Project management: Risk management - Assignment Example

Cite this document
Summary
The process of digging the site will usher in the eventual building. The building will start with the foundation structure, which lays the basis upon which the entire structure…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97.6% of users find it useful
Project management: Risk management
Read Text Preview

Extract of sample "Project management: Risk management"

Project management: Risk management  How the process will be implemented The process of designing the entire house shall be followed by the real actualization of the project. The process of digging the site will usher in the eventual building. The building will start with the foundation structure, which lays the basis upon which the entire structure shall revolve around. The tunneling of trenches shall be followed by the erection of walls and roofs. The walls shall be plumbed with proper sheathing as the roofs are competently fitted into convenient trusses (Reinhardt, 2008).

  After the completion of the foundation, proper design shall be carried out to ensure that the living room, the garage, the storage rooms as well as the bathrooms and kitchens are fitted with adequate drainage channels to ensure that the various wastes being emitted are correctly dumped. It is important to make sure that water does not dampen the entire site particularly in colder environments. Freezing pipes along with foundation damage can be as a result of the failure to decisively plan at this phase.

Keeping the site dry as well makes sure that there is no trace of moist wood, which attracts termites and other harmful creatures in any type of weather (DiDonno & Sperling, 1987). Each apartment or section of the house shall also be evaluated to fix and implement proper cabling for electrical purposes. The structure will then be firmly set by building exterior features for instance doors and windows. Painting of the roofing makeup will then ensue. It is critical to keep water away from your home, especially in colder climates.

Freezing pipes and foundation damage can result from a failure to plan at this stage. You want to keep your basement dry and lessen the chance that you will have damp wood, which invites termites in any climate (Rentz, 2011).  Installation of HVAC and air handlers shall ensue. This will be followed by establishment of insulation. Proper ceilings shall be fitted followed by the plumbing features for instance bathtubs and, shower enclosure. Painting of the walls shall commence immediately and flooring will be installed.

Problems associated with the processThe construction of the house at a total cost of $80,000 is not without some hitches – all projects do experience some difficulties. There is the unexpected disaster that may arise from the blatant mischief of workers or from the natural causes. This will heavily affect the entire venture. Natural causes for instance floods and earthquakes are not premeditated and they may cause large-scale damage on the project (Ruiz, 2005). However, manmade errors also may have a negative effect on the project.

Such include vandalism and blatant naughtiness from the workers hence sabotaging the entire project and incurring more costs attributable to the fact that the damaged products or items have to be replaced. The environmental impact of the entire housing project as well may be a problem especially if the structure or the project interferes with the ecological system. How to solve the expected difficultiesA home insurance is vital since it covers the project until its completion. This offsets or covers against unanticipated loss that may comprise damages from fire, disaster, wreckage and nasty misbehavior.

There is also a need to secure the appropriate construction permits that include a septic tank sanction, an electrical permit to safeguard incase of faulty equipments along with a plumbing permit that will be of help if the plumber does not fit the equipments as entailed. An environmental certification along with an impact permit from the relevant authorities will hugely aid in the entire process. This can be achieved by having the house site marked before obtaining the relevant permits that will help to clarify details in the ecological permitting procedure (Devloo, 2008).

 ReferencesDevloo, M. G. (2008). Casa construction: English-Spanish residential construction reference manual, volume 1: exterior construction. Avon, CO: GroundUP Engineering.DiDonno, L., & Sperling, P. (1987). How to design&build your own house. New York: Knopf.Reinhardt, D. (2008). How to build a house: A novel. New York: Wendy Lamb Books.Rentz, G. M. (2011). How to build a house: A practical, common-sense guide to residential construction. Bloomington [Ind.: iUniverse.Ruiz, F. P. (2005).

 Building an affordable house: Trade secrets to high-value, low-cost construction. Newtown (CT: Taunton Press.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project management: Risk management Assignment Example | Topics and Well Written Essays - 500 words”, n.d.)
Project management: Risk management Assignment Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/business/1690177-project-management-risk-management
(Project Management: Risk Management Assignment Example | Topics and Well Written Essays - 500 Words)
Project Management: Risk Management Assignment Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/business/1690177-project-management-risk-management.
“Project Management: Risk Management Assignment Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/business/1690177-project-management-risk-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project management: Risk management

Risk Management and Quality Management Techniques

hellip; In this case study we analyse the local hospital's initiatives by applying quality and risk management concepts, measures, and tools.... In case of risk management planning they decided to embark on a nine months plan to measure, analyse and improve the quality of patient care for the ED.... Keywords: excessive waiting, risk management, quality management, risk analysis, Monte Carlo analysis, quality standards, Top 10 Risk Item Tracking tool, Patient's satisfaction....
4 Pages (1000 words) Case Study

Risk Management Process

Role of Risk Management in Overall Project management Risk management is done by all stakeholders involved in the project.... risk management Process (Name) (University) (Course) (Tutor) (Date) Introduction This paper analyzes the concept of risk management process, as well as the role of risk management in overall project management.... risk management process cycle in a company is also examined.... hellip; risk management activities in project life cycle are also identified....
3 Pages (750 words) Research Paper

Discuss the risk management process and its interactions with the project lifecycle

risk management and its Role in Project Lifecycle Introduction risk management is a term that is used for the assessment and quantification of the different types of risks that an organisation faces or is likely to face in the coming future.... risk management is a process that leads to identification of the uncertainties that may arise in the future and provide remedies and precautions for handling these risks.... The aim of risk management is to identify the potential risks that the company might face and develop resources for mitigating the adverse effects of such losses....
9 Pages (2250 words) Essay

Analysis of the Impact of Stakeholders on Project Delays and Increased Cost in the Transport Sector

This forms part of risk management.... A project management Study of Impact of Stakeholders on Project Delays and Increase Cost in Transport Sector Name: Course: Date: A project management Study of Impact of Stakeholders on Project Delays and Increase Cost in Transport Sector Background For purposes of research the scope of the meaning of a stakeholder has to be defined.... Lack of preparedness in managing any risks associated with a project constitutes poor project management....
6 Pages (1500 words) Research Proposal

Project Management and Risk Management

risk management plays one of the most important roles in the overall project management.... t is further argued that the project managers ignore the issues like risk management associated with the projects because they want them to kick start the process as soon as possible ignoring the issues of great importance which can have the powers to seriously hamper the progress of any project.... It is often argued that the project managers forget to include the risk element into the overall project management and often face situations for which they are unprepared to deal with....
6 Pages (1500 words) Essay

Create Project Activities List and Network Diagram

Presently, the project is at a stage where the specific activities that would get the actual construction are going to be listed.... More to the listing of the activities, a… Among the grouped activities also, there are specific activities under each group that can stand alone to as it is, represent the purpose and ACTIVITY LIST AND project NETWORK DIAGRAM The proposed project of building a generator has seen a lot of progress through its developmental stages....
2 Pages (500 words) Essay

Programme and Project Management Maturity Model

XELOS Limited (2013) reported that P3M3 involves three types of managements such as, 1- Portfolio Management (management control, financial management and benefits management), 2- Programme Management (financial management, risk management and stakeholder engagement) and 3- Project Management (risk management, organizational governance and resource management).... project management is conceptualized as general purpose management tool that can help the project management team to successfully complete the projects and meet the requirements of stakeholders....
6 Pages (1500 words) Essay

Risk Management Process for IT Project Management

The author of the paper "risk management Process for IT Project Management" will begin with the statement that information technology project management is not free from risks which over time, if not well managed, will threaten the overall project life-cycle.... hellip; The main focus of this paper entails risk management specifically to IT projects.... It assesses the aspect of risk management from the perspective of IT project management.... In order to conceptualize the thesis statement, the paper deciphers information on knowledge management on risk management in IT projects implementation processes....
6 Pages (1500 words) Literature review