Retrieved from https://studentshare.org/engineering-and-construction/1397213-camp-nou-stadium
https://studentshare.org/engineering-and-construction/1397213-camp-nou-stadium.
Camp Nou Stadium Camp nou is the largest football stadium in Spain and the second largest football stadium in Europe. It is located in Barcelona and seats 99354 people in a football match but in any match organized by the UEFA the stadium is reduced to 96336 people per stadium. The stadium has hosted many matches and was one of the stadiums that hosted the 1992 summer Olympics that was held in Spain. Construction of this amazing football stadium started on the 28th match of 1954. This was because the previous Barcelona stadium camp de les corts could not be expanded anymore and so the then government decided to build another bigger stadium that could accommodate all the crazy soccer fans who were increasing in number daily and increased revenue to the government.
This construction began in front of more than 60000 fans of the Barcelona football club team watching the construction. Before the construction began, Archbishop of Barcelona laid the ground with prayers before the civil governor of Barcelona preceded by laying down the first stone to mark the beginning of the construction. The architectures in the team were Francesca Titans, Lorenzo Garcia and Josep soteras. The construction ended on 24 September 1957 and since then it has been the official Barcelona football club stadium.
This means that the construction took more than three years. After its construction, the constructor later had many tenders for more construction and the architects behind the design of the stadium were given several awards for being the best designers. Culture and society The stadium was built in a culture that was characterized by mad football support and competition with opponent football club Real Madrid that at the time had the largest soccer stadium. This led to the Barcelona fans to want a stadium that could host more people and help them be proud of it, as it was larger than the opponent’s stadium.
The construction of the stadium was seen as an opportunity for the reputable Spanish architectures to show off their architectural skills to the population by designing the best stadium ever. Therefore, the panel picked the best stadium that they felt was affordable and could last for a longer period. Foster and collaborates were the contractors they finally won the tender to build the stadium. At the time of its building, many people were fascinated by the way, that football stadiums were being built in Europe starting with the construction of Old Trafford stadium which was one of the state of the art stadiums at the time.
After this, many club supporters across Europe wanted to help in the building of similar stadiums with the same capacity or even more. At this time, there were several universities that offered different courses in architecture and there were different competition on who could design and build the most efficient and best clubs. There were also upcoming technologies that were used in the building process that was of importance. Construction of the stadium Constructed in 1957, the tools and the methods of construction are not so different from those that are currently used.
However, there is a slight difference in the tools, the materials, and the labour that was used. Trucks did transportation and cranes did loading. Since the Portland cement used in the making of concrete was not far from the site off construction, the transportation did not take a lot of time. Cranes were then used to uplift the building materials to greater heights and the major
...Download file to see next pages Read More