StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Project Management - Controlling Project / Project Scope - Assignment Example

Cite this document
Summary
Project management is a systemic discipline of planning, organizing, securing, managing, supervising, leading and controlling and/or budgeting for resources to achieve a specific goal, the project under construction. The project has a time limit under which it has to be…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.4% of users find it useful
Project Management - Controlling Project / Project Scope
Read Text Preview

Extract of sample "Project Management - Controlling Project / Project Scope"

Project Management Number: Lecturer: Controlling Project Project management is a systemic discipline of planning, organizing, securing, managing, supervising, leading and controlling and/or budgeting for resources to achieve a specific goal, the project under construction. The project has a time limit under which it has to be implemented and with definite resources allocated to it intended to result in a final project which can be used for the purpose that is intended to serve. The implementation has a defined beginning and the end with equally defined or limited resources.

The project can be a public intended to add value to the general society implemented by state or local government and the intended purpose it is supposed to offer or private project for a business purposes.As mentioned a project has to be implemented within a specified time and the only the budgeted amount to be spent as planned but this may not be so. Some issues might hinder the project implementation causing delays in completion. We will consider a project before discussing how delays come about and ways to control it from such delays.

Imagine a construction of five hundred public housing units in an annexed near a town sponsored by a local authority area which was a bare land having not previously not had any infrastructure. The project then needs architects to design the houses, civil engineers to design, among other developments, access roads, electricity lines, sewerage system and communication lines or system. Electricity line and communication lines require electrical and communication engineers. The area has to be cleared first and shaped in manner to consider the how the housing should look like.

The project manager will consult all these experts in the design and construction process. Some of the reasons that cause delay in the construction of these housing units can arise caused by the contractor, the owner of the project (local authority) or natural causes which are beyond either of the two. The contractor may not adequately plan the construction and in the process the contractor faces new realities on the ground that may require more work. The ground might not be firm enough to sustain building or the ground might be rocky with huge stones which might need to be removed from the site or the construction area moved to a new place all together.

This will involve adjusting the budget to include the expenses on the changes. On the other hand the contractor implementing the project might lack the necessary capacity to complete the entire project. The workers might lack the skills required, works spending more man hours than planned for and the contractor’s inability to secure enough start-up financing. (Kendrick 48).During execution, some delays might be come about if the supplier does not deliver the scheduled materials on time to effect timely construction, the equipment being used might break down if they are old or misused and some problems might come related to human capital if for example some employees are promoted leaving space to be filled in replacement which might not result in an individual with the right skill.

Still the labor unions might raise employee related disputes resulting in boycott of work. (Kendrick 77).On the other hand the project owner might cause delays. The contractor might decide to change how construction looks like causing design review or the zoning laws change in the process of construction and adjustments have to be effected. The construction might need to be inspected to ensure it conforms to required standards. During the signing stage an agreement is entered into specifying the stages of payments by which the contractor will use in implementing.

If the funds are delayed the contractor might have problems in securing the financing to continue. Some natural delays beyond the hands of either are natural causes like extreme weather conditions which can bring down the entire project or just cause delay due to inability to continue. The project manager can take matters in his own hands to ensure that there is no delay or if there is it is minimized to be able to deliver the project in time to ensure that inspection is done in time the project manager might need to update the inspection authorities beforehand to enable them plan scheduled inspection exercise.

The project manager should ensure before implanting the project that enough capacity is put in place before in terms of finances, manpower and the bright equipment. During the implementation, man hours should be used optimally. (Kendrick 130).Scheduled deliveries can be done well in advance such that the materials are available at the stage when needed. Anticipate client change of mind whenever they wish to improve some designs or anticipate zoning changes from authorities. As a project manager, ensure you have enough finances to implement the changes or even to continue if the client does not pay in time.

Regular discussion with the client can help in having a clear understanding with the client on cost and consequence of changes of all the entire chain effect. (Kendrick 140).Implement the project in time if any natural disaster can cause delay when the weather still allows.Works CitedKendrick, Tom. Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. (2nd ed). USA. New York. Amacom. 2009.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project Management - Controlling Project / Project Scope Assignment”, n.d.)
Project Management - Controlling Project / Project Scope Assignment. Retrieved from https://studentshare.org/information-technology/1609373-project-management-controlling-project-project-scope
(Project Management - Controlling Project / Project Scope Assignment)
Project Management - Controlling Project / Project Scope Assignment. https://studentshare.org/information-technology/1609373-project-management-controlling-project-project-scope.
“Project Management - Controlling Project / Project Scope Assignment”, n.d. https://studentshare.org/information-technology/1609373-project-management-controlling-project-project-scope.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Management - Controlling Project / Project Scope

Cross Cultural Factors Needed for Cross Border Mergers and Acquisitions

This project "Cross Cultural Factors Needed for Cross Border Mergers and Acquisitions" discusses several cases of cross-border M&A which clearly describes the cultural factors that have affected their success many times proving the merger or the acquisition to be a disaster.... Cross border M&A is termed as 'marriage between two culturally separate entities' and endeavors to manage M&A's arise more from the tenets of cross-cultural management than any other factor....
62 Pages (15500 words) Capstone Project

Information system management

n this section I will present the detailed class diagram of CTT project.... In this part I will present a more detailed system design of the CTT origination.... CTT is going to develop an automatic journal publishing and writing system.... I will streamline the main interfaces or system responses through the Use Case diagrams. ...
14 Pages (3500 words) Statistics Project

CQF final Project

Monte Carlo simulation is basic sampling approach to simulating physical phenomenon used in various areas such as risk analysis, financial markets, particle transport, molecular modeling and many other different areas.... Monte Carlo approaches use random sampling to simulate… The example to be used in this section will be bending of a beam....
12 Pages (3000 words) Statistics Project

STA project report:How to increase the win rate of league of legends in rank

Additionally, there are multiple types of statistics gathered for every player.... Such data may include points, rebounds, assists, steals, and turnovers for each game.... hellip; League of legends is fast paced and competitive online game.... Additionally, it is a real-time strategy that comes with role-playing game elements whereby there are two teams of ten champions each with a unique design and play style game Players need to take enemy base down to win....
6 Pages (1500 words) Statistics Project

Project Data Provided on Blackboard by the Instructor

This project is aimed at providing information and analysis about the enrolment trend in a Private College for the 41 years period from the year 1965 to 2005 (both inclusive).... It shows how the trend changed during these 41 years and it also shows the year wise enrolment as well… Suitable graphs are also given along with stem and leaf diagram for the data....
4 Pages (1000 words) Statistics Project

Smoke-Free Illinois

15 Pages (3750 words) Capstone Project

The Development of Human Resources and Sound Management of Economic Factors

This projection is translatable into a high shareholder value figure, and with this figure in mind, performance-based compensation tactic endeavours to respond to the question of how much of the increased shareholder value can be shared, the form such sharing should take.... hellip; In essence, pay for performance programs refer to the strategy of compensation in which the workforce is paid on the basis of productivity contrary to the number of hours spent doing the job or at a standard salary....
10 Pages (2500 words) Statistics Project

Business Statistics for Managers Project Template

The paper "Business Statistics for Managers project Template" presents probability calculations on data for being either a graduate or undergraduate depending on the binomial distribution, cumulative GPA dependence on high school scores regarding independent and dependent variables....
10 Pages (2500 words) Statistics Project
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us