StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Solution to the hydro-potential assignment - Essay Example

Cite this document
Summary
Bhakra Dam is a concrete gravity-arch dam. The dam was part of the larger multipurpose Bhakra Nangal Project whose aims were to prevent floods in the Sutlej-Beas river valley, to provide irrigation to adjoining states and to provide hydro-electricity.
Construction of the Bhakra Dam was started in the year 1948 and was completed in 1963…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.7% of users find it useful
Solution to the hydro-potential assignment
Read Text Preview

Extract of sample "Solution to the hydro-potential assignment"

Solution to the hydro-potential assignment. Part The water stored at Bhakra has a tremendous potential of generating hydroelectric power. Situated about 13 km upstream from Nangal township, in the northern part of India. The lowest altitude is 252 meters above sea level.Around 53% of the area lies above 300 meters than the lowest level.The total annual rainfall on this area equals 5 million kiloliters of water. The water falls through a height of 310 meters.The potential energy per year given up by this mass of water if it all ran down to the lowest level would therefore be:Potential Energy {P.

E} in Joules= mgh, where m= mass {kg} = density {kg/m3}volume {m3} g = acceleration due to gravity {m/sec2} h =height above the earth's surface {m}1 liter = 0.001 m3 Therefore, converting the volume of water to cubic meters gives; 5 million kiloliters of water = 5109 liters = The calculating the mass of water by multiplying the density of water (assumed 1000kg/m3) by the volume calculated above; Mass = Thus giving the potential energy as; Taking note that 1 Watt= 1 Joule/sec, and that there are seconds in a year which gives; = =4.

8167 Megawatts.Part 2.The power estimate given above can be rationalized by allowing for the following factors:Not all the rain that falls appears as surface runoff;Not all the runoff appears in streams that are worth damming;If the descent is at too shallow a slope, piping difficulties limit available head.It has been estimated that around 34% of the rainfall is wasted and uncollected as surface runoff at Bhakra.Out of the remaining 66%, around 12% of the water run off in streams is not worth damming.

Therefore, a net amount of 54% of the annual rainfall is estimated to be utilized for the production of hydroelectricity. The total annual rainfall, which is termed as utilized, would be:=Therefore, the actual annual production would be, P.E. = mgh, m =This gives the potential energy as P.E. = which then gives, = Part 3.Bhakra Dam is a concrete gravity-arch dam. The dam was part of the larger multipurpose Bhakra Nangal Project whose aims were to prevent floods in the Sutlej-Beas river valley, to provide irrigation to adjoining states and to provide hydro-electricity.

Construction of the Bhakra Dam was started in the year 1948 and was completed in 1963. It is 740 ft. (226 m) high above the deepest foundation and is the highest Concrete Gravity dam in Asia and Second Highest in the world (compare Hoover Dam at 732 ft).There are two power houses namely Left Bank Power Plant and Right Bank Power Plant. The power houses are connected on either side by underground cable galleries with the switch yard from where transmission lined take off.The two power houses have a total capacity of 1000 MW and a smaller subsidiary dam, called the Nangal Dam is located a little downriver.

This annual production of electricity is around of 1000MW is significantly different when compared to the estimated value given in Parts 1 and 2. The reason for this disparity has been attributed to the fact that the Bhakra Nangal dam is fed by a perennial river and as such there is a much larger inflow of water than what can be obtained from rainfall alone.The 166 km Gobindsagar Reservoir, named after Guru Gobind Singh, is created by this dam. The dam provides irrigation to 10 million acres (40,000 km) of fields in Delhi, Haryana, Punjab, Rajasthan and Himachal Pradesh.

References:Serway, Raymond A.; Jewett, John W. (2004). "Physics for Scientists and Engineers,6th ed." Brooks/ColeNelson, Robert A., "The International System of Units Its History and Use in Science and Industry". Via Satellite, February 2000.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Solution to the hydro-potential assignment Essay”, n.d.)
Solution to the hydro-potential assignment Essay. Retrieved from https://studentshare.org/miscellaneous/1528893-solution-to-the-hydro-potential-assignment
(Solution to the Hydro-Potential Assignment Essay)
Solution to the Hydro-Potential Assignment Essay. https://studentshare.org/miscellaneous/1528893-solution-to-the-hydro-potential-assignment.
“Solution to the Hydro-Potential Assignment Essay”, n.d. https://studentshare.org/miscellaneous/1528893-solution-to-the-hydro-potential-assignment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Solution to the hydro-potential assignment

Integrated Marketing For Hydrox

The paper "Integrated Marketing For Hydrox" is based on the development of an integrated sales and marketing campaign that is designed to resuscitate the Hydrox brand, which is perceived to be a dead brand.... It discusses the success and failure and measurements that can be used as a checklist.... hellip; This evaluation checklist compares the feedback being received during the implementation of the marketing plan and the goals that had been set....
2 Pages (500 words) Assignment

Solution Outline

Some of these activities include immediate response, recovery efforts, disaster mitigation, and preparedness efforts.... Considering the magnitude… and coverage area of a disaster, EM might be a multi-organizational exercise that brings on board government agencies, volunteer organizations, media, and other critical stake holders....
5 Pages (1250 words) Assignment

Operating Segments that Comprise the Bulk of Alcoas Business

The quarterly sales numbers are taken as the total third party sales for the six product segments.... The total of these third party sales numbers differs slightly from the reported annual sales number.... The difference does not make a significant difference to the ROE… This improvement is from the higher Net Profit Margin of 8....
5 Pages (1250 words) Assignment

Ethics of Solar Laboratory,Hydro Power Laboratory and Wind Power Laboratory

Ethical considerations usually ensure that production processes are not only focused on quality, but also on safety of the personnel involved, environment and the general public.... On the… The current society is facing various challenges arising from production processes that have significant impacts on the quality of human life and the In this regard, the general public and other concerned stakeholders are on a high alert on issues ascribed to ethic on the energy production sector....
4 Pages (1000 words) Assignment

Quantitative and qualitative assignment wk3

It is imperative to determine to come up with clear and well-defined solution to get through the constraint.... Most of the times, the proposed options to overcome a… It is imperative in such a situation to evaluate other factors apart from the basic requirement that provide the solution to a particular constraint.... It is imperative to determine to come up with clear and well-defined solution to get through the constraint.... It is imperative in such a situation to evaluate other factors apart from the basic requirement that provide the solution to a particular constraint....
1 Pages (250 words) Assignment

Vehicular Air Pollution

In the paper “Vehicular Air Pollution” the author provides a technical research report on vehicular air pollution and alternative fuels for the future, along with his recommendation for the choice of the most appropriate fuel.... He has considered air pollution caused by public and private transport....
12 Pages (3000 words) Assignment

Technological and Market-Based Solutions

There exists no single solution to tackle climate change experienced though global warming, heat-trapping of Carbon (iv) oxide, methane and nitrogen (iv) oxide, thus different mechanism interrelate to help bring down gas emissions into the atmosphere.... The paper “Technological and Market-Based Solutions” looks at the current climatic changes, which are not naturally occurring; they include a raft of political choices about policies such as the energy policy forming the basis of the radical shifts of climate conditions....
6 Pages (1500 words) Assignment

Fossil Fuel Power Plant Problem

… The paper "Fossil Fuel Power Plant Problem" is a great example of an assignment on environmental studies.... The paper "Fossil Fuel Power Plant Problem" is a great example of an assignment on environmental studies.... The commonly known technique is to purge exhaust gases via a solution of calcium carbonate that absorbs sulfur and produces calcium sulfate or plaster.... Therefore, efforts must be made continuously to get a workable solution of the air pollution from power plants already exist....
9 Pages (2250 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us