Cost Control Is Very Important in the Construction Industry - Essay Example

Cite this document
Summary
The paper "Cost Control Is Very Important in the Construction Industry" states that the calculation of project overheads is very crucial in cost control. Overheads are referred to the cost of maintaining the site office, the marketing expenses, and the expenditure of the head office…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.9% of users find it useful
Cost Control Is Very Important in the Construction Industry
Read Text Preview

Extract of sample "Cost Control Is Very Important in the Construction Industry"

Construction cost control consists basically of monitoring actual performance against cost estimates and identifying the variances. The traditional cost control system is good in contract management but cannot be practiced during the execution of the project. The new methods are based on activity-based costing which helps in cost control up to the managerial level.

Cost Control and Project Management
Cost control has become a very important management tool for the construction industry as it not only helps to make a certain project successful but also gives ideas to the construction firm about the most profitable project. The cost control systems can generate data that can be used for progress payment requests and future bidding predictions.
Cost Control Systems and Cost Accounts
An efficient cost control system is necessary for the proper execution of a project. Following are the steps which are mandatory for a successful design and maintenance of a Cost Control System:

1. Determination and allocation of cost accounts is the first step for a cost control system. Proper breakdown of a project into various heads based on the type of activity and work is essential. These heads into which the project is divided are known as cost accounts. Establishing cost accounts helps in maintaining a relationship between the project expenditure and the general accounts of the firm.

2. The formulation of a proper project cost plan is the next step because it helps in setting up a mechanism according to which the actual cost of the project could be compared with the estimated/budgeted cost. Moreover, the project cost plan also helps in relating the costs of the project to the project schedule.
3. Cost Data Collection is the next step in which the actual cost data is collected by various means which include historical data, vendor quotations, supplier catalogs, and market surveys.

4. Project Cost Reporting should be done according to the requirement of managerial staff and the Cost Control Engineer should be able to identify the data which is beneficial to the managerial staff.

5. After collecting the data and analyzing it, the final step is a selection of Cost Engineering techniques best suited to the project scenario.

Cost Coding System and Structure
Since the construction projects are of a very large magnitude and there is a huge amount of data that has to be organized. Cost coding systems are used for organizing the cost control data so that the required information can be accessed easily. Various organizations like American Road Builders Association, Associated General Contractors and the Construction Specifications Institute have developed cost coding systems, and a project manager and cost control engineer can select the appropriate system according to the project under consideration. The cost coding system helps in giving a proper structure to the cost control breakdown of a project. Various cost accounts are given cost codes according to the detail incorporated in them. Cost control codes have various detail levels, the longer the cost code the higher the detail present in it. The various details which are present in a cost code are project initiation year, project type, project number, construction type classification, work classification, functional classification, etc. This makes project codes as long as 13-digit, but these details can easily be processed on computers and are also understandable as the people working in the cost control department have a very clear idea of these codes. The cost control matrix is another way of controlling cost which traces the overlapping areas between material and work cost accounts.

Earned Value Method
Earned Value Method is the most effective and most widely used method in cost control these days. It draws a comparison between the budgeted cost and the actual cost of the project and also the elapsed time of the project vs. the scheduled time of the project. This gives an idea to the contractor whether the project is under-budget, over budget, or by estimate. This method also gives an idea about whether the project is on time or late. The most important advantage of this method is that it gives an analysis of each work item or cost account separately which allows the contractor to determine the area of the project which is problematic. The various parameters used in this method are:
BCWS: Budgeted Cost of Work Scheduled; this is the value of the baseline at a given time
ACWP: Actual Cost of Work Performed; this is calculated by observing the on-site progress
BCWP: Budgeted Cost of Work Performed; this can be calculated using the work progress and total estimated budget
BCAC: Budgeted Cost At Completion; The total estimated cost of the project or cost account
AQWP: Actual Quantity of Work Performed; this is measured in the field
BQAC: Budgeted Quantity At Completion: Total estimated quantity baseline
These parameters also help in checking the percentage of project completion. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Cost Control Essay Example | Topics and Well Written Essays - 750 words”, n.d.)
Retrieved from https://studentshare.org/environmental-studies/1413816-cost-control
(Cost Control Essay Example | Topics and Well Written Essays - 750 Words)
https://studentshare.org/environmental-studies/1413816-cost-control.
“Cost Control Essay Example | Topics and Well Written Essays - 750 Words”, n.d. https://studentshare.org/environmental-studies/1413816-cost-control.
  • Cited: 0 times

CHECK THESE SAMPLES OF Cost Control Is Very Important in the Construction Industry

Sustainability

8 Pages (2000 words) Assignment

Estimating Purchasing and Cost Control

onetheless, these methods are generally used in the construction and engineering industry to measure and monitor project progress, profitability and performance for their strengths.... Practicing CVR and EV The importance of using these cost control methods in the construction and engineering sector is the uniqueness and the uncertainties that characterise each project.... important in CVR are the totals for cost and value, which are crucial in establishing a firm's profitability (Sidwell, 2005)....
7 Pages (1750 words) Essay

Strategic Partnering within the UK Construction Industry

The concept of partnering, according to Broome (2002) was first generalized as being developed in the construction industry in Japan in the 1980's, and with that the application of total quality management and lean manufacturing concepts, where taken from manufacturing industries there.... Sir Michael Latham's report, (Constructing the Team, 1994) commissioned by the government and industry, recognized the need for a solution to the on-going problems within the construction industry....
40 Pages (10000 words) Dissertation

An invertigation of influence of procurement methid in construction industry in Hong Kong

Years of existence of the company in the industry is significantly and positively correlated with importance scores of the Traditional Method.... From the survey of 50 construction professionals, there were 4 most influential criteria which are quality, cost, time and risk.... Each developer, be it from government or private corporations, aims to build projects at the earliest possible time with the least possible cost.... Size of projects handled (in terms of project cost) is not significantly correlated with importance scores of the traditional method....
54 Pages (13500 words) Essay

Study on the cost management of construction project during construction phrase

is regard, it can be impugned that the different characteristic or nature of projects in the industry and the industry itself becomes the primary reason to the differing definition of the notion of project in the construction industry.... As such, construction cost management is very significant in the construction industry.... Being such, the role of construction costs in the project in particular and in the construction industry in general is of primary significance....
20 Pages (5000 words) Essay

The Saudi Construction Industry

This means that people do not keep time commitments and this culture is also reflected in the project management, especially in the construction industry.... The other challenge for the construction industry in Saudi Arabia is that just like it is the case with other Arab countries and the Middle East, punctuality is poor and people hardly ever take time seriously.... This essay discusses the Saudi construction industry.... The essay analyses the factors of problems in the Saudi Arabian construction industry which were most eminent in included poor planning, incompetency among project managers and lack of proper communication problems....
10 Pages (2500 words) Article

Housing and Construction Cost Escalation: A Case Focused on Saudi Arabia

KSA's construction industry is compared with the rest of the GCC countries to identify which country has the most potential to grow.... Certain factors were evaluated and analyzed to identify the major reasons for the cost escalations in the housing and construction industry in KSA.... The factors that were analyzed include economic factors, geographic factors, demographic factors, social factors, and other environmental factors to provide accurate and reliable information regarding the cost escalations in the KSA's construction industry....
20 Pages (5000 words) Case Study

Alternative Forms of Core Construction for Highrise Buildings

"Alternative Forms of Core construction for Highrise Buildings" paper gives the benefits core construction exerts on the highrise buildings and deals with a number of its aspects that include the need for having cores constructed in the highrise buildings in the first place, the significance of cores.... Core construction is considered as the efficient and fastest way of maintaining phased progress of the building's related parts.... However, alternative methods of core construction are not supposed to compete with conventional forms when buildings less than 15 floors are to be constructed....
20 Pages (5000 words) Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us