StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Construction management - Assignment Example

Cite this document
Summary
As a function of planning and engaging this particular project, the firm has undergone a thorough risk analysis with respect to some of the likely eventualities and how they might impact upon project cost, completion dates, and impacts to third parties (namely those residents on…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95% of users find it useful
Construction management
Read Text Preview

Extract of sample "Construction management"

Download file to see previous pages

One of the considerations that was taken with respect to this particular project concerns the dangers and potential hazards of deconstructing the old pipeline. Although full safety inspections will of course be conducted prior to any activity of actual deconstruction being engaged, it is not unlikely that a potential hazard might be engaged and additional time and/or personnel required in order to de-construct the existing pipeline in and ineffective, efficient, and environmentally sustainable manner (Maddox-Abbott & Laskowski, M 2014).

As a means of countering this particular risk, the project has been divided into two distinct phases. The first phase is with respect to those areas that are not densely populated. Similarly, the second phase is contingent upon those regions that are densely populated. As such, rather than dividing the project based upon the actual geographic area of pipeline replacement within these two geographic spheres, a risk management approach has indicated that a disproportionate amount of time must be provided for contingencies or eventualities within the densely populated region of Jersey Island.

Even though it is true that the total geographic area of pipeline replacement that is encompassed within these areas is a minute fraction of the overall project scope, fully 30% of all available time for this phase of the project has been devoted towards these regions to counter any contingencies that might arise. Some of the contingencies that were considered with respect to these urban areas were concentric upon damaged infrastructure, potential leaks, and other issues arising from the physical deconstruction of the existing and old pipeline infrastructure (Golob et al, 2013).

Another relevant risk that was considered and planned for accordingly has to do with issues pertaining to shipment. As was noted within the initial project proposal, there are no factories on Jersey Island that are capable of producing the type of infrastructure that

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Construction management Assignment Example | Topics and Well Written Essays - 2750 words”, n.d.)
Construction management Assignment Example | Topics and Well Written Essays - 2750 words. Retrieved from https://studentshare.org/engineering-and-construction/1652867-construction-management
(Construction Management Assignment Example | Topics and Well Written Essays - 2750 Words)
Construction Management Assignment Example | Topics and Well Written Essays - 2750 Words. https://studentshare.org/engineering-and-construction/1652867-construction-management.
“Construction Management Assignment Example | Topics and Well Written Essays - 2750 Words”, n.d. https://studentshare.org/engineering-and-construction/1652867-construction-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Construction management

Sustainable Construction, Management and Professional Studies

These contracting methods include the design and build method, management contracting... Procurement method Since Uxbridge Water plc is aware of the construction process and more over it has a professional team who will play a significant role in the repair works, it is therefore crucial that the company uses design and build procurement method.... Although the method is very important in cases where the client, or the company is not familiar with the construction process, the design and build contracting method works well on the projects which has no design and there is need for a design before commencing with the repair works (Macaulay, 2002)....
6 Pages (1500 words) Essay

BIM and Construction management

BIM and Construction Cost management Name: Institution: BIM and Construction Cost management BIM stands for Building information modeling.... BIM is concerned with adoption of new and advanced technology in the construction industry; and emphasizes on information; communication of information across all sectors of the construction work; use of digital options for transforming physical facilities or buildings and sharing of this information for decision making....
4 Pages (1000 words) Assignment

Construction Management & Organisation

Project management involves planning, organizing, scheduling, managing, directing, controlling resources and interdependent activities to achieve specified goals or objectives.... An effective project management has got four main functions; Project planning, team building, directing and control measures....
7 Pages (1750 words) Essay

Introduction to Construction Management

I am taking this class to discover new ideas in construction management, and to fulfill my… After attending this class, I became more interested in construction management field.... If I had a chance to change my major, I would definitely choose construction management.... I have Purdue Calumet School of Technology CMET 10300 Introduction to construction management December 9, Dr.... I am taking this class to discover new ideas in construction management, and to fulfill my graduation requirements....
1 Pages (250 words) Essay

Applied Construction Management

The construction will be brought up on an existing green field site that is located to the north of the north west of Leeds.... The city is one of the fastest growing in the United… The constructed car park will be of essence since the off street parking is limited to a maximum of an hour (Arnold, 2012)....
14 Pages (3500 words) Coursework

Construction Management - Finance and Risk Management

The description is a critical reflection of what I think is the attitude of my countrymen, my family and an organization to the matters of risk management and financial management.... Now the question that arises in this context is related to the risk management practices that are implemented to counter the risk.... The paper analyzes the risk management methods and the perception of risk management and financial management methods by the people....
14 Pages (3500 words) Essay

The Construction Management

This paper "The construction management" presents the business of construction that is, indeed, a very rewarding one.... This shows that the owner has opted for a Cost Plus Fee type of construction management procurement method.... Additionally, the interested companies need to present the proof of availability of the required staff educated and trained in construction management practices, and other resources that the owner feels necessary for a construction manager to be equipped with, in order to ensure efficient supervision of the project....
9 Pages (2250 words) Case Study

Project Planning in Hotel Construction Management

This work called "Project Planning in Hotel construction management" describes project planning practical problems and solutions to risk reduction.... The author takes into account the activities of subcontractor's work, requirements of project management, the competitiveness of offsite manufacturing.... The examination of a project management software leads to this level as the primary useful entry-level.... The packages facilitate fundamental project management functions (Dinsmore and Cabanis-Brewin, 2011)....
8 Pages (2000 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us