StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Actual and Potential Project Plans - Assignment Example

Cite this document
Summary
The paper "Actual and Potential Project Plans" states that each and every team requires a strengthened resolve to attain and carry out its mandate successfully. The overall coordination of people and project variables go hand in hand to ensure optimal performance in the overall project…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.2% of users find it useful
Actual and Potential Project Plans
Read Text Preview

Extract of sample "Actual and Potential Project Plans"

This paper will dissect actual and potential project plans. This is with the sole aim of understanding their role in the new world dispensation-based projects. This is with the main aim of gauging what specific people and project variables should be taken into consideration, to ensure the ultimate success of that project.

 The article highlights the inherent need to ensure that all the variables are taken into consideration before project commencement occurs. The understanding of existing variables will create a platform where the team manager and participants will work in areas where they have notable strengths. 

This is in line with the time, money, and eventual positive success of the project. The skills, experience, exposure, number of people working in a team, and how they delegate team duties include some of the people variables in a project. As for the project variables, it should be understood that they are unique to the needs and requirements of the particular project. However, certain variables have maintained consistency in line with what the overall project entails. Some of the notable project variables include the level of accountability and commitment of the team players, the scope of the project, and the time frame set for project execution (Rosenwinkel, 1995). This is also enhanced by the due consideration of the emerging factors in the project like budget and potential or actual application of technology.

 As a team member, one clear observational challenge is the overall lack of coordination between the human and mechanical systems. This creates an observable avenue to perform below expectations in the project. The advice collected from the article highlights the need for the ultimate coordination of people and project-based variables. This is the only way that the project will attain the success that it is required to have. The mechanical resources in any organization aiming to improve the overall stature of the project performance. However, if the people who are supposed to be working with the system do not coordinate their affairs, then it would prove extremely challenging to attain projected results (Rosenwinkel, 1995). This means that the project will spend high amounts of money and time. The overall morale of the team members will be hugely affected by the overall lack of coordination.    

In conclusion, it is clear that as a manager or a team member, different ideals will be experienced at every stage. This will form an active basis for the coordination and relation of the differences with an overall aim of improving performance and results. The utilization of variables will be felt at every stage of the project. The change of the project will rely heavily on the incorporation of varied strategies and results to record perfection and reduce negativity. This focuses on the coordination, analysis, and understanding of the project-based variables and those that are people based.

 

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“611 Assignment 1 Example | Topics and Well Written Essays - 500 words”, n.d.)
611 Assignment 1 Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/business/1617035-611-assignment-1
(611 Assignment 1 Example | Topics and Well Written Essays - 500 Words)
611 Assignment 1 Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/business/1617035-611-assignment-1.
“611 Assignment 1 Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/business/1617035-611-assignment-1.
  • Cited: 0 times

CHECK THESE SAMPLES OF Actual and Potential Project Plans

The Boeing 747 Jet Versus the BAe-Aerospatiale Concorde

Every product and every service has a project plan that shows goals and how the project is to be managed along the way to the final goal.... At the heart of these two planes are the project structures of each and why one was a success and the other a failure.... Every product and every service has a project plan that shows goals and how the project is to be managed along the way to the final goal.... The truth is that sometimes everything can be well-thought out in a project management plan yet there can be a little monkey wrench thrown into the mix that was never seen or envisioned, and a perfectly designed plan can go right down the drain in a flash (Noland 2012a)....
10 Pages (2500 words) Coursework

The Application of Traditional Capital Budgeting Techniques

The paper "The Application of Traditional Capital Budgeting Techniques" discusses that it is necessary to improve the accuracy and reliability of post-completion audits because it is the key tool to evaluate the success of the project executed or investment made.... In this context, the concept of capital budgeting is of considerable significance because it evaluates future cash inflows and outflows on a prospective business project and thereby determines its potentiality....
18 Pages (4500 words) Assignment

Risk Management Plan

Building a high-performing project team is difficult, particularly if few employees work together in the same physical location and.... In every project, there is conflict, either between the project manager and the stakeholders, the project team and the users, or between individual project team members, or indeed, Another area of concern is research and development process.... There are of course many problems, for example, the project may soon be made obsolete by technical developments, or a change in taste by consumers or a competitors new ideas; the policy of the company could also change....
4 Pages (1000 words) Essay

Operations Manager of a Manufacturing Plant

This paper attempts to aid a hypothetical manufacturing plant named Arrow Ahead, a nine-year company whose formerly solid relationship with customers is beginning to weaken due to poor operations management. ... ... n the last board meeting, sales directors presented that a notable.... ... ... During an investigation of the root causes, the board discovers that levels of delivery have been charted to have more valleys than peaks....
17 Pages (4250 words) Essay

The Usefulness of Project Plans

The paper "The Usefulness of project plans" highlights that planning is a critical stage in the entire project management mainly because it explicitly states the requirements, the standards as well as the particular procedures that are going to take place for the completion of the project.... This paper focuses on the analysis of the significant contribution of project plans in project success and emphasizes the critical role of quality plans in the entire planning procedure....
9 Pages (2250 words) Essay

Comparing two projects

The Gautrain Rapid Rail Link presently being completed in the province of Gauteng in South Africa and the A380 project of the European aircraft manufacturing company Airbus exemplify the best technology in modern transportation system.... The Gautrain project was primarily.... It can be said, therefore, that both rojects preceded from necessity but while the Gautrain project is a Public Private Partnership (PPP) between the province of Gauteng and the Bombela Consortium, the A380 is a flagship project of a company whose majority shares are owned by European governments under a “Contractual Partnership....
42 Pages (10500 words) Research Paper

Project Risk Management with Reference to the Stage of Planning in Building/Property Development

In this case, the area was subjected to a freak storm, which caused severe flooding and substantial damage to the properties along the watercourse, including houses close to the watercourse and their contents All projects, whether technological project or property development and management project, are fraught with uncertainties and risks.... Most of the risks associated with the project can be identified at the planning stage.... he decision adopted for design and construction in a project delivery method is based on the budget, scheduling, milestones, risk profile of the project and inspection and certification of the work completed for interim payment....
14 Pages (3500 words) Assignment

The Construction Project: Itaipu Dam

This case study "The Construction project: Itaipu Dam" presents the Itaipu dam in the engineering aspect and its environmental impacts give insight into a lot of information as this paper has revealed.... It's evident that the project resulted in the presentation of one of the Seven Wonders of the World.... In its engineering perspective, the complexity of the project and its expansive nature called for accurate engineering design and the correct choice of equipment and materials....
6 Pages (1500 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us