StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Investment and Portfolio Management at Woodvale Construction Limited - Assignment Example

Cite this document
Summary
The study "Investment and Portfolio Management at Woodvale Construction Limited" portrays a firm that has a huge experience in handling building and construction projects, providing solutions in the construction industry in terms of consultancy and provision of expertise to complete projects…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER93.7% of users find it useful
Investment and Portfolio Management at Woodvale Construction Limited
Read Text Preview

Extract of sample "Investment and Portfolio Management at Woodvale Construction Limited"

This will provide a basis for the activities involved in the project. A proper analysis will provide an efficient project plan that provides well for, the work breakdown structure, methodology, work packages, and the estimated time required to complete the project at hand.

A risk plan for the whole project will also be designed and implemented for the foreseen risks that could hamper the successful delivery of the project. Unmitigated risks in the construction industry have cost significant loss of property and life. The financial loss can be in terms of delay and over expenditure. Some of the serious risks that must have a proper management plan include design changes, cost overrun, project process approval, safety, and the conditions of the sites among others.

Risk Plan

 

RISK FACTOR

RISK RANK

RISK CONTRIBUTORS

MITIGATION & CONTINGENCIES

Technology

 

 

 

Safety

 

 

 

Funding

 

 

 

Time/schedule

 

 

 

Quality Requirements

 

 

 

Number of Participants

 

 

 

Regulatory involvement

 

 

 

Disruption of Regular services

 

 

 

Other unspecified Risks

 

 

 

The occupants of the building will have to stay there during the construction and the execution of the project is designed to prevent disruption of supply. The normal drainage flow will be maintained.

Figure 1.0

The project will be divided into three major activities namely preparation, lifting, and reinforcing the building. The preparation will involve the following activities i.e. plans and permits, assembly of machines, cleaning of the soil, temporal removal of ducts, removal of the floor, removal of the walls, installation of ducts system back, and supplying of heat to restore warmth. During these activities, the residents will not be required to vacate their houses but there will be a temporal disruption of their normal services. This phase will take an estimated 27 days.

The lifting phase will include the following activities, assembly of the machinery, removing of the porch, installation of the jacks, lifting of the building, and finally, transfer of the soil to another place This phase will take an estimated 6 days to complete. The final phase will include activities such as additional excavation, foundation replacement, lowering of the building, framing, refitting of the furnace, and finishing. This phase will take 11 days to finish.

Figure 2.0

Figure 2.0 shows the relationship between the activities projected to finish the project. The diagram also outlines the resources assigned to each activity and the flow in which the activities will be carried out. This arrangement of activities helps to provide guidance at a glance. The project coordinator is able to see a summarized flow of activities.  The summary shows how the activities flow for quick planning.

Figure 3.0

Plans and permits will consume $ 160 dollars, cleaning of the soil $320, temporary removal of pipes $160, and supply of heat for warmth $320. This first phase will cost a total of $1,280. The lifting phase will cost a total of $640 with the assembly of machinery costing $80, removing of the porch $120, installation of jacks $320, and lifting the building $120. The last phase will cost be the most expensive with a total cost of $960 with the following breakdown of the costs. Foundation Replacement $360, lowering of the building to the new basement $120, framing $80, refitting the porch $80, and the finishing of associates ducts $320.

Figure 4.0

The entire project will consume a total of $ 2880 in terms of cost and 272 hours in terms of time.

Figure 5.0

The work breakdown structure above shows the amount of time taken by each activity. It shows the start and finishes dates for each activity. In addition to that, WBS also offers the project coordinator an opportunity to see the relationship and the flow of activities within the project.

 

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Final project Assignment Example | Topics and Well Written Essays - 1750 words”, n.d.)
Final project Assignment Example | Topics and Well Written Essays - 1750 words. Retrieved from https://studentshare.org/management/1687131-final-project
(Final Project Assignment Example | Topics and Well Written Essays - 1750 Words)
Final Project Assignment Example | Topics and Well Written Essays - 1750 Words. https://studentshare.org/management/1687131-final-project.
“Final Project Assignment Example | Topics and Well Written Essays - 1750 Words”, n.d. https://studentshare.org/management/1687131-final-project.
  • Cited: 0 times

CHECK THESE SAMPLES OF Investment and Portfolio Management at Woodvale Construction Limited

Music: Entertainment Law (Portfolio)

The paper mainly speaks about Agency law as in the London festival 2012 and chief proponents behind this law, time of enforcement and the area of application and enforceability.... ... ... ... ... ... ... ... The festival will embed the city with giant screens across 22 towns and cities across UK preparing the entertainment platform for thousands of people throughout the day (London 2012 Festival Hits the Big Screens to Mark Opening Day, 2012)....
14 Pages (3500 words) Essay

Portfolio management

Equity Valuation and portfolio management.... Investment Analysis and portfolio management.... Consequently, this paper seeks to dissect the portfolio construction process, offering portfolio management Portfolio construction The process of portfolio construction is normally designed to make sure that the allocations to managers and investment strategies are consistent with the risk and return goals of the portfolio.... The process of portfolio construction is normally designed to make sure that the allocations to managers and investment strategies are consistent with the risk and return goals of the portfolio....
2 Pages (500 words) Term Paper

Investment and Portfolio Analysis

The paper "investment and portfolio Analysis" is a great example of an assignment on finance and accounting.... The paper "investment and portfolio Analysis" is a great example of an assignment on finance and accounting.... Explain in your own terms how the Markowitz efficient frontier might help a portfolio manager identify appropriate investments.... For an investor to identify an appropriate investment, the stocks' risk, standard deviation, and expected return are plotted on a curve(Fabozzi & Markowitz, 2011, PG....
14 Pages (3500 words) Assignment

Investments and Portfolio Management - Bank of Queensland Ltd and Bendigo and Adelaide Bank Ltd

The paper "Investments and portfolio management - Bank of Queensland Ltd and Bendigo and Adelaide Bank Ltd " is a perfect example of a finance and accounting case study.... The paper "Investments and portfolio management - Bank of Queensland Ltd and Bendigo and Adelaide Bank Ltd " is a perfect example of a finance and accounting case study.... The Australian Foundation Investment Company is a limited company that deals with a managing a variety of Australian stocks....
7 Pages (1750 words) Case Study

Explanation of the Investments that Is Due to Inherited by Dr Foster

Therefore, in order to secure future monetarily, every individual must involve in the construction of a sound portfolio without any delay (Marston, 2011).... Wealth management is an important aspect for all individuals engaged into professional and commercial services in order to understand their long and short term financial objectives.... Wealth management also reveals the difference between the actual wealth possessed by an.... Wealth management is an important aspect for all individuals engaged in professional and commercial services in order to understand their long and short term financial objectives....
10 Pages (2500 words) Case Study

Investment Policy and Portfolio Development

The paper 'Investment Policy and portfolio Development' is a forceful example of a finance & accounting business plan.... The paper 'Investment Policy and portfolio Development' is a forceful example of a finance & accounting business plan.... This proposal serves to give a clear understanding between the advisor and the investor as to the investment objectives, goals, and management policies applicable to the investment portfolio of the investor....
9 Pages (2250 words)

Investment Strategies and Portfolio Management - Nelly Capital

The paper "Investment Strategies and portfolio management - Nelly Capital " is a perfect example of a finance and accounting case study.... The paper "Investment Strategies and portfolio management - Nelly Capital " is a perfect example of a finance and accounting case study.... Traditionally, the investment climate in a country or in the world refers to the prevailing financial and economic conditions that affect the investors in a place.... Traditionally, the investment climate in a country or in the world refers to the prevailing financial and economic conditions that affect the investors in a place....
10 Pages (2500 words) Case Study

Risk Management - Portfolio Investment

X), Fair Media limited (FXJ.... The paper 'Risk management - Portfolio Investment' is an excellent variant of the assignment on finance & accounting.... The paper 'Risk management - Portfolio Investment' is an excellent variant of the assignment on finance & accounting.... The paper 'Risk management - Portfolio Investment' is an excellent variant of the assignment on finance & accounting.... This project embarks on investing 20 million Australian Dollars on a portfolio that is made up of investments....
11 Pages (2750 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us