Institution Tutor Bolton Thermal Recovery Facility: Case Study Course/Number Date Department From: the consultant, Bolton Thermal Recovery Facility To: the managing director of Bolton Thermal Recovery Facility Date: Re: legal liabilities of operating Bolton Thermal Recovery Facility and the necessary measures to be taken to ensure compliance with relevant laws Introduction The Thermal Recovery Facility (TRF) is managed and operated under the contract that was signed between the Greater Manchester Waste Disposal Authority (GMWDA) and Viridor Laing (Greater Manchester) Ltd., in order to continue creating energy sufficient to power 7,000 homes…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER93.6% of users find it useful
Bolton Thermal Recovery Facility Case Study
Read TextPreview

Extract of sample "Bolton Thermal Recovery Facility Case Study"

Download file to see previous pages The waste material in itself is a mixture of trade, commercial and domestic wastes, and items that have been confiscated from customs and police departments. Also, the facilities and equipment that are fit and used in Bolton Thermal Recovery Facility heighten the need to consider the legal implications of BTRF. This state above especially due to the fact that by the magnitude of the equipment and facilities that are found in BTRF directly and readily warrants the need to factor environmental and economic implications in BTRF’s existence and operations. Among these facilities, materials and equipment are: an incinerator that has the capacity to burn municipal waste at about 16 tonnes per hour; the waste types that are collected and transported to the site; a large and deep reception pit; supplementary oil fired burners which ensure that temperature does not fall below 8500 C at all times; heat recovery boiler; a gas stream; filters; and international catering wastes. The BTFR has also had total operational hours that run up to 6,793. This means that Bolton Thermal Recovery Facility is a busy site which must be guided by proper safety regulations which are founded upon environmental, economic and legal concerns. Because of this, the need to consider or craft policies that define legal, economic and environmental concerns of a plant as large as the Bolton Thermal Recovery Facility is paramount. As a consultant, it is therefore necessary to divulge details on legal liabilities that may arise from the environmental impacts of operating Bolton Thermal Recovery Facility and the necessary measures that need to be taken to ensure compliance with relevant consents. 1. The Policy, Environmental and Economic Drivers for the Development and Operation of the Facility The economic drivers for the development and operation of Bolton Thermal Recovery Facility are far reaching and should thus be seriously taken into consideration. For one, BTRF is run by Europe’s largest public waste contract which is the Greater Manchester deal, which in turn costs 3.8 pounds. BTRF also deals with an array of numerous materials and energy recovery facilities, as previously mentioned. The fact that BTRF also has to combine RDF production processes and MBT-AD technological processes further stresses the magnitude of BTRF’s economic significance. Bedeyore (2010) points out that it is also important to consider the fact that the economic significance of BTRF dares back to 2009 when it was signed as a landmark agreement, to bring about an international waste management industry. The bid to help divert 75% of wastes from landfills in the Greater Manchester Waste Disposal Authority (GMWDA) led to the signing of Recycling and waste Management Contract with Viridor Laing Greater Manchester Limited. Following this, this contract houses over 30 facilities such as Material Recovery Facilities (MRF), transfer stations, Anaerobic Digestion (AD) plants, composting facilities and thermal recovery Waste to Energy (WTE) facilities. All these facilities have been refurbished or built afresh. That BTFR is ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Bolton Thermal Recovery Facility Case Study Essay - 1”, n.d.)
Bolton Thermal Recovery Facility Case Study Essay - 1. Retrieved from https://studentshare.org/environmental-studies/1483744-bolton-thermal-recovery-facility-case-study
(Bolton Thermal Recovery Facility Case Study Essay - 1)
Bolton Thermal Recovery Facility Case Study Essay - 1. https://studentshare.org/environmental-studies/1483744-bolton-thermal-recovery-facility-case-study.
“Bolton Thermal Recovery Facility Case Study Essay - 1”, n.d. https://studentshare.org/environmental-studies/1483744-bolton-thermal-recovery-facility-case-study.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document

CHECK THESE SAMPLES OF Bolton Thermal Recovery Facility Case Study

HLS-Response and Recovery

...?HLS-Response and Recovery After the events of September 11, many organizations have been forced to reevaluate their preparedness for certain events (Maniscalso and Christen, 2002). Every organization needs to have effective mechanisms to deal with emergency response and recovery. The Federal Emergency Management Agency (FEMA) defines an emergency as “any unplanned event that can cause deaths or significant injuries to employees, customers or the public” Healthy Child (2011 par 1). This event can cause a business to shut down, disrupt normal operations, cause physical damage and may even affect the business facility’s finances and public image. There are numerous events that can cause...
10 Pages(2500 words)Case Study

Disaster Response & Recovery

...? Disaster Response & Recovery Inserts His/Her Inserts Grade Inserts 11 September Disaster Response & Recovery Disaster response and recovery is must be a combined effort to be more successful. The research focuses on the medical response to disaster. The research delves in the police response to each crisis. The research focuses on the fire department’s role in disaster alleviation, the combined efforts of the community, government, private sector, and other concerned parties will reduce disaster damages on property and persons. In terms of the role of the federal, state, and local agencies in implementing the main parts of the United States National Response Plan during a disaster response is grounded on preparedness, response... , and...
5 Pages(1250 words)Case Study

Disaster Response & Recovery

..., airports and other facilities where large people gather, as well as industrial enterprises, such as food, computer, electricity generating stations, oil refineries, and nuclear fuel storage facilities (Kumarl, 2012). In particular, disaster situations in HazMat facilities should be responded by personnel especially trained for it. In this regard, HazMats should be advised to organize a seminar for employees to prepare them to deal with these chemicals. The security systems for these facilities should include organizational measures, which provide plans for the personnel’s and visitors’ regular and emergency situation activities. Training exercises and courses should...
4 Pages(1000 words)Case Study

Incident Response, Business Continuity and Disaster Recovery Plans

...on the practical planning that provides important services as well as significant products during disruption. There are the some points that are included in the Business Continuity Plans for example, in order to deliver significant services and products several plans, procedures and provisions must be made to make sure continuous delivery of products allowing the organizations to improve protect their assets, data and other facilities. In addition, it is also compulsory to identify assets that may not limited to employees, information, hardware/network devices, financials, legal counsel, security and locations for facilitating BCP. The BCP increases the image of an organization among the employees, shareholders and...
21 Pages(5250 words)Case Study

Feed Resources Recovery

... Case Study, Feed Resources Recovery Case Summary The case is representation of Shane’s innovative investment plan that aims at developing a mobile aerobic digester plant. Although Shane is a qualified psychologist, he is an entrepreneur at heart and intends to engage his mind in identifying problems in the society and building business opportunities out of them. As traverses various employment sectors, he gains experience that shapes his entrepreneur path. When he was employed in Angstrom Microsystems he realized that competition is an influential market force in a business environment. After Microsystems increased its profits from $500, 000 to $15 million it was threatened by competition and lost its economic stability. He moved... . The...
4 Pages(1000 words)Case Study

Naval Hospital Guam Facility

...Assignment: Introduction to Quality Assurance Session Long Project Health Care Facility: Naval Hospital Guam Facility of Facility: ThisU.S. Naval Hospital is located on a 47-acre property in Agana heights, Guam. As primary care provider for the members of the U.S. military and their families, the hospital admits about 2000 patients, delivers on average 300 babies and handles approximately 107,000 outpatients in the emergency room annually. Health care for family members is also available at the COMNAVMARIANAS clinics. The range of medical services offered at the facility includes "family practice, OB-GYN, pediatrics, general surgery, anesthesia, internal medicine, psychiatry, psychology, occupational health and preventive medicine... on this...
3 Pages(750 words)Case Study

Disaster Response & Recovery

...Disaster Response & Recovery Plan of the of the Disaster Response & Recovery Plan Introduction In the present era, the USA and its citizens need to be well prepared for any untoward incident, from a terrorist attack to a weather related catastrophe. We have just celebrated the 10th anniversary of 9/11 and both Presidents Bush and Obama reiterated that America should stand united in the face of all possible manmade and natural calamities that threaten to undermine our national spirit and unity. This paper tackles a situation in which communications are down following an undesirable incident that has occurred, and asks us to respond to this scenario in conducting rescue and recovery efforts following this incident. Discussion... For the...
2 Pages(500 words)Case Study

The Logistics of Product Recovery (EndofLife)

...Logistics of Product Recovery Contents Contents 2 Introduction 3 Scope 4 OEM Takeback 4 Convenient Collection 5 Conclusion 7 References 8 Introduction The United States of America, European Union and provinces in Canada have been rapidly adopting the cause ocf EPR or Extended Producer Responsibility and more focus being given to e-waste. In the case of USA, the very foundation of EPR has been the refunds of beverage containers that have been prevalent for years now. The case for EPR into non beverage items is catching up (Western Sydney Waste Board, n.d.). Legislation for EPR of products that are harmful to the environment like batteries and electronic goods has been enacted way back 2004 in the USA. However, these laws...
5 Pages(1250 words)Case Study

Facility location strategies

...Business: Case Study Decision Support Affiliation Facility location refers to the process of identifying the bestlocation in geographic terms that best suits a location of a facility (Farahani, 2009). There are many facility location strategies; however, all the methods that are used have one main objective; to find a central place to locate a facility. Facility location in a central place does not mean it should be located centrally literally. It means locating it in a place, which gives access to all the customers with minimum costs. Sometimes located a facility in a single area with many customers may lock out other customers due to...
3 Pages(750 words)Case Study

Disaster Recovery Information

As long as the management’s input is required, their perceptions and expectations must be elicited and their commitment to the process of CSRIT must be acquired to sustain and prolong the operations of CSRIT. Resolve the CSRIT progress strategic plan: The project management and administrative issues such as specific timeframes, project group and presentation of the project group stakeholders, and communication to the management and project team should be addressed when giving thought on how to manage the progress of the CSRIT. Acquire relevant information: The necessary information required to carry out such task can be sought from the stakeholders or business manager and representatives from IT, human resource, public relat...
3 Pages(750 words)Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Let us find you another Essay on topic Bolton Thermal Recovery Facility Case Study for FREE!

Contact Us