StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Nobody downloaded yet

Fire Safety Strategy for Students Academic Building - Article Example

Cite this document
Summary
The paper "Fire Safety Strategy for Students Academic Building" discusses that the constructional elements of the buildings should have a minimum of 60-minutes for the fire resistance time. For the higher fire risk areas, the minimum time should be 30-minutes for effective fire resistance. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.4% of users find it useful

Extract of sample "Fire Safety Strategy for Students Academic Building"

Download file to see previous pages Each floor has a height of approximately 4m with the basement being 4m deep, the total height of the building is 16 meters with an overall dimension area of 3249m2. This firing strategy has been developed to meet the Building Regulations requirements based on the codes and guidance of the Approved Document B (ADB). The ADB classifies this building as a college of higher education under group purpose 5 of assembly and recreation.
2.0 CLIENT REQUIREMENTS

This firing strategy aims at achieving the following client requirements for the Uclan Academic Building:
• The clients wanted a reduction in the cost of fire protection systems as well as the avoidance of the use of sprinklers unless when necessary.
• The client does not want any changes to be made to the surrounding buildings
• The client does not want the buildings’ fire alarms to be linked to those of the neighboring buildings.
2.1 Project Description
The design of the building is an open plan with a spacious atrium with balconies on the upper levels. Some of the facilities present include:
• Science Laboratory
• Workspace for groups
• Dining and Cafés
• Classrooms and lecture theatres
• IT facilities
• Staff facilities and offices
• Medical services
The building has five floors:
• Basement-level 0
• Ground floor –level 1
• First floor- level 2
• Second floor-level 3
• Third Floor-level 4
3.0 KEY ISSUES FROM THE INITIAL STUDY.

The initial study carried out on the building identified the following key issues on a range of probable solutions for the final design of the building under guidance from the Approved Document B (ADB).
• Ventilation systems
• Compartmentation
• Means of escape stairs
• Smoke control systems
• Mean of escape stairs
• The open spatial design which has the possibility of increasing smoke spread in the early stages of fire development

This paper explores the fire safety requirements for the buildings as the recommendations address the need for reducing the impact of fires together with the issues of business continuity and property protection. All these concerns have to be addressed to ensure the client can clearly understand the benefits and risks of providing additional safety measures. The building has to meet the specific standards and requirements of the ADB Volume 2. This compliance will lead to satisfactory safety for the building and its occupants. Failure to comply on the other hand can result in risks to occupants as well as the building. ...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Applying Fire Strategy To This Acadmic Building, n.d.)
Applying Fire Strategy To This Acadmic Building. https://studentshare.org/architecture/2054771-applying-fire-strategy-to-this-acadmic-building
(Applying Fire Strategy To This Acadmic Building)
Applying Fire Strategy To This Acadmic Building. https://studentshare.org/architecture/2054771-applying-fire-strategy-to-this-acadmic-building.
“Applying Fire Strategy To This Acadmic Building”. https://studentshare.org/architecture/2054771-applying-fire-strategy-to-this-acadmic-building.
  • Cited: 0 times

CHECK THESE SAMPLES OF Fire Safety Strategy for Students Academic Building

Fire Technology

Small premises can adopt a general fire notice while a large premise can adopt a staff fire notice (fire safety Advice Centre, 2011).... ny organization should have a fire emergency evacuation plan (FEEP) that entails the action the staff and occupants of a given building should take in the event of fire and the arrangements for calling the fire brigade.... Actually, the Fire Technology Department at Victor Valley College offers training and educational opportunities to students....
5 Pages (1250 words) Research Paper

Fire Risk Management in Students' Hostels

The detailed description of activities and responsibilities form a Strategy Action Plan for the authorities responsible for fire safety in our hypothetic students' hostel.... This essay discusses fire risk management in students' hostels.... A strategy and practical methods for avoiding and mitigating undesirable hazards constitute the area of risk management.... owadays safety, health, and welfare are widely used as major dimensions of the approach to risk management in the workplace....
10 Pages (2500 words) Research Paper

Fire Protection in Academic Building

This paper is intended at providing a detailed and well-documented proposed fire safety strategy for a four-storied academic building that is proposed to be built on the existing university campus.... This paper is intended at providing a detailed and well-documented proposed fire safety strategy for a four-storied academic building that is proposed to be built on the existing university campus.... This paper is intended at providing a detailed and well-documented proposed fire safety strategy for a four-storied academic building that is proposed to be built on the existing university campus....
15 Pages (3750 words) Case Study

Fire Protection Strategies in the Building

The paper "Fire Protection Strategies in the Building" is to identify the various fire protection strategies within an academic building and assist in the building's fire management processes.... The building under assessment is an academic building located in the middle of the city providing educational facilities to over 300 students daily.... he analysis of these elements will enable the author to make recommendations to the building's owner on the reliability of their fire protection strategy....
17 Pages (4250 words) Case Study

Means of Escape and Evacuation Strategy for the Academic Building

The author of the current paper under the title "Means of Escape and Evacuation Strategy for the academic building" provides an overview of the building before touching on the means of escape and evacuation strategies, and the concluding remarks.... This report is a thorough review of issues related to the means of escape of an academic building.... The building in consideration is an academic building within the University campus that will be used primarily by students....
9 Pages (2250 words) Term Paper

Fire Safety Strategy for an Education Center

IntroductionThe proposal for the construction of an education center structure is plan to build and academic building unit that will comprise of the teachers, mess and the student section.... IntroductionThe proposal for the construction of an education center structure is plan to build and academic building unit that will comprise of the teachers, mess and the student section.... The academic building consist of 3 floors where there is the basement, the first floor, the second floor and the third floor making the last section upward....
22 Pages (5500 words) Assignment

External Fire Spread between Buildings and Determination of Unprotected Areas

The fire safety strategy, therefore, has been designed to meet the conditions of building regulations.... IntroductionThe aim of this project is to guide the users concerning the fire safety tragedy of an academic building with a capacity of six thousand people.... This will undoubtedly help them to apply in real life situation and escape safely in case of IntroductionThe aim of this project is to guide the users concerning the fire safety tragedy of an academic building with a capacity of six thousand people....
15 Pages (3750 words) Assignment

B5 Facilities and Access for Fire Service

In the case of an academic building, the specification may vary in that the area always has more than 280m2 and have no fire mains established, the extra hydrant should therefore meet the following (ADB, 2013, par 15.... For the purposes of fighting a fire in the shafts of a building, ADB recommends that a provision of fire mains should be of essence (ADB, par 15.... This is affirmed in accordance with Part B of Schedule 1 of the building Regulations 2010 which provides an understanding regarding functional needs for what the regulation terms as 'LIFE SAFETY....
7 Pages (1750 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us