StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

A systematic stakeholder management approach in aviation construction projects - Dissertation Example

Cite this document
Summary
This research aimed at differentiating what stakeholders are significant to the project management, what level of risks they may bring and thus their classification on such basis, and develop methodology for systematically managing the stakeholders in projects…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.2% of users find it useful
A systematic stakeholder management approach in aviation construction projects
Read Text Preview

Extract of sample "A systematic stakeholder management approach in aviation construction projects"

Download file to see previous pages

mportance of Stakeholders 5.3.1 Research Question and Hypothesis 1 5.4 Impact of Project Stakeholders 5.4.1 Research Question and Hypothesis 2 5.5 Project Stakeholder Management 5.5.1 Research Question and Hypothesis 3 5.6 Summary Chapter 6: Conclusion, Recommendation, Limitations and further studies 6.1 Introduction 6.2 Conclusion 6.3 Recommendation 6.4 Further studies Reference Appendix Appendix A : Questionnaire ACKNOWLEDGEMENT I would like to thank my supervisor, Dr. XYZ, for all his ideas, discussions and support throughout the research that inspired me to complete my work.

His dynamism, innovation and enthusiasm kept my struggles effective and in right direction. I would also express my gratitude to staff and members of Heriot-watt University for their guidance, assistance and support that helped in making this research work valuable. I am also thankful to all those who have contributed to completion and success of this research project. I am thankful to all the respondents, who have participated and offered their honest and candid opinions in the research surveys and interviews, and without their support and valuable inputs this research would not have completed.

I would specially thank my academic colleagues and friends in Heriot-watt University whose valuable support through frequent discussions created conducive working environment to pursue research goals. Finally, I would express my sincere gratitude to my family and friends for their support which was a source of great strength for me during the research. Family gatherings, arranged during my stressed and work loaded time, helped me to enjoy outside the frame of my research. The love and support that my spouse expressed during the research is invaluable.

He/she patiently listened to my monologues and. The research concluded that the most significant stakeholders with whom higher risks were associated were suppliers, clients and end users of the project. Due to their diverse and varying roles during the entire phases of the project and the tremendous risks associated with their demands and expectations, these stakeholders must be managed from very initial stages of the project. Another barrier to effective stakeholder management was lack of realization that as the project lifecycle progresses the changes have exponential negative impact on project outcomes.

These changes towards the mid and end of the project cause significant increase in cost and delay the project timeline due to discoveries of stakeholder demands that should have been addressed in the initiation and planning stages of the project. The research revealed that planning, evaluation, closing and effective employment of tools and techniques for stakeholder management were the areas that needed improvement. This research is aimed to investigate the management of stakeholders in construction project in global aviation industry.

The aim of this research is to • Identify those stakeholders that are more crucial to the project management and devise a more proactive and focused approach in managing relationships with them. • Determine which stakeholders influence project successful completion and thus developing a more systematic and concentrated risk management approach. • Identify areas that require more concentration to improve project stakeholder management.

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“A systematic stakeholder management approach in aviation construction Dissertation”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1394236-a-systematic-stakeholder-management-approach-in-aviation-construction-projects
(A Systematic Stakeholder Management Approach in Aviation Construction Dissertation)
https://studentshare.org/engineering-and-construction/1394236-a-systematic-stakeholder-management-approach-in-aviation-construction-projects.
“A Systematic Stakeholder Management Approach in Aviation Construction Dissertation”, n.d. https://studentshare.org/engineering-and-construction/1394236-a-systematic-stakeholder-management-approach-in-aviation-construction-projects.
  • Cited: 0 times

CHECK THESE SAMPLES OF A systematic stakeholder management approach in aviation construction projects

Factors Affecting Residential Housing

The factors include the cost of construction, inflation rates, interest rates and real property gains tax and population.... In summary, basing on the multiple regression above it is observed that the cost of construction, inflation rates, interest rates and real property gains tax influence negatively the price of housing.... The coefficient of Determination(R squared) shows that only 4% of the total variation is explained by the cost of construction factor....
6 Pages (1500 words) Statistics Project

Effect of the exchange rates and inflation on the investment

The major objective of this paper “Effect of the exchange rates and inflation on the investment” is to make use of relative form of Purchasing Power Parity in acknowledging whether the prices levels of any fixed basket of products are equal to the Exchange Rate.... hellip; The author states that the necessity of PPP theory in this project arises because it acknowledges the changing patterns of trade usually witnessed between two countries as the result of the difference in inflation rates....
8 Pages (2000 words) Statistics Project

Business stat project

Its results include summaries of trends and analysis of possible differences in variables and their significance for informed decisions.... This discussion offers analysis of data on age,… The discussion is based on the hypothesis that Cadillac has retained control of the segment of older men and has lost the other segment to its competitors and that this is April 27, Business statistics project Statistical analysis is important to managerial decisions as it offersinsights into data....
2 Pages (500 words) Statistics Project

Project Paper Part C

The linear relationship between the credit balance and customer's size of household is established at 0.... 5.... While a perfect positive linear relationship is… at +1, a coefficient variance of 0.... 5 indicates that there is a positive and strong linear-relationship between the credit balance and size of the holding. A coefficient of determination (r2) normally explains the portion of fluctuation (variance) of a particular variable Similar to the coefficient of variation, the coefficient of determination normally ranges between +1 and -1....
9 Pages (2250 words) Statistics Project

Statistics Project, Finance and Accounting

The assumption made in the construction of the frontier is that investment can run on negative portfolio weights, even though the current weights are positive.... The monthly returns for the stocks in the investment pool are calculated with the formula in equation 1 below: Where xp is the monthly expected return, pi is the weight… The values of calculation of the expected monthly returns are presented in the table 1 presented below: The returns computed for the years of this study show the expected return increasing from left to right for all the The stock returns values experience wide variance due to the fluctuation in portfolio weights across the period....
10 Pages (2500 words) Statistics Project

Statistics Project, Finance and Accounting

The objective of the study is to measure the relationship between the risks in the investments and the expected return.... Many models and methods are applied in… The study assists in the selection of the most efficient method for optimizing the portfolio.... The optional methods available include the Classical Mean-Variance, the robust optimization and the In this project, the prices of the stocks provide the weights of the portfolios for all the stocks provided....
11 Pages (2750 words) Statistics Project

Egyptian Stock Exchange

The company is engaged in investment, construction, and management of different projects for the airport and aviation industry.... This statistics project "Egyptian Stock Exchange" analyzes the performance of a company on the stock exchange and determines the performance of the company in the future....
9 Pages (2250 words) Statistics Project

Business Statistics for Managers Project Template

The paper "Business Statistics for Managers Project Template" presents probability calculations on data for being either a graduate or undergraduate depending on the binomial distribution, cumulative GPA dependence on high school scores regarding independent and dependent variables.... nbsp;… A claim was made that the mean high school score for the students is 85....
10 Pages (2500 words) Statistics Project
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us