Value Management/ Value Engineering - Assignment Example

Cite this document
Summary
Value Management /Value Engineering Name: Institution: Value Management /Value Engineering 1. Introduction Value management is an organized and structured procedure of team anchored on decision-making.VM focuses at attaining worth for a project or procedure by defining the various components needed to attain value objectives and availing those components at a minimum cost, which are reliable with the anticipated worth and performance…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.3% of users find it useful
Value Management/ Value Engineering
Read Text Preview

Extract of sample "Value Management/ Value Engineering"

Download file to see previous pages

The aspect of VM operates under a well structured schedule of process. This allows the functional needs and alternative resolutions, linked with their costs to be recognized and incorporated to strict timetable (Pinto 2008, p. 128). 2. Defining the Concepts Value management is different from value engineering in that value engineering entails attaining specific functions at reduced cost or holistic life cost while value management entails the process of defining the actual meaning of value within a confined context in the building industry.

The concept of value management ensures that there is definitive agreement of objectives and making sure that the solutions are aligned with these objectives. The value engineering answers on how while value management answers the questions on WHY. Value management concept is a sequence of process with proven techniques that are systematically brought together to recognize better project, services, and the industry projects. Both the VE and VM have the same process thus using the same methodology (Kendrick 2006, p.243). The process of VM works in a top-down approach, which starts from the requirements and the objectives and aims on the root causes and not the signs.

In this process there is an earlier agreement that is developed between the stakeholders concerning the need for the project, the scope, potential outcomes, main functions and risks, in relation the wider business environment (Sham 2008, p.89). There is exploration for potential opportunities for exploration and the most cost-effective approach of implementation is structured, which is reliable with the estimated time and quality of the work to be undertaken. This method in building industry is concerned with the whole project as opposed to the components of the building techniques and in most instances, VM is a process that is based on consensus (Kendrick 2006, p.244). In this process, selection for the workshop is crucial to its effectiveness to ensure that the wide range of impacts are specifically addressed to the individuals with the right skills and knowledge, experiences and judgment skills.

Specific members are chosen to undertake a particular task if the stakeholders are not able to undertake the task. 3.0. Characteristics A well structured value management system has the following characteristics in the building industry: 1. Well defined aims and objectives and the capacity at the outset of the project that focus on the client needs 2. A systematic and well staged strategies to the whole project other than the individual components of the project 3. There is the availability of multi-faceted team efforts that is influenced by positive human flexibility 4.

The process adequately considers of the organizational structure and environment ,which takes consideration of both external and internal environments 5. The element of function analysis 6. Effective use of techniques and tools to promote independent facilitation. 7. A workshop structure that has well defined job plan that distinguishes innovation from assessment and development 4.0. Stakeholders The stakeholders in this project are individuals who have real interest in the project results that might include promoter, supervisor, engineer, and constructor, user of the project, operator and financier.

The project focuses to reflect the holistic key needs and

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Value Management/ Value Engineering Assignment Example | Topics and Well Written Essays - 2000 words”, n.d.)
Value Management/ Value Engineering Assignment Example | Topics and Well Written Essays - 2000 words. Retrieved from https://studentshare.org/engineering-and-construction/1448196-value-engineering-management-theory-and
(Value Management/ Value Engineering Assignment Example | Topics and Well Written Essays - 2000 Words)
Value Management/ Value Engineering Assignment Example | Topics and Well Written Essays - 2000 Words. https://studentshare.org/engineering-and-construction/1448196-value-engineering-management-theory-and.
“Value Management/ Value Engineering Assignment Example | Topics and Well Written Essays - 2000 Words”, n.d. https://studentshare.org/engineering-and-construction/1448196-value-engineering-management-theory-and.
  • Cited: 0 times

CHECK THESE SAMPLES OF Value Management/ Value Engineering

Applied Principles of Value Management and Engineering

This paper "Applied Principles of Value Management and Engineering" is an initial report on the study that the value management and value engineering team conducted on the proposed recreation and commercial center featured in SBE Innovations Project Workshop.... hellip; value management is the first activity that we will apply at the early stage of the project.... Through value management, we can evaluate the different aspects and functions of the construction project....
15 Pages (3750 words) Term Paper

Combining risk assessment and value engineering (this is project risk management class)

The combination of risk assessment and value engineering is of particular importance in ensuring that the benefits of value and risk management are both best delivered in the management of projects.... For value engineering to improve the overall value of the project, risk… An explicit reference to risk assessment at the early stages of a project ensures that the potential risks are understood, and targets identified through enhanced brainstorming.... For over sixty years of existence and use, value engineering is referred to by different names....
5 Pages (1250 words) Essay

Effectiveness and Efficiency of Value Management

Value management, or value engineering, is now a growing trend in the UK construction industry, and its growth has become phenomenal because contractors, facility designers, and clients or buyers of projects have been benefited by it.... The writer of this dissertation "Effectiveness and Efficiency of value management" investigates the value management application in the UK construction industry.... This dissertation will focus on finding information regarding value management and other related topics....
63 Pages (15750 words) Dissertation

Value Management and Value Engineering

This essay demonstrates why risk and value management are closely interrelated and must always be accomplished in parallel.... And also how strategic value management is carried out first, then risk management, in accordance with the various options considered during the strategic values management phase.... nbsp; Furthermore, training programs to be conducted to foster value awareness, both at the top management level and for corresponding levels of the organization....
15 Pages (3750 words) Essay

Value and Risk Management

hellip; Value management and value engineering follow-up study are important innovations in the project management process.... s in the case of the value management study team, in the context of the present MRCC project, value engineering study would be undertaken by a special team to examine the functions and quality of projects to generate practical cost-effective alternatives that meet customer requirements.... In a construction project such as MRCC, value engineering can be applied at multiple occasions during the lifecycle of the MRCC Project....
26 Pages (6500 words) Research Paper

Value and Risk Management

This work called "Value and Risk Management" describes the use of risk and value management by different companies and team members.... From this work, it is clear that proper risk and value management basically maximizes the opportunity and also mitigate and prevent other possible threats.... nbsp;… On the other hand in practice, the value management exercises are basically carried out first in order to determine an exact cause which is responsible for constituting the values to the business mainly from delivery of any project....
10 Pages (2500 words) Essay

Value Management Strategy for Fitness Centre

The paper is on value management/value engineering of the New Cross Community Fitness Center.... The paper is on value management/value engineering of the New Cross Community Fitness Center.... In order to conduct this value management/value engineering of the New Cross Community Fitness Center, some information, data, and materials are gathered.... … The paper "value management Strategy for the New Cross Community Fitness Centre" is a perfect example of a case study on management....
27 Pages (6750 words) Case Study

Value Management and Value Engineering

The project "Value Management and value engineering" proposes the construction of facilities by the local authority, which will provide leisure and communal services to the community.... value engineering is defined as focused on the value and not the cost of a product.... nbsp;… value management is a process that involves a systematic and analytic method that used in order to complete a project with the lowest cost while surpassing set levels of quality and performance....
10 Pages (2500 words) Coursework