The role of temporary works in civil Engineering Construction - Assignment Example

Cite this document
Summary
Role of contemporary works in Civil Engineering Name Institutional affiliation Scaffolding According to Webster (1997) scaffolding can be describes as the temporary support structures that are usually constructed for example when building a bridge so that it can help to support the bridge workers and the material they are using during their construction…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.8% of users find it useful
The role of temporary works in civil Engineering Construction
Read Text Preview

Extract of sample "The role of temporary works in civil Engineering Construction"

Download file to see previous pages

For example when setting up a scaffold it is advisable that your scaffold is supported by the ground but if that is not possible one can make it to hang above the ground or water using the hanging scaffold (Webster 1997). A good scaffold should also be able to have a safety mechanism in order to avoid injuries in case the scaffold fails thus in constructing a bridge one can chose to attach himself to the bridge to be safe incase the scaffold is failing. Formwork In his contribution Blackledge (1977) refers to formwork as the process that involves the addition of base material and also the addition of concrete that is in retaining wall so that they can be used as slabs during the construction of a bridge.

Formwork is very essential since it helps to make the concrete last for long due to the fact that it makes it strong (Blackledge 1977). The strength property of formwork guarantees the much needed support that is needed in construction of the bridge. Formworks is used by making that needed shape using steel or aluminum so that the concrete is then poured into it so that a desired shape is produced. This is then allowed to harden. When it’s all dry the fabrications are removed and the formwork remains in place in that desired shape.

Formwork is used to guarantees the strong support for the bridge during construction which always has to remain strong to avoid collapse (Blackledge 1977). Falsework In his book Webster (1997) talks of falsework as a term that is used to refer to the activity of supporting arches and spans in the process of constructing a bridge by using temporary support structures. This is a very essential practice in construction of bridges since it helps support the bridges from below in order to ensure that the bridges do not collapse as the construction is still continuing and can also be used to create a strong work base for the workers during the process of constructing a bridge.

This always has to remain intact to the construction until that time when the bridge can self support itself without collapsing which in the long run helps to keep the bridge in position (Webster 1997). Temporary Support of Excavation During construction of a bridge it might involve excavating various sections of the work site so as to achieve a certain level of ease during the construction of bridge (Hummell 2011). For example during construction when the building is to start like two stories below the ground then excavation will have to be done in order to achieve this.

Also good to notice is that sometime exaction is done for example when gravel is need for construction so that it is dug from a place. After excavation it’s a good practice to always support the excavations in order to avoid collapse of the walls during construction according to Hummell (2011). There are two types of excavation that can be used in supporting an excavation walls; this can either be flexible support or rigid excavation support. When one uses Flexible support then it would take sheet pilling, soldier pile and lagging walls.

On the other hand rigid support entails slurry walls, secant piles or even tangent pile (Hummell 2011). Construction Dewatering In his deep insight on dewatering Hummell (2011) talks of this process as a way that is used to achieve a certain degree of ease at the work site by ensuring that the water that may cause difficulty during the

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“The role of temporary works in civil Engineering Construction Assignment”, n.d.)
The role of temporary works in civil Engineering Construction Assignment. Retrieved from https://studentshare.org/engineering-and-construction/1471825-the-role-of-temporary-works-in-civil-engineering
(The Role of Temporary Works in Civil Engineering Construction Assignment)
The Role of Temporary Works in Civil Engineering Construction Assignment. https://studentshare.org/engineering-and-construction/1471825-the-role-of-temporary-works-in-civil-engineering.
“The Role of Temporary Works in Civil Engineering Construction Assignment”, n.d. https://studentshare.org/engineering-and-construction/1471825-the-role-of-temporary-works-in-civil-engineering.
  • Cited: 0 times

CHECK THESE SAMPLES OF The role of temporary works in civil Engineering Construction

Erection and Construction Procedure

Author Tutor Course Date Erection and construction Procedure ?... ? Scope The scope of the study lies within the establishment of the causes of accidents in the construction industry.... The study discusses the erection and construction procedure from the designing stage up to the completion stage.... It seeks to establish the recommended procedures for construction of various structures and the guidelines provided to ensure the safety of the workers....
6 Pages (1500 words) Essay

Cause of Collapse of Heathrow Rail Tunnel in 1999

This resulted in one of the worst civil engineering disasters in the last century bearing in mind the fact that the Heathrow accident occurred one month after the Munich disaster.... This should only apply to temporary works (Feld and Carper, 1997.... Among other general failures, the case proved that there was flawed workmanship, which included serious flaws in the management of construction procedures and contract arrangements that failed to meet the standard requirements....
6 Pages (1500 words) Essay

Supply chain management in the uk construction Industry

The council also says that the supply chain management also plays a crucial role in integrating demand and supply management across and within the companies.... The term ‘supply chain' has been used to describe the links that exists among companies in terms of raw materials, products and services (Constructing Excellence, 2004)....
12 Pages (3000 words) Essay

Importance of Management in Civil Engineering

This research paper “Importance of Management in civil engineering” would try to elaborate and evaluate all those necessary steps that should be taken in order to be a successful civil engineer.... hellip; The objective of this study is to highlight and explore all relevant information and perfection tips required to attain quality in civil engineering project management.... It is good enough reason to take place in management development in civil engineering....
22 Pages (5500 words) Essay

THE NEW MUMBAI COLLEGE PROJECT

The dump trucks are earth moving equipments that normally allow the transportation and deposition of materials at construction sites.... The excavator is earth moving equipment that is used for digging works and demolition of structures.... Each types of job require a specific type of earth moving equipment....
16 Pages (4000 words) Assignment

Management Portfolio for a Civil Engineering Project

This portfolio aims at explaining all the strategic civil engineering management systems that are required in completing a particular project.... The purpose of this portfolio is to present in clear terms the necessary steps that should take in carrying out a civil engineering project.... uality Management System: Every civil engineering project requires a lot of quality management strategies.... For example, the construction of London 2012 Olympic Stadium would require that a great deal of time and resources must be pumped into the project to make it safe and healthy for hundreds of thousands of people that would grace the occasion....
14 Pages (3500 words) Assignment

Erection and Construction Procedure

The "Erection and construction Procedure" paper demonstrates the laid down policies and procedures designed for construction.... The study discusses the erection and construction procedure.... nbsp;… On the construction site, there are truly many materials apart from large and heavy equipment.... These materials are required in the construction site for the facilitation of the construction process....
8 Pages (2000 words) Coursework

Civil Engineering Management

"civil engineering Management" paper examines organizational health and safety protocols, performance assessment, performance improvements, health, and safety culture, evidence of continuous improvement, civil engineering project life cycle, and form of contract for engaging the stakeholders.... In the management operations of Visionary construction Company, there exist outstanding recognition on the core elements in the effective management health and safety to include leadership and management, trained human resource, and an environment of trusted and involved personnel....
12 Pages (3000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us