The Mechanisms of Information Communication on Construction Sites - Literature review Example

Cite this document
Summary
The discussion "The Mechanisms of Information Communication on Construction Sites" seeks to answer the question: Is communication with subcontractors affected by the management style adopted by the main contractor and does this impact the quality of the end product?…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95.1% of users find it useful
The Mechanisms of Information Communication on Construction Sites
Read Text Preview

Extract of sample "The Mechanisms of Information Communication on Construction Sites"

Literature Review: Is communication with subcontractors affected by the management style adopted by the main contractor and does this impact on the quality of the end product? Communication is one of the imperative aspects of operations in an entity. Most of the success stories in the construction industry have been attributed to communication and consultation among the stakeholders. In most cases, management and communication styles are intertwined. The management style of the project manager determines the communication style he or she will employ (Fewing, 2009). Notably, Loosemore, Lingard and Dainty (2003) argues that the communication styles in the construction industry should be founded on a comprehensive apprehension of the ways that individuals collaborate in joint operations, the fundamental principles of social undercurrents and learning theory. Remarkably, numerous authors have attributed improved communication between management and subcontractors to operational effectiveness. In this case, the communication strategies employed by the management towards subcontractors have an effect on their motivation levels and affect the project building (Loosemore et al, 2003). Additionally, Walker (2011) takes the same stand by adding that ineffective communication strategy employed by management can result to problems in the production and construction and, therefore, defective project buildings. However, Loosemore et al (2003) and Walker (2011) fail to show the link between ineffective management style and ineffective communication between the project manager and the subcontractors. In essence, construction projects are risky and complex. This makes them require active participation between the subcontractors and the management. Coordination of activities through group communication is imperative for successful completion of the project. Walker (2011) acknowledges that inappropriate communication strategies result to inadequate feedback and consultation, which are the root causes of defects of the final product. Fewing (2009) notes that constant flow of information between management and subcontractors are essential for proper management of construction projects. It is also significant for the information to be relayed fast. Additionally, a study by Chen and Kamara (2008) identifies communication as one of the primary elements of management of construction projects. Notably, effective communication is imperative for the effective operation of any entity. This study acknowledges that poor communication strategies and the design of the information relayed results to design problems that lead to design problems or a defective end product. An interruption or failure in the information relayed results to problems that trigger poor work quality and low productivity. It is, therefore, significant for the project manager and subcontractors to institute a clear chain of communication for conveyance of information. A project manager should have a communication strategy that relays information on order requests and directives. In most cases, the communication should be in writing to avoid any instances of being forgotten. Additionally, this study notes that information should be communicated through appropriate channels to the right receivers without any delays. Arguably, construction takes place fast, and any mistakes or failures to communicate changes in plans or materials to be used will result to an expensive ripping off of the completed work or product or slowdown the process. Therefore, it is imperative to relay all the information required by engineers and architects to carry out their activities and deliver quality services. Given that the construction sector is vibrant, fragmented, and heterogeneous, the difficulties of communicating efficiently are high than in almost all the other sectors (Fewing, 2009). Loosemore et al (2003) identifies that conflict, contractually driven associations, and deficiency in trust and respect are the factors that hinder open communication between project manager and the subcontractors. This makes the whole project extremely problematic to control and manage. This, in turn, according to Walker (2011), will have an effect on the project building. Communication in the construction sector has evolved over the past decades. Fewing (2009) shows that communication has gradually become an imperative aspect in construction project management. This has also been attributed by the development of technologies that can enhance communication between the manager, the engineer and architect. Fewing (2009) shows the different communication styles that are linked to numerous management styles. The most common management styles are persuasive, democratic, consultative and autocratic styles. This book offers an understanding of the communication styles that a manager is likely to use when he employs a certain management style. In his book, Fewing (2009) shows that an autocratic manager is likely to use an aggressive communication style while a democratic manager is likely to use an assertive communication style. Additionally, more studies have focused on the significance of communication, thus making communication a vital element in the construction. Earlier management styles have been described as having been autocratic with no open communication between the manager and the subcontractors. At present, organizations have concentrated on the efficiency of their operations, which calls for a change in management style to a democratic one that allows effective communication. This book also offers a link between the management style and the communication style employed by project managers. Fewing (2009) also gives a review of how the different managerial styles affect the motivation levels of the subcontractors and how they affect the completion of the building projects. In the study by Chen and Kamara (2008), 58% of the projects investigated revealed that they failed to attain their objectives due to poor communication styles. The project architectures and engineers interviewed acknowledged that the project managers did not want to hear them out and this provoked alienation, resistance, lying, cover-up and sabotage. These were the primary causes of the failure of the projects and resulted to defective end products. This backs the report by Loosemore et al (2003) that, ineffective communication styles employed by managers and subcontractors cause conflicts and lack of trust and result to failure to attain the construction objectives thus resulting to defective end product. The literature in this study will be obtained from the internet and the school library. Since there are thousands of articles on construction engineering, the literature obtained will focus on current books and articles published on communication and managerial styles exhibited by manager and subcontractors and their effect on the end product. References Chen, Y and Kamara, J. (2008). The Mechanisms of Information Communication on Construction Sites. FORUM Ejournal 8:1-32 Loosemore, M. Lingard, H. Dainty, A (2003) Human Resource Management in Construction Peter Fewings (2013). Construction Project Management. 2nd ed. Park Square, Oxon: Routledge. Page 2-3. Walker, A. (2011) Organizational Behaviour in Construction. Wiley-Blackwell:Chichester Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Is Communication with Subcontractors Affected by the Management Style Literature review, n.d.)
Is Communication with Subcontractors Affected by the Management Style Literature review. https://studentshare.org/engineering-and-construction/1807545-literature-review
(Is Communication With Subcontractors Affected by the Management Style Literature Review)
Is Communication With Subcontractors Affected by the Management Style Literature Review. https://studentshare.org/engineering-and-construction/1807545-literature-review.
“Is Communication With Subcontractors Affected by the Management Style Literature Review”. https://studentshare.org/engineering-and-construction/1807545-literature-review.
  • Cited: 0 times

CHECK THESE SAMPLES OF The Mechanisms of Information Communication on Construction Sites

Communication Skills in the Construction Industry

This paper shall likewise recommend that individual sites be treated as a separate business unit managed by a Project Manager.... This essay explores the communication skills in the construction industry.... This paper shall recommend that a more detailed task list that is a day-long in duration for each section of the structure be incorporated in the construction plan.... Cross-sectioning of the construction plan into modules under a foreman instead of construction phases will enable any site managers to achieve his deliverables....
9 Pages (2250 words) Assignment

PROJECTS & SYSTEMS THEORY

He focused on the interrelationship between system parts in biology.... It is evident that, at that time many philosophers and scientists tried to explain how the universe operates, but, there were no proven systems in.... ... ... As sciences split into physics, biology and chemistry, they started to understand how the earth operates systematically....
11 Pages (2750 words) Assignment

Environmental Management in Reducing Waste from Construction Sites

The dissertation 'Environmental Management in Reducing Waste from construction sites' concerns the need to maintain environmental sustainability during construction activities.... A primary aim of this paper is to provide a real picture of what is happening in construction sites and how this has implications for the environment and what EMS has done about it.... This dissertation will provide an overview of the impact of environmental management systems in reducing waste outputs from construction sites, conduct a research....
37 Pages (9250 words) Dissertation

A Business Strategy of a Swedish Construction Firm Skanska

The author of the current research paper "A Business Strategy of a Swedish construction Firm Skanska" points out that Skanska the international leader in environmental redevelopment construction offers situation analysis the highest caliber example in its integrated business-to-business strategy.... Skanska the international leader in environmental and urban redevelopment construction offers situation analysis the highest caliber example in its integrated business-to-business strategy....
23 Pages (5750 words) Research Paper

Construction Practice and Information Technology

"Impact of Mobile and Wireless Communications on construction Industry" paper explores the positive effects of this modern technology and its impact on the construction industry.... The introduction of mobility in the construction industry has laid the foundation for utilizing novel mobile technologies which can further provide assistance.... The flexibility of staff has always been essential in the construction businesses with respect to place and time....
15 Pages (3750 words) Coursework

Development of Student Collaboration and Communication Platform

This literature review "Development of Student Collaboration and communication Platform" describes features of online collaboration.... In fact, the use of e-collaboration and e-communication technologies for work is commonplace today.... Nowadays, for collaboration and communication, web-based tools are now extensively employed by both companies and individuals.... These web-based tools are now helping to simplify communiqué and back the exchange of data, information, resources, and documents either among groups or between two or more individuals....
16 Pages (4000 words) Literature review

The November 2005 Buncefield Oil Storage Incident

This case study "The November 2005 Buncefield Oil Storage Incident" demonstrates the Buncefield incident that was resulted from design failures of primary secondary and tertiary mechanisms of fuel containment (Steel construction institute, 2009).... ... ... ... The investigation established that safety designs should account for possible vapor cloud formation on fuel containment vessels and land use planning should advise the design process....
11 Pages (2750 words) Case Study

Disaster Management and Recovery Plan: B&C Company

It engages in preconstruction activities, construction activities, life cycle analysis, speed to revenue activities, active campus planning, and economic inclusion services.... However, B&C Company has a role to play as a building and construction company.... B&C Company is a building construction company in Hong Kong abbreviated as BCC.... B&C Company has also engaged in the development of industrial projects and road construction in some parts of China....
12 Pages (3000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us