard copy.Engineers The engineers will need to keep in touch with the technicians in London and Baumholder. They will require information on the progress on the installations the technicians make on an hourly basis. The engineers and technicians will use teleconferencing to communicate. This will enable the engineers to communicate on small details that would not be possible with other methods of communication.

They will also require the feedbacks from the testers on a daily basis during the testing stage. The engineers will provide questioners to the testers to complete. This will be done online through the use of electronic mails and phone calls.The engineers should also report on the progress of the installments to the company management through presentations and reports. They should make updates to the implementation team on a weekly basis to give the company enough time to address any emerging issue.

The engineers should make the updates in hardcopy as well as in person with the head of the company’s department in charge.TechniciansThey will require instructions from the engineers. The technicians will also provide a detailed report on the system they assemble. The report should include all the information necessary to addressing future breakdowns or changes in the system. The report should be in hard copy, and they should deliver it to the company’s data department for storage.Purchase departmentThe department shall ensure that the purchases the vendor makes are in line with the specifications the engineers give.

They will communicate with the vendor through letters and face to face. They will also collect receipts and confirm delivery of machines the company purchases from the vendor.Data storage departmentThis department shall be responsible for storage of all the project information for future reference. They will be responsible for collecting all formal communications made between all the stakeholders. They shall store all this information in softcopy for quick retrieval and hardcopies for back up.

Conflict solution mechanismThe project implementation team, which I head, shall address any disputes that arise because of miscommunication or failure to communicate. It shall also make any changes to the existing communication channels in use. The stakeholders shall use teleconferencing in any meeting that requires all of them to participate.GlossaryFreightersThese are the people responsible for the transportation of good from one place to another.TeleconferencingThis is communication of people from different parts of the world through the use of a closed circuit TV.

StakeholdersThese are people with an interest in something, in this case, the installation project.VendorThis a company or person offering items for sale.ERP SystemsAn ICT system that supports a business organization’s processes such as purchases or sales. ReferencesAusgabe, D. (2006). A Guide to the Project Management Body of Knowledge (3rd ed.). San Diego: Project Management Inst.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project Management Unit 7 - Assignment Essay Example | Topics and Well Written Essays - 500 words”, n.d.)
Project Management Unit 7 - Assignment Essay Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/information-technology/1584080-project-management-unit-7-assignment
(Project Management Unit 7 - Assignment Essay Example | Topics and Well Written Essays - 500 Words)
Project Management Unit 7 - Assignment Essay Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/information-technology/1584080-project-management-unit-7-assignment.
“Project Management Unit 7 - Assignment Essay Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/information-technology/1584080-project-management-unit-7-assignment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Management Unit 7 - Assignment

Managing Financial Performance and Managerial Finance

The main objective of the assignment "Managing Financial Performance and Managerial Finance" is to demonstrate the process of conducting an analysis of the financial statements of a company.... nbsp;Two forms of analysis have been used in this study: vertical and horizontal analyses and ratio analysis....
8 Pages (2000 words) Assignment

Management Guidelines and Information Security for IT Projects

The document also summarises the theories and concepts learned in the unit, how these theories influenced my work, example/case study of a successful IT project, and its comparison with the developed database.... The paper "management Guidelines and Information Security for IT Projects" evaluate the developed database; therefore, keeping in view the topic, I have not only compared the database with the requirements of the agency as well as best practices and features of a high-quality database....
6 Pages (1500 words) Assignment

The Aspects of Project Selection Procedure at Monterey Bay Aquarium

They are not aware of the profit-making or the marketing objectives of the management.... In the selection of the products or services that put into sustainable profitability, importance should be given in altering the business spotlight of portfolio management from financial metrics to client value.... Thus, in this case, study, also the senior level management of each SBU is required to focus on customer satisfaction so as to attract more customers and generate more sales revenue....
8 Pages (2000 words) Assignment

Activity Based Accounting and Managerial Accounting

otal unit produced in a month: 300 + 503 + 100 = 903 unitsManufacturing overhead per unit: 50,000 / 903 = $554There are three activities in manufacturing: motor assembly, harness fitting, and final assembly.... Based on this assumption the following is deducted:Model Labor hour Labor hour Labor hour Total unit Motor assembly Harness fitting Final assembly LHFL 20 9 6 35 40TL 12 4 4 20 150HE 18 8 4 30 30Labor cost = $35 * 4 = $ 140 per hourModel Labor hour / unit Labor cost / unit ($)FL 35/40 = 0....
3 Pages (750 words) Assignment

Project Teamworker

Project Teamworker is designed to create a web-based portal that allows students, tutors, supervisors and unit coordinators that ability to monitor team projects effectively as they progress.... Accordingly, the web-based platform would utilise different levels of access as a means… This project has the added potential of assisting students in communicating with their other members in their team; sharing files, and assisting tutors, supervisors & unit co-ordinator in checking progress of these teams and providing oversight Similarly, other team work based units can implement this system to control the team work process....
6 Pages (1500 words) Assignment

Finance - Healthy Hearts Cardiff

This paper "Finance - Healthy Hearts Cardiff" focuses on the fact that in order to understand where Healthy Hearts (Cardiff) stands when compared to the most profitable club, it is essential to critically analyze the ratios and the underlying causes to pinpoint the strengths and weakness.... nbsp;… The profitability of Healthy Hearts is 24 % whereas that of the most profitable club is 36 %....
10 Pages (2500 words) Assignment

Training Packages and Packaging Units

Fast, this will show out that learning resources, assessment activities, and learning activities are aligned properly with the expected outcome of learning and the criteria of performance for a specific unit of study.... The last performance requirement for this unit is to give out training specifications in the licensing, and regulatory requirements....
10 Pages (2500 words) Assignment

What Is the Earned Value Analysis

(ACWP) This important question is answered with the ACWP, or Actual Cost of Work Performed  WP-1 Actual Current Output = 5000 Budgeted unit Cost = £25/widget BCWP = 5000 widgets x £25/widget budgeted = 125000             ACWP: What was the actual cost of the work that was completed?... Actual Current Output = 5000 Actual unit Cost = £25/widget ACWP = 150 widgets x $.... The author of this paper “What Is the Earned Value Analysis” investigates and presents three fundamental metrics of EVA, and the three basic measures needed to perform Earned Value Analysis on a project are based on cost estimates and actual costs....
10 Pages (2500 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us