This literature review "The Differences in Measuring Building and Civil Engineering Work" tells that in the construction trade collaboration is a vital element. New Rules of Measurement emphasizes a lot on details, whereas CESMM4 has an inclusive stance about the process of analysis…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.8% of users find it useful
The Differences in Measuring Building and Civil Engineering Work
Read Text Preview

Extract of sample "The Differences in Measuring Building and Civil Engineering Work"

The CESMM4 standard of measurement reflects various methods in the industry, not only in the nature of work but the estimating conventions and the degree of detail in use by both the civil engineering and construction sectors. Therefore, it reflects the different ways that civil engineering and building projects are carried out and organized. In general, New Rules of Measurement (NRM2) emphasizes a lot on details, whereas CESMM4 has an inclusive stance about the process of analysis. Construction work has different areas whereas civil engineering works have massive quantities of a relatively small range of issues.

For example, while using NRM2 to measure the hole, it is essential to separate working space and earthwork support. Nevertheless, while using CESMM4, all items should be in a single excavation item (Lee et al. 2011).New Rules of Measurement (NRM2)It significant to acknowledge at this level that NRM2 is not a system of classification in itself; it refers to a collection of measurement rules. Similarly, among the NRM2 objectives is to map onto several classification systems, including Uniclass and CAWS.

However, the rules of measurement will be the same in all cases. For example, the measurement of concrete work will remain in cubic meters, and the brickworks measurement will still be in square meters with the inclusion of insulation and forming cavities in the description.However, the primary variation occurs while sourcing the designation that accompanies such measurement. Since the NRM2 format does not have a classification specification, the quantities bills will still have to refer to the former system; Uniclass/ CAWS or in the near future, Uniclass2 (Ashworth 2010).

The illustration below compares some of the sections used in CESMM4 and NRM2.Evidently, there are notable variations in terminology and description, and there are changes in the scope, as well. Some of them may seem striking but maybe because of terminology. Additionally, it is established that the classifications are not in the same order in the groupings, so there is a lack of an obvious mapping at the level. Principally, there is no difference in applying NRM2, where a particular work in a section may be measured per the rules in other sections (Geddes & Drury1960).

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Discuss, quoting examples from NRM2 and CESMM4, the differences in Assignment”, n.d.)
Retrieved de https://studentshare.org/engineering-and-construction/1664928-discuss-quoting-examples-from-nrm2-and-cesmm4-the-differences-in-measuring-building-and-civil-engineering-work-and-why-these-differences
(Discuss, Quoting Examples from NRM2 and CESMM4, the Differences in Assignment)
https://studentshare.org/engineering-and-construction/1664928-discuss-quoting-examples-from-nrm2-and-cesmm4-the-differences-in-measuring-building-and-civil-engineering-work-and-why-these-differences.
“Discuss, Quoting Examples from NRM2 and CESMM4, the Differences in Assignment”, n.d. https://studentshare.org/engineering-and-construction/1664928-discuss-quoting-examples-from-nrm2-and-cesmm4-the-differences-in-measuring-building-and-civil-engineering-work-and-why-these-differences.
  • Cited: 36 times

CHECK THESE SAMPLES OF The Differences in Measuring Building and Civil Engineering Work

Technological Advancements in Historic Preservation

Name: Course: Date: Technological Advancements in Historic Preservation Building preservation is a practice that has existed for many years with many approaches being made in traditional building and construction to ensure that buildings are continuously sustainable.... The early adobe building foundations varied greatly according to their differences in local building construction and available materials, which resulted in great variability in these buildings, including their sustainability (Old House Web)....
7 Pages (1750 words) Research Paper

Project Management - Challenges of Building Information Modeling

He heads a government agency whose role is to ensure application of BIM and recounts that significant progress has been achieved over the scope of his work and that of his agency.... BIM Introduction building Information Modelling, commonly known as BIM, is a process of developing and managing digital structures, both physical and operational features.... I, in this paper, summarize an article on building Information Modelling and expound the article's major points....
3 Pages (750 words) Essay

A Building Preservation Trust Rescue of the Rothesay Pavilion

A building Preservation Trust Rescue of the Rothesay Pavilion Institution Introduction Rothesay Pavilion is a truly iconic building that was opened in 1930 and is often described as one of the finest and most significant example of an Art Deco architectural design that still survives in Scotland.... The building is a national architectural importance which was recognized by the award of grade A listing that still contain the original features of art during that time....
19 Pages (4750 words) Assignment

Management Portfolio

Special procurement will include an overhead crane for the industrial building and an elevator conveying system for the administrative office building.... A warehouse building is provisionally proposed as a later addition to the project, but is not initially included in Site work shall involve grading, drainage, and other on-site utilities that are necessary for the operation of the service facility.... The scope of the project includes engineering, procurement, and construction for the site-work and two initial buildings....
14 Pages (3500 words) Essay

Applied Principles of Value Management and Engineering

This paper "Applied Principles of Value Management and engineering" is an initial report on the study that the value management and value engineering team conducted on the proposed recreation and commercial center featured in SBE Innovations Project Workshop.... Do a way of measuring value, taking into account non-monetary benefits and demonstrating that value for money has been achieved....
15 Pages (3750 words) Term Paper

Conditions of Work for Civil Engineering Construction

In this paper “Conditions of Work for civil engineering Construction,” the core clauses of NEC and FIDIC are compared with particular emphasis to the core risks.... hellip; The author states that conditions of the contract of NEC were developed by the UK institution of civil engineers....
7 Pages (1750 words) Assignment

Three Major Landmarks in History of Mechanical Engineering

"Three Major Landmarks in History of Mechanical engineering" paper examines Boeing 367-80, an archetype for the 707 airliners and the KC-135 Stratotanker, Experimental Breeder Reactor 1, and the Holyoke Canal System that is a structure made up of power canals located in Holyoke, Massachusetts.... hellip; There are several remarkable mechanical engineering accomplishments as selected by the American Society of Mechanical Engineers, ever since it started the program in the year 1971....
6 Pages (1500 words) Coursework

The Solution of Engineering Design Problems

Consequently, we were issued with a block of foam as one of the materials to work on.... At the design workshops, the members took specific areas of the foam to work on.... Later, the group was engaged in a brainstorming session to decide on which shape would be effective and easy to work on.... … The paper "The Solution of engineering Design Problems" is a great example of an assignment on engineering and construction....
8 Pages (2000 words) Assignment