Quantity Surveyors Role in Construction Dispute Resolution - Assignment Example

Cite this document
Summary
Wastage of time and money due to disputes has always jeopardized the construction industry but due to the recent phenomena of globalization the probability of occurrence of disputes has increased drastically. The reason being variety of parties with different cultural and legal systems engaged in a single project with varying interests…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97.8% of users find it useful
Quantity Surveyors Role in Construction Dispute Resolution
Read Text Preview

Extract of sample "Quantity Surveyors Role in Construction Dispute Resolution"

Download file to see previous pages

The system being young is in a phase of evolution, hence some of them are the there are several techniques that are devised for the execution of the approach. This paper will cover the most relevant and applied ones with respect to the construction industry of UK. In addition, I strongly believe that we discuss techniques which are being discussed and administered under Arbitration Act 1996. The techniques that are discussed in this paper would be as following, 1. Negotiation, 2. Arbitration, 3.

Mini-trial , 4. Dispute Review Boards/ Dispute resolution boards, 5. Mediation 1. Negotiation One of the foremost and basic techniques is negotiation. This technique is discussed first due to the fact that it occurs first in the process of dispute resolution. In this the parties in dispute resolve the issue themselves and no third party is involved in the process. The process of conducting this technique is simple and basic, where the two parties meet, preferable face to face, discuss upon the issues, finally coming to a mutually agreeable point.

If this point is reached than normally the process end with an issues of a letter of agreement or memorandum of understanding, which will act as partial bidding for future line of action for both parties. The advantages of this technique are that it cheapest and quickest for the parties. Then this technique helps in retention of the commercial relationship between the parties. Most importantly there is least preach of confidentiality under this technique, as no or very little information is transmitted to other external sources and the engaged parties have the full control.

Whereas the disadvantage of this technique is that it is not applicable incase the difference claims from the parties is too much and if either party is not interested to continue the work or maintain commercial relation. The role of the quantity surveyor is the most crucial one in this technique, due to the fact that whenever there is a dispute, both parties have to evaluate and quantify there loss/gain which will act as a decision support system. As mentioned earlier in the start of a dispute it is all about the number game and there is very less input required from the side of the lawyers at this stage, so the project manager or management in general are very dependent on Quantity Surveyors for advice and evaluation of the cost and benefit analysis.

Lastly when the two parties meet for negotiation, only the quantity surveyor has the precise knowledge about cost, associated resources and issues related to certain activities of the project. Hence the role of QS is most relevant in this technique as there is very less involvement of law and very high level of involvement of numbers and activity monitoring. I believe the process can be improved if this process start from the lower levels of management and then go up. As it is suggested that the lower management must first meet and try to resolve the disputes. 2. Arbitration Arbitration is one of the two oldest techniques to dispute resolution, hence several newly devised are somewhat rooted out of this technique.

The arbitration is initiated if the initial negotiations fail, and several of the times it is invoked by the clauses of the contract that was written between the parties. If there is no provision of Arbitration in the contract then a voluntary agreement is made between the partie

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Quantity Surveyors Role in Construction Dispute Resolution Assignment”, n.d.)
Quantity Surveyors Role in Construction Dispute Resolution Assignment. Retrieved from https://studentshare.org/engineering-and-construction/1453275-quantity-surveyors-role-in-construction-dispute
(Quantity Surveyors Role in Construction Dispute Resolution Assignment)
Quantity Surveyors Role in Construction Dispute Resolution Assignment. https://studentshare.org/engineering-and-construction/1453275-quantity-surveyors-role-in-construction-dispute.
“Quantity Surveyors Role in Construction Dispute Resolution Assignment”, n.d. https://studentshare.org/engineering-and-construction/1453275-quantity-surveyors-role-in-construction-dispute.
  • Cited: 6 times

CHECK THESE SAMPLES OF Quantity Surveyors Role in Construction Dispute Resolution

Effectiveness of Arbitration as an Alternative Dispute Resolution within the UK Construction Industry

Effectiveness of Arbitration as an Alternative dispute resolution (ADR) within the U.... The effectiveness of arbitration as an alternative dispute resolution depends upon these provisions clearly spelt out in the contracts and the effective mechanisms for the arbitration available in the country.... Objectives This paper seeks to analyze the effectiveness of arbitration as an alternative dispute resolution (ADR) within the U.... 9) stated “Arbitration is the most traditional and well-known form of alternative dispute resolution....
15 Pages (3750 words) Literature review

Law and Contract Strategy

In the construction sector, all details necessary to reflect the intents, timetable, insurance, or dispute settlements are considered essential elements.... A construction contract is complex because it involves numerous parties (e.... engineer, quantity surveyor, etc....
12 Pages (3000 words) Essay

Design and Build Procurement Strategy

The delivery would introduce a combination of design, permit and construction schedule identified in a traditional environment over a process that would inspire further trust in subcontracting with on-site personnel; engineers and architects.... A construction-led design-build process saves time as the construction firm allows designs which they are technically capable of achieving, thus, the multiparty effort cancels out any need for retraining....
6 Pages (1500 words) Coursework

Effectiveness of Arbitration as an Alternative Dispute Resolution

This research paper "Effectiveness of Arbitration as an Alternative dispute resolution" seeks to analyze the effectiveness of arbitration as an alternative dispute resolution (ADR) within the U.... The effectiveness of arbitration as an alternative dispute resolution depends upon these provisions clearly spelled out in the contracts and the effective mechanisms for the arbitration available in the country.... 9) stated “Arbitration is the most traditional and well-known form of alternative dispute resolution....
15 Pages (3750 words) Research Paper

Business Proposal for Quantity Surveying in the UK

rom the nature of work, quantity surveying can be defined as a professional practice applied in construction for deliberate planning and organization.... hellip; As the research study declares, LPS is a private practicing firm in the UK, which brings forward consultancy services for construction firms.... nbsp; LPS is a privately owned firm that provides services in quantity surveying to construction clients.... With professional knowledge and expertise, LPS was able to make several construction projects a success....
16 Pages (4000 words) Essay

The Effectiveness of Contractually Governed Partnering in the Construction Industry

undamentally, the partnership is a collaboration among the parties in construction or any other project with predetermined goals, resources, and periods.... The other areas are risk devolution, legal documentation and evidence and resolution of conflicts, and reduction of tension among partners.... "The Effectiveness of Contractually Governed Partnering in the construction Industry" paper seeks to establish the effectiveness of contractually governed partnering arrangements in the UK construction sector....
57 Pages (14250 words) Dissertation

Role of Client Quantity Surveyor

hellip; Modern quantity surveyors play an integral role in managing construction projects.... nbsp; quantity surveyors manage all costs that are related to construction projects right from the initial calculations up to the final or last figures.... When a particular construction project is in progress, quantity surveyors are entitled to keep track of all variations to a contract that may possibly affect costs and also create reports that show profitability....
7 Pages (1750 words) Case Study

Surveying - Dilidtins Process in Property

… The paper "Surveying - Dilарidаtiоns Рrocess in Property" is a perfect example of an assignment on engineering and construction.... The paper "Surveying - Dilарidаtiоns Рrocess in Property" is a perfect example of an assignment on engineering and construction.... Surveyors correlate and collaborate with other professionals including architects engineers, local planning bodies, and construction workers to make sure that structures are designed and built in accordance with existing building regulations....
11 Pages (2750 words) Assignment