Time Delay Disputes in Construction Contracts - Assignment Example

Cite this document
Summary
The construction industry is one of those industries that is prone to time related delays and even disputes. It is therefore important for all the stakeholders to be well informed about the steps and procedures available to them in case such scenarios arise.
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.6% of users find it useful
Time Delay Disputes in Construction Contracts
Read Text Preview

Extract of sample "Time Delay Disputes in Construction Contracts"

Download file to see previous pages

Internal environments usually consist of scheduling issues; i.e. if the construction process was poorly scheduled. Additionally, it may comprise of certain financial problems or changed orders. Exogenous factors largely consist of external elements such poor weather or government laws and regulations. Inputs factors that may lead to delays in construction are largely related to the issue of manpower shortage. (Sweis, 2008) In other words, delays may either be non excusable or excusable. For instance, when a delay is caused by labour disputes, unusual deliveries, and transportation deals that had not been foreseen or other causes that could not be predicted, then the affected party can consider forgiving the offending party.

However, in other instances, then delays cannot be excused by the offending party. For example, when delays occurred during ordinary weather or when the subcontractor failed to meet his/her end of the bargain. It is also inexcusable to delay a construction if the project site was poorly coordinated. This may also be a problem when the contractor fails to finance the project properly or when there was poor workmanship, delays in material acquisition among others things. When a delay is caused by any of the latter factors, then it is likely that that person found guilty of the offense will be liable to pay damages.

(Fewings & Jones, 2005) The first aspect that is involved in dealing with the disputes is mitigation of its effect. It is likely that the construction process may still be underway. Consequently, the affected parties have to look for ways in which they can minimise the distractions that would lead to further delay or that would cause ultimate project failure. (Kamara, 2002)The next thing that needs to be done is to determine the root cause of the problem. One must be able to determine whether the causes of these delays are actually excusable or not.

This is usually done by conducting a detailed evaluation and analysis of the construction site, the contractors, the subcontractor, workers, materials and all other interests groups required to make the project complete. It is usually plausible to break down all the disputes involved in the process little by little. This is because certain events may have caused different delays. Additionally, to effectively solve disputes, it is necessary to assess the overall liability involved and the actual damage caused to the affected party.

Thereafter, the two parties in the construction process are usually required to take part in a settlement agreement. This will require legal consultants who will be able to voice the concerns of each of the affected parties. At that time, it may be also be necessary to consider the legal representatives for each party as there is a whole team involved in the dispute resolution mechanisms. The assembly of this team may usually be necessary in mediation cases rather than in settlement arrangements.

(Iyer, Chaphalkar & Joshi, 2008)However, in the event that a dispute is quite severe or when the affected parties have failed to reach a compromise, then these two parties will be required to take their case to court. This usually occurs when the dispute has resulted in litigation in the part of the affected party. Usually, judges will listen to their respective cases and then come up with possible explanations about what could have caused

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Time Delay Disputes in Construction Contracts Assignment”, n.d.)
Time Delay Disputes in Construction Contracts Assignment. Retrieved from https://studentshare.org/miscellaneous/1519698-time-delay-disputes-in-construction-contracts
(Time Delay Disputes in Construction Contracts Assignment)
Time Delay Disputes in Construction Contracts Assignment. https://studentshare.org/miscellaneous/1519698-time-delay-disputes-in-construction-contracts.
“Time Delay Disputes in Construction Contracts Assignment”, n.d. https://studentshare.org/miscellaneous/1519698-time-delay-disputes-in-construction-contracts.
  • Cited: 0 times

CHECK THESE SAMPLES OF Time Delay Disputes in Construction Contracts

The Role of the Contract Administrator under a JCT Traditional Contract

Examine the role of the contract administrator under a JCT traditional contract in terms of the functions, duties and powers that he is granted as well as the potential liabilities that may occur if he does not act appropriately. The Joints Contract Tribunal or JCT was… JCT produces the contract documentation and through the documents highlights the role of the contract administrator as well as his Most JCT contracts would require the employment and contribution of an architect or a contract administrator who would administer the contract....
9 Pages (2250 words) Essay

Common Issues Arising in Construction Contracts

Ans 1: The Draft protocol was devised with the intent of providing guidance on common issues arising in construction contracts, so that parties can use such guidance as a tool and avoid disputes.... Since the provisions of the protocol are intended to be a guidance tool, they end up creating more confusion on some aspects rather than resolving them. Construction projects cannot be placed on par with other kinds of projects because delays in construction and claims arising out of such delays have always been an integral part of construction law....
9 Pages (2250 words) Essay

Construction Contract Law: Kodex Atlantic Ltd and Texas Engineering Corporation

Therefore, the current essay will shed the light on the construction of the legal contracts.... The purpose of this paper "construction Contract Law: Kodex Atlantic Ltd and Texas Engineering Corporation" is to describe a particular case study on the legal contract between the two corporations....
14 Pages (3500 words) Essay

Construction Law Report

construction contracts often provide for the payment of liquidated damages for certain types of the breach, for example, breaches concerning delays.... Delays in construction result in a loss of time and money for people.... hellip; It hence covers a wide array of legal issues inclusive of negligence, contract, guarantees and sureties, bonds and bonding, liens and other associate security interests, related consultancy contracts and tendering (Koffman & MacDonald 2007)....
7 Pages (1750 words) Essay

Construction Contracts in Context

Since the adjudicator is technically qualified rather than legally qualified, matters arsing in construction contracts being mostly technical in nature and having the sanction of law, the adjudication in fact amounts a hybrid form of expert determination and arbitration subject to challenge in subsequent proceedings in arbitration or litigation.... The JCT has therefore rightly incorporated the adjudication requirement in construction contracts.... nbsp;… Adjudication especially meant for construction contract has been purposely provided for as a stop-gap arrangement for relief to the aggrieved party so that, if necessary, the adjudication order can be challenged....
14 Pages (3500 words) Assignment

Analysis of Construction Contract

This paper discusses types of construction contracts and their impacts.... Legal issues can be very problematic and thus contracts are introduced to make safe agreements between two parties.... The types of construction projects that use the contracts have clients with different requirements that are to be included in each type of contract.... Also, the paper analyses the significance and benefits of the construction contract....
11 Pages (2750 words) Research Paper

Contracts and Dispute Resolution

The paper "contracts and Dispute Resolution" discusses that the employer's decision to deduct liquidated damages at the rate of $25,000 per week as provided in the contract even after the contactor had sent a notice of adjudication is something that is not vali.... In the hypermarket construction contract, the bad weather is an excusable delay, while the general delays are inexcusable since they come from the side of the contractor.... Even after being issued with the notice for adjudication, it responded by claiming that there is no dispute on the grounds that the contract administrator had properly done his work when assessing the time extension required for the contractor to finish his duty even after the delays....
8 Pages (2000 words) Report

Project Managment Adjudication

uring the meeting, understanding statutory arbitration processes within the Housing Grants, Construction and Regeneration Act, Local Democracy, Economic Development and Construction Act and Finally, The Schemes for construction contracts is critical to enable effective adjudication procedures and implementation effective resolutions (Papakonstantinou, 2014, p.... Remarkably, HGCR Act 1996 states the removal of requirements for construction contracts should be in writing and strongly applies in your case....
9 Pages (2250 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us