Project management: Risk management - Assignment Example

Comments (0) Cite this document
Summary
The process of digging the site will usher in the eventual building. The building will start with the foundation structure, which lays the basis upon which the entire structure…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER97.8% of users find it useful
Project management: Risk management
Read TextPreview

Extract of sample "Project management: Risk management"

Project management: Risk management  How the process will be implemented The process of designing the entire house shall be followed by the real actualization of the project. The process of digging the site will usher in the eventual building. The building will start with the foundation structure, which lays the basis upon which the entire structure shall revolve around. The tunneling of trenches shall be followed by the erection of walls and roofs. The walls shall be plumbed with proper sheathing as the roofs are competently fitted into convenient trusses (Reinhardt, 2008).  After the completion of the foundation, proper design shall be carried out to ensure that the living room, the garage, the storage rooms as well as the bathrooms and kitchens are fitted with adequate drainage channels to ensure that the various wastes being emitted are correctly dumped. It is important to make sure that water does not dampen the entire site particularly in colder environments. Freezing pipes along with foundation damage can be as a result of the failure to decisively plan at this phase. Keeping the site dry as well makes sure that there is no trace of moist wood, which attracts termites and other harmful creatures in any type of weather (DiDonno & Sperling, 1987). Each apartment or section of the house shall also be evaluated to fix and implement proper cabling for electrical purposes. The structure will then be firmly set by building exterior features for instance doors and windows. Painting of the roofing makeup will then ensue. It is critical to keep water away from your home, especially in colder climates. Freezing pipes and foundation damage can result from a failure to plan at this stage. You want to keep your basement dry and lessen the chance that you will have damp wood, which invites termites in any climate (Rentz, 2011).  Installation of HVAC and air handlers shall ensue. This will be followed by establishment of insulation. Proper ceilings shall be fitted followed by the plumbing features for instance bathtubs and, shower enclosure. Painting of the walls shall commence immediately and flooring will be installed.
Problems associated with the process
The construction of the house at a total cost of $80,000 is not without some hitches – all projects do experience some difficulties. There is the unexpected disaster that may arise from the blatant mischief of workers or from the natural causes. This will heavily affect the entire venture. Natural causes for instance floods and earthquakes are not premeditated and they may cause large-scale damage on the project (Ruiz, 2005). However, manmade errors also may have a negative effect on the project. Such include vandalism and blatant naughtiness from the workers hence sabotaging the entire project and incurring more costs attributable to the fact that the damaged products or items have to be replaced. The environmental impact of the entire housing project as well may be a problem especially if the structure or the project interferes with the ecological system.
How to solve the expected difficulties
A home insurance is vital since it covers the project until its completion. This offsets or covers against unanticipated loss that may comprise damages from fire, disaster, wreckage and nasty misbehavior. There is also a need to secure the appropriate construction permits that include a septic tank sanction, an electrical permit to safeguard incase of faulty equipments along with a plumbing permit that will be of help if the plumber does not fit the equipments as entailed. An environmental certification along with an impact permit from the relevant authorities will hugely aid in the entire process. This can be achieved by having the house site marked before obtaining the relevant permits that will help to clarify details in the ecological permitting procedure (Devloo, 2008). 
References
Devloo, M. G. (2008). Casa construction: English-Spanish residential construction reference
manual, volume 1: exterior construction. Avon, CO: GroundUP Engineering.
DiDonno, L., & Sperling, P. (1987). How to design&build your own house. New York: Knopf.
Reinhardt, D. (2008). How to build a house: A novel. New York: Wendy Lamb Books.
Rentz, G. M. (2011). How to build a house: A practical, common-sense guide to residential
construction. Bloomington [Ind.: iUniverse.
Ruiz, F. P. (2005). Building an affordable house: Trade secrets to high-value, low-cost
construction. Newtown (CT: Taunton Press. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project management: Risk management Assignment Example | Topics and Well Written Essays - 500 words”, n.d.)
Project management: Risk management Assignment Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/business/1690177-project-management-risk-management
(Project Management: Risk Management Assignment Example | Topics and Well Written Essays - 500 Words)
Project Management: Risk Management Assignment Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/business/1690177-project-management-risk-management.
“Project Management: Risk Management Assignment Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/business/1690177-project-management-risk-management.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document

CHECK THESE SAMPLES OF Project management: Risk management

Risk And Project Management

...?Review of Academic Literature Risk management and project management in the events industry Risk is an element that is present in all human endeavour. “Risk, which is uncertainty that has been defined, is a simple concept, a way of thinking through and planning a program or project” (Barkley, 2004, p. 1). All activities contain an element of uncertainty, particularly projects which are time limited and undertaken to arrive at a single goal. Because of the high level of uncertainty, there is also perceived a high level of risk. There is therefore the imperative to try to understand and...
20 Pages(5000 words)Literature review

Project Risk Management

...in their curricula. (Carden and Egan, 2008, p. 310) In a project life cycle, we have a project manager, the customer, and the contractor. Moreover, before making decisions, we have to establish calendars. This has to be constantly consulted to see if the team is working as scheduled. This essay is about project management of an information technology application. There are many risks involved in information technology of an organization. The problem is IT security. The aim of this project management is to find a solution to the risks and threats in an information system of a particular...
8 Pages(2000 words)Coursework

Project risk management

...? PROJECT RISK MANAGEMENT Part Project risk management is an essential aspect of project execution. Risk management is among the ten knowledge scopes described in PMBOK. Project threat can be described as an unexpected event or action that can impact the project's development, result or effect in a constructive or unconstructive way (Barkley, 2004, Pg. 3). A risk can be evaluated using two factors: probability and impact. Risk management is the detection, evaluation, and prioritization of threats followed...
10 Pages(2500 words)Essay

Project management risk management

...11.06.06 Project Management/Risk Management At times we realize the planning in advance for the uncertain events of our life. Just as we plan for unforeseen events in our life, project managers also need to prepare for uncertainties affecting their project. All project management skills of a project manager can fall flat in the face of uncertainties and unplanned problems. Any project can encounter uncertainties in the form of increased costs, schedule delays and diminished qualities. Unless tackled these uncertainties can lead to major...
5 Pages(1250 words)Essay

Project Management Risk Management

...Risk Template Risk Management plays one of the most important roles in the overall project management. It is often argued that the project managers forget to include the risk element into the overall project management and often face situations for which they are unprepared to deal with. In order to effectively control the project, it is of great importance that the project managers must clearly identify the risks before starting the project and outline their responses against the various...
6 Pages(1500 words)Essay

Risk Management & Project Management

...Uncertainty is defined as an absence of information, knowledge, or understanding regarding the outcome of an action, decision, or event. Risk is actually a measure of the amount of uncertainty that exists. Risk is directly tied to information. Risk is lower with more information and higher with less information. Risk relates primarily to the extent of the ability of a project manager to predict a particular outcome with certainty. The effects of risk can be positive or negative. Positive effects of risk are often referred to as opportunities. Threats are the negative-or "downside"-effects of...
2 Pages(500 words)Essay

Project Risk Management

...Project Risk Management The essay aims to address a two-fold objective to wit to discuss the importance of Monte Carlo techniques and (2) to explain the Risk Response Matrix using information from outside sources. Project Risk Management 1. When using the Monte Carlo technique, why are the "inputs" so important? Monte Carlo is a method that provides approximate solutions to a mixture of mathematical equations using statistical sampling experiments or also known as statistical simulation methods. The method makes use of sequence of random numbers to complete the simulation and probability to solve the problem. Therefore,...
1 Pages(250 words)Assignment

Personal Risk Management Project

...The family and their risk management Solution a) the principal (P) = $3,500 + 50% of $3,500 = $5250 The rate(R) = 8% Time(n) = 20 years Using Amount(A) = PRn = 5,250(1.08)20 = $24,470.0 Solution 1 b) Human life value of Sarah Smith = 55% of $90,000 and Interest rate is 5% = $16,36765 Solution 1 c) benefit per month = $814 Benefit for 120 months ( Future Value) = $814 x 120 = $97,680 PV = FV/(1+r)n Where r = 6% and n = 10 PV = 97680/1.0320 = $54,083.05 Solution 1 d) Bobs’ should take a policy higher the $50,000. considering his income and future inflation the insurance cover should be his average income divided by 8% added to his outstanding mortgages... . The...
2 Pages(500 words)Speech or Presentation

Advanced Project and Risk Management

...Advanced Project and Risk Management Table of Contents Table of Contents 2 Part 4 Introduction 4 2 Brief Overview of the Case 4 2.2 AnalysingKey Aims of the IT Programme Project 5 3.1 Critical Evaluation of the Case through Theoretical Lens 6 3.2 Project Control Theory 7 3.3 Project Management Office 9 3.4 Measuring Impact of an Organisation’s PMO 9 4.1 Conclusion 13 5.1 Recommendations 13 References 15 Bibliography 19 Part 2: 21 1. A Scope statement of the Project Plan 21 1.1Project Initiating Process 21 1.2 Project Planning Process 22 1.3 Project Executing...
20 Pages(5000 words)Assignment

I.T. Project Risk Management

...I.T PROJECT RISK MANAGEMENT Currently, knowledge has been earmarked as an indispensable ingredient to innovative companies and to their overall objective of maintaining a competitive advantage over their rivals. In particular, knowledge has become an important factor in the development of dynamic key competencies, as well as the vocal point for companies to meet their global ambitions (Talet, Zin & Houari, 2014). IT, in particular, has become an important tool in all-important sectors, and any organization will highly feel the impact of any failure of IT project management on competitive advantage. California Technology Agency (2011) asserts that most of...
1 Pages(250 words)Research Proposal
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Let us find you another Assignment on topic Project management: Risk management for FREE!

Contact Us