StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

JCT Design & Build Contract - Coursework Example

Cite this document
Summary
The law covers both verbal and written contracts. However, there are other provisions such as those relating to adjudication, which have to be in writing. The new Act also grants more power to…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.4% of users find it useful
JCT Design & Build Contract
Read Text Preview

Extract of sample "JCT Design & Build Contract"

Download file to see previous pages

One other significant change to the payment provisions is the outlawing of the clause ‘pay when paid’. The new act also sets timescales to follow when making payments for contracts. Another change regarding the payments is that if one party fails to issue notice of payment as the contract requires, the other party can step in and issue such notice, extending the date for final payment. Any such payments specified by notice ought to be paid before the final date of payment. Contracts stand to benefit a lot from these amendments.

Unlike in the previous law, contractors have an active role in the payment provisions. For instance, contractors can recover some of their funds for the work done when a contract is suspended. This was not possible in the previous legal framework. Contractors can also benefit from the fact that contracts no longer have to be in written. Some of the matters agreed upon by the parties verbally can also be incorporated in the contract. This ensures that the contractors are not shortchanged whenever they make verbal agreements with their clients.

Additional works in a contract comprise of variations to the original scope of the building contract. This is a common occurrence in building contracts where variations can occur due various emerging issues in performing contractual obligations. JCT 2011 Design and Build Contract provides various provisions on how contactors should deal with alterations to the original terms of the contracts when valuing additional works. Clause 2.11 of the law, for instance, states that “Subject to Clause 2.

15, the Contractor shall not be responsible for the contents of the Employer’s Requirements or for verifying the adequacy of any design contained within them.”This clause protects the contractor from suffering losses when the client or employer changes terms or requirements of the contract. In a

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“JCT Design & Build Contract Coursework Example | Topics and Well Written Essays - 1000 words”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1654849-jct-design-build-contract
(JCT Design & Build Contract Coursework Example | Topics and Well Written Essays - 1000 Words)
https://studentshare.org/engineering-and-construction/1654849-jct-design-build-contract.
“JCT Design & Build Contract Coursework Example | Topics and Well Written Essays - 1000 Words”, n.d. https://studentshare.org/engineering-and-construction/1654849-jct-design-build-contract.
  • Cited: 0 times

CHECK THESE SAMPLES OF JCT Design & Build Contract

Contractual Agreement for an Architect in Canada

The various kinds of contractual agreements that architects in Canada use are the singly prime contract, the sort of contract an architect might go into when offering archetypal Design-Bid-Build services, the build operate and the contract management at risk (CM at risk) (Quatman and Dhar 342).... Single prime contract The single prime kind of agreement has the client compensates the construction of the whole project to one prime architect, or contractor....
5 Pages (1250 words) Research Paper

Design-build and Design-Bid-Build Contracts: Their Advantages and Disadvantages

Unlike the design-build contract system, this is a traditional approach that has been designed by the statute.... The design-bid-build contract system considers the public owner improvement projects.... The design-bid-build contract system is generally used when a new construction is in plan.... In the design-bid-build contract system, the risk is generally to the owner since with any problem with the details of the documents, the contractor generally demands an increase in price....
11 Pages (2750 words) Research Paper

The FIDIC 1999 Red Book

These contracts offer two forms, namely, Conditions of contract for Construction and Conditions of contract for Design and Build.... These contracts offer two forms, namely, Conditions of contract for Construction and Conditions of contract for Design and Build1.... However, these contracts exclusively apply to public centre construction entities in UAE; thus, private developers are free to adopt any preferred form of contract....
8 Pages (2000 words) Essay

Training Manual on the Law of Contract

A contract is an agreement enforceable by law.... A contract is made between two or more independent legal entities, by which rights are acquired by one or more, to act on the part of the other.... It creates and defines obligations between the parties of the contract. … All agreements are not necessarily enforceable by law, e.... an agreement to build a house is a contract enforceable by law.... It can thus be concluded while all agreements may not be contracts, all contracts are definitely agreements. It may be noted that a contract essentially contains two elements: Agreement and enforceability by law....
5 Pages (1250 words) Assignment

Construction Contracts

Also, there will be minimal arguments to expect in the interpretation of the contract because the new JCT2005 is written in plain simple English and the major parts are segregated from one another in sections.... If there is a mutual agreement to have an overseer for the works, the title is now called Architect/contract Administrator instead of just an Architect.... It can no longer be a part of the job of the Architect/contract Administrator....
6 Pages (1500 words) Essay

Services Project Management Four

The law of contract determines which agreements are enforceable and regulates those agreements, providing remedies if contractual obligations (undertakings or promises) are… In the building services and the construction industry, contacts can be classified on the basis of several parameters depending on project type, scale, or the structure of the entity executing the project.... A contract is an essential tool for the ful completion of any project, and ties together various participating components of the project on the basis of deliverables over a planned time frame....
12 Pages (3000 words) Essay

Construction Contract Law

The contract has guidelines to how project management should be handled and how legal relationships should be handled.... This is due to the time-efficiency, quality and cost Comparison of NEC 3 and JCT NEC, short for New Engineering contract, refers to a family of contracts that enhances the construction process.... The contract has guidelines to how project management should be handled and how legal relationships should be handled.... Other than the guidelines, this engineering contract assists construction engineers in procuring projects and the supply of materials to the project sites (Cartlidge 2009, p....
2 Pages (500 words) Research Paper

The Design Process and the Main Principle Requirements of a Project

They are required to administer the construction program within the architect's direction contract's manager or site agent – On large projects, the main contractor's representative on-site, with overall responsibility for ensuring that work proceeds effectively and efficiently, i.... Estimator – Prepares unit rates for the pricing of tenders, and carries out pre-tender investigations into the cost aspects of the proposed contract Buyer – Orders materials obtain quotations for the supply of materials and services....
16 Pages (4000 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us