The paper “The Construction of Dublin City Centre” is an exciting example of the business plan on engineering and construction. The process of Building construction involves the active participation of the architecture and civil engineering for the completion of the task as per the approved plan for the building within a given time period…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.7% of users find it useful

Extract of sample "The Construction of Dublin City Centre"

Title: Concrete Finishes Report, Construction Technology Dated: April 15, 2010 The process of Building construction involves the active participation of the architecture and the civil engineering for the completion of the task as per approved plan for the building within a given time period. The construction of building like Dublin City Center is a multitasking activity and needs close cooperation among all the major stakeholders for early completion of the project. The Buildings are constructed with the assistance of a set of interrelated tasks and the timing of each task has its relationship with the overall business plan of the project. The contractor and the design team are the central players in the whole construction process and their active participation has the capacity to complete the given assignment well ahead of the given time schedule with no compromise on the quality of the construction. However, the completion of the task that is to complete the construction process well before the given time depends upon the application of the new methods of the construction with judicious decision making process as on timely basis. The construction process for the construction of buildings need a set of inputs like ingredients for the building construction ,approved map as per building by laws ,labor and financing arrangements with flow of necessary funds as in accordance with the details of the concluded agreement between the owner of the building and the contractor(1). Construction style and applied methodology has influence on the pace and quality of the construction and the utilization of modern means of construction like use of prefabricated components, finishing techniques and the participation of the skilled manpower could result in the early construction of the building with no compromise on the quality of the construction. The building as being constructed is a four story building with a basement for storage and the application of the modern construction technologies by the construction manager will help in the achievement of the objectives of the project that is to complete the project well before the agreed completion timeframe for the project. The project will be completed with the utilization of the resources both human and physical as on optimum basis with the assistance of the specific drawings , observance of the maps for each component of the building and timely decision making process with a clear direction. The completion of the project with the utilization of the modern methods of construction will serve as a model for the building engineers and the architectures for the adoption of the techniques for the construction of similar buildings in future (2). The drawing of the Dublin City Centre is consisting of the four stories mixed use building with a storage basement as the final product of the construction activity. The architect, the contractor and the design team are in a position to complete the assignment well before the given time schedule through the adoption of constructing techniques as in the form modern building techniques and to take relevant decisions as on timely basis. The selection of the building material and the type of the construction mechanism has a direct impact on the completion period of the building. The procedures and the processes involved for the execution of the plan have also their impact on the completion period for the project. The initiation of a number of activities simultaneously will provide a structural support to the project manager and to the contractor of the project to deliver the outputs as in satisfactory manner. The process starts with the designing of the broader framework with broader outlines and moves in a systematic pattern with specific details for each individual segment of the project. The observance and fulfillment of all the details will provide a clue that the project is being completed as per the designs of the project. Description of the work: The construction of building that is Dublin City Center primarily based on the design and layout of the building with all its specifications. The description of the work starts with the details of the Basement of the building with the specifications of 12 m x 14 m x 3.5 m deep through the concrete basement walls. The starting time for the construction of the basement plays a significant role for the whole project. The trial analysis will determine the pace of the whole construction work for the building. The use of the concrete basement slab will facilitate the completion of the task at the earliest (3). The construction of the other components of the building that is other two floors and the roof with roof gardens will take their pace on the basis of the completion of the work at the basement. The complete building will be in the shape of a four stories building with a basement for storage, ground floor to first floor as the office accommodation and the second to third floors as the residential apartments. The technology as applied on the roof and the roof garden will also have its effects on the completion time for the construction of the building. The allied equipment: The construction of the building depends upon the utilization of the building construction machinery like excavator for the removal of the material from the site of the building especially during the construction of the basement of the building. A tower crane will be erected at the Crane Base area at the site for seeking technical help during the process. The use of the main vehicle at the loading and unloading areas will facilitate the contractor and the skilled labor for the delivery of their respective spheres and the utilization of the modern machinery in the operational matters will contribute in the finishing process of the building. The use of machinery helps in the supply of the inputs for their further utilization in the construction process. The contactor of the project is well aware of their significance of the machinery in the construction process and has taken sufficient steps for the supply of the machinery as per its specific need in the project (4). The project has envisaged the utilization of a crainage with a 30m tower for its utilization to serve the basement. The crane will work with the help of standard crane base with the dimensions of 5100 mm x 5100mm with the help of 600 mm piles. The site of the building is too small to cater the needs of the building construction as per the approved design of the building. The contractor of the building has decided to use prefabricated components for its early completion. To use the available space, the contactor has also decided to reduce the size of the crane as 4500mm x 4500mm with 750mm piles. The decision of the contactor to reduce the size of the crane has significant impact on the quality as well as completion time of the building. The decision of the project management to reduce the size of the crane will have the following impacts on the completion process of the building: a) The project will facilitate grater accommodation for other building materials to be arranged at the project site for their utilization in the whole production process for the construction of the building as per approved plan of the building with all its specific details, b) The utilization of the prefabricated components will help the contactor of the building to initiate multi functions at the same time and their fabrication will improve the pace of the developmental process for advance completion of the whole work and the schedule of the project will therefore needs upward shifting for its early completion, c) There will be no compromise of the quality of the work as the decision will provide all the inputs on timely basis and their utilization in the construction process will lead the project to the direction of its completion as per required building standards with the reduced cost with no compromise on the quality of the work. d) All the subcomponents will be completed as per their demand in the construction process and will automatically provide confidence to the project team. Evaluation of the project on weekly basis will serve as feedback for taking strategic decisions for timely completion of the project and an early finishing date will motivate the contractor and the project manager to re-fix the new dates for each individual assignment as at an advance stage and therefore the entire program of the project will move forward to facilitate all the stakeholders. The planning of the construction process and its significance for the completion of the building: The construction of the building that is Dublin City Center is the outcome of the planning process for the building. The planning process serves as a blue print for all the stakeholders especially the contactor and the manager to implement the plan as per all its details. Early shifting of tasks as a result of the changing the size of the crane at the site of the project and use of pre fabricated components will provide an opportunity to the contactor to reschedule the project activities (5). The project activities are evaluated by the project on weekly basis and the use of prefabricated components will reduce the cost of the project on the basis of the following reasons: 1. The prefabricated components of the building are manufactured on large scale with the application of the computer based designs and specifications with low per unit cost. For example, the construction of block wall for the first, second and third floors will have cost of 170 pond /square meter and the prefabricated walls are available in the market at the rate of 130/ square meter therefore the decision will lead to the saving of the cost of the construction of the walls for the said floors. The lower cost of the project as on the basis of the utilization of the prefabricated walls will have no adverse impacts on the quality of the work as these components have been prepared at a large scale with the utilization of computer aided designs and computer aided machinery for the manufacturing of the product. 2. The use of prefabricated components in the building will facilitate the flow of traffic as un- interrupted without any damage to the under construction building during the construction period. The flow of traffic as hurdle free will provide conducive environment for the contractor as well as to the project manager of the building to implement the project as in accordance with the revised time lines for the project. 3. The decision of the contractor and the manager of the project to utilize prefabricated concrete components will help in lowering the cost of the project in the shape of low utilization of labor in the construction process. The labor cost a significant component of the overall cost of the building construction and a decrease in the labor cost will ultimately lead into the reduction of the cost of the building but without any negative impact on the quality of the building. 4. A reduction in the labor cost at the site of the building will help in the generation of labor opportunities that is at the manufacturing sites of the prefabricated walls for the buildings like Dublin City centre and therefore will promote the prefabricated industries in many developed countries of the world for catering the needs of the customers. Financing and the building constructions: The building construction is a coordinated activity with the utilization of a variety of inputs both physical and human for the completion of the task. The availability of the financial resources as per agreement between the owner and the contractor of the building promotes confidence among all the contracting parties of the construction process. The construction process for the Dublin City Centre has been designed as in the agreement with Sub- contract target program for the completion of the project. The execution of the project with a feedback arrangement has influence on the completion period of the project. The project manager needs to deal with the sub-contract payments and to deal with the final accounts of the building. The construction of the building starts with the initiation of the work at the basement of the building and moves in a systematic pattern towards the erection and finishing of the building as in accordance with the timings of the project. However, utilization of concrete prefabricated components and a reduced size of the crane at the site of the building will help in the reduction of the completion period of the building. The release of the finance as on activity basis will facilitate the contractor to make the deliveries as per agreed technical standards along with the required quality. The promotion of subcontracting for the building construction: The promotion of subcontracting for the pre-cost concrete frame ,floors and walls and for the designing and erection of the building will also a positive step with a guaranteed payments to the subcontractors of the building. The subcontracting process for the external block work and External Stone Cladding will help in the reduction of the completion time for the Dublin City Centre. Sub-contracting process in the building industry promotes the development of specific skills as are needed in building construction industry. The subcontractors will acquire the latest skills for the delivery of their respective works as in accordance with the agreed clauses of the subcontracts, and, therefore, the quality of the delivered work will not be disturbed or deteriorated as a result of the subcontracting. The installation of the facilities like heating, ventilation and domestic services are the essential segment for the building construction and all these facilities could be installed as on subcontracting process in the Dublin City Center at economical rates. The execution of the agreements with the subcontractors needs to be drafted with utmost care for the maintenance of the quality of the installed services. The owner of the building needs to consider the followings for signing the agreement with the subcontractors for the execution of the agreements like: a) The sub-contracts may be the part of the final agreement and therefore all the agreements will be executed by the contractor with the subcontractors for the delivery of the goods and the services as per required standards and quality within the given time frame, b) The payments will be released to the subcontractors directly by the contractor and will be debited in the main account of the contactor, c) For the maintenance of the quality of the goods and the services ,the durability of the goods and the products will be ensured by the contractor of the building and finally , d) The contractor will deal with the subcontractors for making payments to the subcontractors and will also maintain their respective accounts for making their final payments. The construction of building and pre-loading of the floors and other essential components: The construction of the buildings is a coordinated activity for the completion of the task as a complete product in the shape of the building like Dublin City Center as four story building. The provision of all essential services as per the requirements of the building is supplied by the contractors to honor the agreements. The installation of floors in the building is an essential ingredient of the building and the installation of preloading floor at each floor with a size of 12m x 14 m including the basement will help in the early completion of the project. The installation of pre-loading floors in the building could be installed during pre-cast frame erection with pre-packed materials. The installation of boxed-up for each individual office and apartment is recommended for early completion of the building. Similarly, ironmongery, electric wiring sets, heating packs and the door linings could also be installed in the building as on subcontracting basis. The installation of all these products on subcontract basis will help in the reduction of the completion time for the whole building but without any kind of compromise on the quality of the work. The subcontracting process needs close monitoring by the project manager on weekly basis for the maintenance of the quality of the work in the building. The external walls and finishing of the walls of the building: The external walls of the building will be constructed as cavity wall as the type of wall will facilitate in the stoppage of the seepage in the building. Seepage in the walls of the building has a tendency to increase the cost of the building construction as the same has also a likelihood of increasing the repairing cost in the subsequent years of the life of the building. These walls will be constructed with an internal leaf of 60mm thick rigid insulation board and monocouche render finish for the external walls of the building. Similarly, the building will be finished with the use of stone finishing as the step will enhance the aesthetic value and durability of the building. The arrangement will be utilized in the front side of the building. The rear development of the building will be completed with the stone finish of the rear side of the building for making the building durable and spacious. Conclusion: The construction of the building like Dublin City Center is a coordinated activities with the participation of a number of primary and secondary stakeholders and all the primary stakeholders that is the owner of the building, the project manager ,and the contractor in favor of the early completion of the building and the adoption of clear strategy for taking relevant decision and their implementation will result in the early completion of the building without any compromise on the quality of the building. The use of pre-loaded floors, concrete prefabricated blocks for the construction of the walls of the building and necessary amendments in the size of the equipment like the Crane at the site for the construction of Dublin City Centre will help in lowering the cost of the building with no compromise on the quality of the building. The strategy as adopted by the top executives and the team management along with the contractor of the building has provided a plan for the construction of buildings that has the capacity for its replication for the achievement of the similar results in many parts of the developed world. References: 1. Blank, Alan; McEvoy, Michael; Plank, Roger (1993). Architecture and Construction in Steel. Taylor & Francis. ISBN 0419176608. 2. D. Rowland - T.N. Howe: Vitruvius. Ten Books on Architecture. Cambridge University Press, Cambridge 1999, ISBN 0-521-00292-3 3. John Ruskin, The Seven Lamps of Architecture, G. Allen (1880), reprinted Dover, (1989) ISBN 0-486-26145-X 4. Heyman, Jacques (1998). Structural Analysis: A Historical Approach. Cambridge University Press. ISBN 0521622492. 5. Holm, Ivar (2006). Ideas and Beliefs in Architecture and Industrial design: How attitudes, orientations and underlying assumptions shape the built environment. Oslo School of Architecture and Design. ISBN 8254701741. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(The Construction of Dublin City Centre Business Plan, n.d.)
The Construction of Dublin City Centre Business Plan. https://studentshare.org/engineering-and-construction/2033304-concrete-finishes-report-construction-technology
(The Construction of Dublin City Centre Business Plan)
The Construction of Dublin City Centre Business Plan. https://studentshare.org/engineering-and-construction/2033304-concrete-finishes-report-construction-technology.
“The Construction of Dublin City Centre Business Plan”. https://studentshare.org/engineering-and-construction/2033304-concrete-finishes-report-construction-technology.
  • Cited: 0 times

CHECK THESE SAMPLES OF The Construction of Dublin City Centre

ODonnell and Tuomeys Lyric Theatre, Belfast

Introduction dublin based architects Sheila O'Donnell and John Tuomey , who have been practicing together since 1991, have a thoughtful outlook and attitude of how they ply their craft, that can be summarized as – continuity and renewal, which will be the subject of this paper.... They, too, believe that the materials of the land are the materials that should be used in their buildings, which is why, for instance, their Lyric Theatre, which is the subject of this dissertation, uses the bricks which are commonly found in buildings throughout dublin....
24 Pages (6000 words) Dissertation

Irish Urban Regeneration

he evolution of the city saw and increase in urban expansion in the 20th Century, and the Irish economic boom led to an upsurge in the construction of private homes.... The principal city in the Republic of Ireland is Dublin, and its suburbs are characterised by the segregation of land usage.... 2001) that came about as a result of the unwillingness of the private sector to enter many Dublin inner city neighbourhoods that had degenerated to dereliction....
4 Pages (1000 words) Essay

Planning in Ireland. Does Planning Ensures Economic Growth

Redevelopment is taking place in large projects such as Dublin Docklands, Spencer Dock and others, transforming once run-down industrial areas in the city centre.... Today, it is an economic, administrative and cultural centre for the island of Ireland, and has one of the fastest growing populations of any European capital city.... The city Dublin, founded as a Viking settlement, the city has been Ireland's primary city for most of the island's history since medieval times....
4 Pages (1000 words) Essay

The Gap in Irelands Infrastructure and What Is Done to Close It

The Republic of Ireland of today has come a long distance from the poor country it was late in the twentieth century.... The country joined the European Community early in the 1970s as one of the poorest, if not exactly the poorest country in Europe, however, in the course of about three decades, the story has significantly changed....
10 Pages (2500 words) Essay

The History and Regeneration of Ballymun, Co. Dublin Ireland

and dublin city Council.... In examining this issue the author has looked at Ballymun as a whole and researched past problems and mistakes made by the government and dublin city Council.... ointing out urban problems in dublin ... The aim of this paper is to provide an overview of the regeneration of Ballymun, a major renewal project now being implemented in dublin.... This company was established by dublin Corporation in 1997 to prepare and implement a plan for the regeneration of the Ballymun estate and the ambitions housing demolition of the flats and rebuild of new homes and socio-economic development programme which it has devised will be funded by a mixture of direct public investment together with tax relief for private sector investment in house building and office and factory development....
70 Pages (17500 words) Essay

Two Great Gothic Cathedrals

Patrick's Cathedral in dublin, Ireland.... Two great cathedrals built during the medieval period are the Chartres Cathedral in Chartres, France and St.... Medieval architecture, which started around the 5th century until the 16th century, included the Romanesque and the Gothic periods....
6 Pages (1500 words) Essay

World Wars Legacy and Decent Housing Provision

According to Taylor (1998), Birmingham city took the lead as other cities followed in the same footsteps.... A significant number of people are still languishing on social housing waiting lists and the rate of house construction critically.... rior to the First World War, Britain's construction and provision of housing was largely a responsibility of the private sector (Burnett 1986).... It was not until the termination of the First World War that the central government and local authorities assumed more active role in house construction and utilization of land....
16 Pages (4000 words) Essay

The Profile of an Investment in Property in Dublin and Its Dramatic Changes

The paper describes Dublin that qualifies as a global city as it has been a centre of international trade and investment.... dublin had been doing quite well since the start of the 21st century in that it gained the attention of a lot of international investors of residential property.... The boom in the price of property in Ireland and specifically dublin started to recede as hikes in the interest rate started to show up in the year 2006 and 2007....
12 Pages (3000 words) Research Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us